Find a TenderAwarded
Published 13 Dec 2023, 12:20 GMT

Official UK procurement notice

Replacement of Circuit Switch Data (CSD) Modems and related Telemetry Equipment (for use with Technolog Cello-MO Telemetry Systems)

Official notice

Authority: Wales & West Utilities Limited

GoodsNegotiated without publication of a contract notice
Budget not disclosedValue not published
Awarded 12 Dec 2023

What is being bought

Published requirement description

Wales and West Utilities Ltd (WWU) operate a UK Gas distribution network, this is a notice to award a contract for provision CSD hardware within the Technolog Cello-MO Telemetry.

Pressure control is critical to reduce excessive pressure and leakage in the network ensuring safety and environmental risks are limited. Self-learning low pressure management and profiling is a key contributor to lowering gas emissions.

Ofcom have approved BT Openreach to remove wholesale line rental (PSTN Copper lines) in the UK by 2025 upon which the current gas control system relies and as such an alternative solution is required.

We require a self-learning, forecast and profiling solution with control equipment and supporting communications solution capable of varying the outlet pressure of the governor to suit network demand; pressures must follow a self-learnt profile to be raised at periods of high demand and decreased at periods of low demand automatically within safe limits

CPV: For the gas industry · Telemetry and control equipment

The lotProcurement structure

single lot · no lot value published
Lot #1Telemetry

Telemetry

The currently deployed low pressure gas control platform is unique to a single provider's proprietary solution; The current provider is Technolog Ltd and their forecast and profiling solution is in use by all UK Gas Distribution networks. We believe that there are no alternative telemetry systems in the market with the capability to operate without mains power, without copper phone lines and with the ability to execute automatic control actions of a gas governor autonomously within fail safe limits.

Communications

The Technolog Ltd. telemetry solution relies upon mobile digital communications. The digital communications used must have 4G NBIOT / CATM - IP or 5G NBIOT / CATM - IP available in time to meet the commencement of the roll out in Q1 2024, to meet the March 2025 completion deadline of the project.

The solution must be deployed in its entirety across 431 sites to ensure continued operation of the gas network. The target completion date is the end of December 2024

A telemetry solution, if offered, must -

  1. Provide a self-learning, forecast and profiling solution with control equipment capable of varying the outlet pressure of the in situ Technolog Ltd. Gas governors to suit network demand; pressures must follow a self-learnt profile to be raised at periods of high demand and decreased at periods of low demand automatically within safe limits.
  2. Enable data from District Governors to feed into the profiling solution over a reliable communications solution without the use of copper phone lines PSTN or CSD mobile communications.
  3. Enable logger data at low point extremities to feed into the profiling solution over a reliable communications solution without the use of copper phone lines or CSD mobile communications.

If a communications solution is offered, it must meet the following requirements -

  1. If a solution for both Telemetry and communications is offered -

a. The communications must work with the telemetry hardware proposed above

b. The communications must work without a PSTN line

c. The communication system must work without a mains power supply

d. The solution must include provision of a service for managing any failures within an agreed SLA for a Critical Network Infrastructure platform.

  1. If a communication solution only is offered -

a. The communications must work with Technolog telemetry hardware - Rugged Modem Operations (RMO), Newlog 4DR and Gas Station 4 (GS4).

b. The communications must work without a PSTN line

c. The communication system must work without a mains power supply

d. If Mobile Digital communications is proposed

i. The solution must include provision of SIM cards

ii. The solution must include provision of Airtime

iii. The solution must include provision of a service for managing communication failures within an agreed SLA for a Critical Network Infrastructure platform.

iv. It must have 2/4G NBIOT / CATM - IP in time to meet the commencement of the roll out in Q1 / Q2 2024 to meet the March 2025 completion deadline of the project.

Delivery: UK · Wales & South-West of England
Extensions: Contractual review and extension mechanisms

Procedure terms & legal framework

From the official record
Procedure method
Negotiated without publication of a contract notice
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
13 Dec 2023, 12:20 GMT
Last source update
13 Dec 2023, 12:20 GMT
Authority reference
WWU1358
FTS notice number
2023/S 000-036637
Classification (CPV)
For the gas industryTelemetry and control equipment
Delivery area
UK
Official registry OCID
ocds-h6vhtk-04253a Find a Tender
Why no open competition

The works, supplies or services can be provided only by a particular economic operator due to absence of competition for technical reasons

Published justification

The currently deployed low pressure gas control platform is unique to a single provider's proprietary solution; The current provider is Technolog Ltd and their forecast and profiling solution is in use by all UK Gas Distribution networks. We believe that there are no alternative systems in the market with the capability to operate without mains power, without copper phone lines and with the ability to execute automatic control actions of a gas governor autonomously within fail safe limits.

The solution must be deployed in its entirety by end of March 2025 to ensure continued operation of the gas network.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Contracts signed 1latest 12 Dec 2023

1 further award records carry no date or value.

Contracts

  • Contract 036637-2023-1 · supplier not published

    Signed
    12 Dec 2023
    Value
    —
    Status
    active

Contracting authority & participating public bodies

Wales & West Utilities

Contracting authorityProduction, transport and distribution of gas and heat GB-COH: 05046791 Wales & West House, Spooner Close, Coedkernew, NEWPORT, Wales, NP108FZContact name, email

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.