Find a TenderPlanned procurementPreliminary market engagement notice
Published 24 Nov 2025, 11:59 GMT

Official UK procurement notice

RIIO-GT3 Control System Replacement FEED Framework Expression of Interest

Authority: NATIONAL GAS TRANSMISSION PLC

Framework agreementServicesAbove thresholdUtilities
Sectors: Architecture & Engineering (71) Delivery: Delivery location not published
Planned pipeline valueValue not publishedpipeline notice, not a live tender
Tender notice expected Date not publishedfrom the planned procurement notice
Framework period 8 yrsends 7 Jun 2034 · starts 8 Jun 2026

What is being bought

Published requirement description

This notice is published to advertise a preliminary market engagement exercise being conducted by National Gas Transmission PLC ("NGT"). NGT is seeking expressions of interest and feedback from the market to support and refine its approach to a forthcoming procurement process in respect of the RIIO-GT3 Control System Replacement FEED Framework.

Who are NGT

NGT play a vital role in delivering gas to millions of people across Great Britain. NGT owns, manages, and operates the National Transmission System ("NTS") in Great Britain, making gas available when and where it's needed. NGT ensure that the network is safe, reliable and available, and that it delivers value for our customers and stakeholders, while minimising impact on the environment.

What is the Control System Replacement Programme

The overarching scope of each project in the programme is the complete replacement and upgrading of the compressor station's control systems to enhance cyber resilience. This involves modernising legacy infrastructure, implementing robust cybersecurity measures, and ensuring that the control systems are capable of withstanding evolving digital threats. The upgrades are intended to safeguard operational integrity, protect critical assets, and align with national and international standards for cyber-secure infrastructure.

RIIO-GT3 Control System Replacement FEED Framework

As NGT approaches the end of RIIO-GT2, it is preparing for its next regulatory period RIIO-GT3 which will cover April 2026 - March 2031. For RIIO-GT3 NGT is exploring an alternative delivery model for the remaining projects in the control system replacement programme, whereby a FEED Partner(s) would be appointed to carry out each projects FEED study. The FEED stage defines the technical, safety, cyber, and operational requirements for the full replacement of control systems across the site, ensuring compliance with NGT standards and NIS Directive obligations.

How to express an interest

Interested parties are to express an interest by completing and returning the response template. Please request the response template from callum.sparks@nationalgas.com.

Additional Information

Any subsequent competition will be issued using Achilles UVBD (achilles.com) therefore current registration is advised.

CPV: Engineering services

The lotProcurement structure

single lot · no lot value published
Lot #1Planned 8 yrs
Contract period: 8 Jun 2026 – 7 Jun 2034 (8 yrs)

Who is likely to bid for this lot ↓

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “RIIO-GT3 Control System Replacement FEED Framework Expression of…” is a framework: the contest is a place on its panel, not a single contract.

Pipeline intelligence · planning stage: how this market runs before the tender is published

How NATIONAL GAS TRANSMISSION PLC buys Engineering services (CPV 7130), and who usually turns up

NATIONAL GAS TRANSMISSION PLC’s published record next to the market for the same work. Compared with other frameworks and DPS only. Whole-market view: Engineering services (CPV 7130) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

Question for the bid
This buyerNATIONAL GAS TRANSMISSION PLC · all categories
What to do with it
How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 10 of 29 known-size awards · market: CPV 7130 · UK-wide, n=8
34%63%

Small firms have won here. Neither number says whether you qualify; it describes who has been winning.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Local means the winner is registered in the region where that award was delivered.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: 20 of 20 known-location awards · market: CPV 7130 · UK-wide, n=11
100%73%

Most of this buyer’s recorded winners were registered in the region where that award was delivered.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the bid deadline to the award date, on competitions that published both.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: no decision dates published · market: CPV 7130 · UK-wide, n=5
—85 days

Half of these awards have an award date within 85 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

The market share is a minimum: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: 2 procurements with awards; rival share unknown · market: division 71 · West Midlands (authority’s region), n=25
—8%

Awards are recorded, but published direct routes and bid counts do not establish this buyer’s share.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyerToo few to chart: 1 lot with bid counts, 5 needed · all categories
The market22 lots with bid counts · CPV 7130 · UK-wide
5% had one bid
Market · select a colour for counts
1 bid5%
Market: 1 of 22 lots with published bid counts.
2–314%
Market: 3 of 22 lots with published bid counts.
4–60%
Market: 0 of 22 lots with published bid counts.
7+82%
Market: 18 of 22 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

On a framework or DPS, prices are agreed when work is called off.

Past prices are a guide, not a bid price.

Last 36 months.

Not comparable on a framework or DPS: the price is set later, on each call-off.

2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 713096 monthsEstimate not published
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 95 past lots.

A forecast, not a list of bidders.

—No model forecast yet0% chance of a single bid
Past bids on 95 similar lots
1 bid0%
0 of 95 similar past lots received 1 bid (0%).
2–313%
12 of 95 similar past lots received 2–3 (13%).
4–617%
16 of 95 similar past lots received 4–6 (17%).
7+71%
67 of 95 similar past lots received 7+ (71%).
Comparable past lots usually drew 10 bids.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Planned procurement
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
24 Nov 2025, 11:59 GMT
Last source update
24 Nov 2025, 11:59 GMT
FTS notice number
2025/S 000-076412
Latest notice
Preliminary market engagement notice (UK2)
Classification (CPV)
Engineering services
Delivery area
Not published
Official registry OCID
ocds-h6vhtk-05e73f Find a Tender

How it was run

Official notice
Appointment period ends
—

Timeline

24 Nov 2025 → 8 Jun 2026 · 3 dates
  1. Planning notice published336 days ago
    24 Nov 2025, 11:59 GMT
  2. Market engagement313 days ago
    17 Dec 2025, 23:59 GMT

    Interested parties are to express an interest by completing and returning the response template. Please request the response template from callum.sparks@nationalgas.com.

  3. Contract starts141 days ago
    8 Jun 2026, 00:00 BST

Notice history

1 event · 1 release on Find a Tender
  1. Preliminary market engagement notice published
    24 Nov 2025, 11:59 GMT
    UK2

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

NATIONAL GAS TRANSMISSION PLC

Contracting authorityPrivate utility GB-COH: 02006000 · GB-PPON: PBXW-9626-VNZM National Grid House Warwick Technology Park, Warwick, West Midlands, CV34 6DAContact name, email

Official documents & specifications (1)

Official links; attachments are not copied

Notices published for this procedure