SU172(26) Energy Centre and Union House District Heat Network Connection Works

Authority: Swansea University (Education)

WorksCompetitive flexible procedureAbove thresholdSME suitable
Published estimate£5,000,000≈ £2.5m / year · £6,000,000 inc. VAT
Submission deadline 30 Oct 20263d 0h left
Clarification cut-off 28 Sept 2026questions to the authority
Contract term 2 yrsends 30 Nov 2028 · starts 30 Nov 2026

What is being bought

Published requirement description

Swansea University is seeking to appoint a suitably qualified contractor to deliver works associated with the Energy Centre upgrade and new District Heat Network (DHN) connection to Union House, forming part of Swansea University’s wider decarbonisation programme at Singleton Campus. The project comprises a significant upgrade to campus heat generation and distribution infrastructure, centred on the installation of approximately 3MW of modular air source heat pump (ASHP) capacity.

The project has been developed to RIBA Stage 3 with a fully coordinated design prepared to inform tendering and delivery. The works will be procured via a two-stage tender process, allowing for early contractor engagement during Stage 1 to support design development, buildability, programme optimisation and cost certainty ahead of entering a Stage 2 construction contract.

  • How the procedure runs: This is an OPEN Procedure - NOT a competitive flexible procedure

CPV: Construction work

The lotProcurement structure

single lot · value published
Lot #1 2 yrsSMEPublished value£5,000,000
Contract period: 30 Nov 2026 – 30 Nov 2028 (2 yrs)Value: £5,000,000 exc. VAT · £6,000,000 inc. VAT
Delivery: WalesEligibility: SME eligibleTurnover guideline: ~£4,986,339/yr≈ 2× annual value

Who is likely to bid for this lot ↓

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids are scored
Quality: 70%Price: 30%
Published sub-criteria (2)
  • Quality: 70%
  • Cost: 30%
Published award criteria (2)
  • Quality
  • Cost

No conditions of participation were published on the notice; check the tender documents.

What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
  • Turnover usually expected at this size: about £4,986,339 (twice the annual value).

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula. Turnover is an indicative market norm (≈2× annual value), not a published condition.

Competition analysis · published record, not a forecast of who will bid

How Swansea University buys Construction work (CPV 45), and who usually turns up

Swansea University’s published record next to the market for the same work. Frameworks and DPS are left out: they draw different bid counts. Whole-market view: Construction work (CPV 45) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

Question for the bid
This buyerSwansea University · division 45
The marketConstruction work (CPV 45) · Wales (Cymru)
What to do with it
How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 3 of 5 known-size awards · market: division 45 · Wales (Cymru), n=242
60%81%

Small firms have won here. Neither number says whether you qualify; it describes who has been winning.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Local means the winner is registered in the region where that award was delivered. The market figure counts awards delivered in Wales (Cymru).

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: 2 of 6 known-location awards · market: division 45 · Wales (Cymru), n=423
33%76%

Most of this buyer’s recorded winners were registered outside the region where that award was delivered. Less of this buyer’s work stays local than in this market: 33% against 76%, n=6.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the bid deadline to the award date, on competitions that published both.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: 4 decided notices · market: division 45 · Wales (Cymru), n=109
72 days43 days

Half of these awards have an award date within 72 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

The market share is a minimum: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: exactly 2 of 6 procurements with awards had no recorded rival · market: division 45 · Wales (Cymru), n=429
33%26%

Direct awards or one recorded bid are common here. Check the route before spending time on a bid.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer19 lots with bid counts · all categories
16% had one bid
The market115 lots with bid counts · division 45 · Wales (Cymru)
15% had one bid
Buyer / market · select a colour for counts
1 bid16% / 15%
Buyer: 3 of 19 lots with published bid counts. Market: 17 of 115 lots with published bid counts.
2–326% / 37%
Buyer: 5 of 19 lots with published bid counts. Market: 42 of 115 lots with published bid counts.
4–626% / 35%
Buyer: 5 of 19 lots with published bid counts. Market: 40 of 115 lots with published bid counts.
7+32% / 14%
Buyer: 6 of 19 lots with published bid counts. Market: 16 of 115 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

Past prices are a guide, not a bid price.

Last 36 months.

This buyer14 lots with estimate and award · all categories
29% below estimate
The market108 lots with estimate and award · division 45 · Wales (Cymru)
53% below estimate
Buyer / market · select a colour for counts
Below estimate29% / 53%
Buyer: 4 of 14 lots with an estimate and award. Market: 57 of 108 lots with an estimate and award.
Within ±2%64% / 22%
Buyer: 9 of 14 lots with an estimate and award. Market: 24 of 108 lots with an estimate and award.
Above estimate7% / 25%
Buyer: 1 of 14 lots with an estimate and award. Market: 27 of 108 lots with an estimate and award.
2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 4524 monthsSME suitablePublished estimate£5.0m

This lot lists more than one class in CPV 45. The comparison uses that group.

Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.

A forecast, not a list of bidders.

4expected bids8% chance of a single bid
similar past contests in this category: 205
Forecast chances for this lot
1 bid8%
Chance this lot gets 1 bid: 8%. This is a forecast.
2–327%
Chance this lot gets 2–3: 27%. This is a forecast.
4–652%
Chance this lot gets 4–6: 52%. This is a forecast.
7+14%
Chance this lot gets 7+: 14%. This is a forecast.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

Based on 171 comparable awards. Each lot reflects its own category; forecasts for different lots of the same notice are not comparative.

A statistical guide from past awards, not a price to bid.

£4.9m3% below estimate
171 comparable awards
Forecast compared with the buyer’s estimate
Middle 50%£4.7m–£5.0m
Half of likely prices fall between £4,729,793 and £5,000,000.
Estimate£5.0m
The buyer published an estimate of £5,000,000 for this lot.
A 15% chance the award lands exactly on the estimate.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

SupplierThis buyer’s earlier contractLotAward valueWhy listed
J W Bowkett ( Electrical Installations ) LtdWorked for this buyerSU152(25) LED Lighting Project – Phase 3ended Mar 2026—£2.0mSimilar wording and category

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

SupplierWon in this categoryLive contractsAward vs estimate
2 wins in Wales (Cymru)28 panel places
£258m146 awards in 36m · last 1 months ago14 live · £83m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

4% below n=6
4 wins in Wales (Cymru)38 panel places
£79m108 awards in 36m · last 1 months ago10 live · £28m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

at estimate n=30
1 win in Wales (Cymru)8 panel places
£99m19 awards in 36m · last 3 months ago3 live · £5.1m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

7% below n=6
2 wins in Wales (Cymru)
£340k2 awards in 36m · last 2 months ago1 live · £120k
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
£8.9m18 awards in 36m · last this month4 live · £2.4m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Open for tender
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
12 Jun 2026, 15:52 BST
Last source update
22 Oct 2026, 09:54 BST
Award evaluation window
Submission end – 2 Nov 2026
FTS notice number
2026/S 000-074670
Latest notice
Tender notice (UK4)
Classification (CPV)
Construction work
Delivery area
Wales (UKL18)
Official registry OCID
ocds-h6vhtk-06b454 Find a Tender
How it runs

This is an OPEN Procedure - NOT a competitive flexible procedure

How to participate & submission route

Official notice Submit via Sell2Wales
Submission portal named on this notice: Sell2Wales · Who buys & how to bid on Sell2Wales
Supplier login requiredElectronic submission allowedLanguage: EN, CY
Access & registration note: Free Wales registration; eTenderWales runs on Jaggaer
Requests to participate (first stage)
—
Tender submission deadline
30 Oct 2026
Clarification deadline
28 Sept 2026, 00:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en, cy
Detailed submission instructions & authority contactsFrom official release
Published estimate £5,000,000 excludes VAT (£6,000,000 including VAT).

Timeline

12 Jun 2026 → 30 Nov 2026 · 8 dates
  1. Planning notice published136 days ago
    12 Jun 2026, 15:52 BST
  2. Next notice expected127 days ago
    21 Jun 2026, 23:59 BST
  3. Tender notice published81 days ago
    6 Aug 2026, 12:21 BST
  4. Clarification questions by29 days ago
    28 Sept 2026, 00:00 BST
  5. Latest notice published5 days ago
    22 Oct 2026, 09:54 BST
  6. Today
    26 Oct 2026
  7. Submission deadlinein 3 days
    30 Oct 2026
  8. Award decision expected byin 7 days
    2 Nov 2026, 23:59 GMT
  9. Contract startsin 34 days
    30 Nov 2026

Notice history

8 events · 4 releases on Find a Tender · since 12 Jun 2026
  1. Planned procurement notice published
    12 Jun 2026, 15:52 BST
    UK3
  2. Tender notice published
    6 Aug 2026, 12:21 BST
    UK4
  3. Status changed to active
    6 Aug 2026, 12:21 BST
  4. Deadline moved to 9 Oct 2026, 00:00 BST
    6 Aug 2026, 12:21 BST
    +25 days · was 14 Sept 2026, 00:00 BST
  5. Tender notice published
    2 Oct 2026, 15:44 BST
    UK4
  6. Deadline moved to 23 Oct 2026, 00:00 BST
    2 Oct 2026, 15:44 BST
    +14 days · was 9 Oct 2026, 00:00 BST
  7. Tender notice published
    22 Oct 2026, 09:54 BST
    UK4
  8. Deadline moved to 30 Oct 2026
    22 Oct 2026, 09:54 BST
    +7 days · was 23 Oct 2026, 00:00 BST
Published amendments (2)

Tender Submission date change

Tender Submission date change

Routine re-releases (4)
  • 2026-06: 1 release · 12 Jun 2026

Commercial outcome & contract awards

Nothing awarded yet
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Swansea University

Contracting authorityPublic undertakingWelsh devolved regulations apply GB-PPON: PTNV-7472-GRTW Procurement, Finance Dept., Swansea, Wales, SA2 8PPContact email

Official documents & specifications (4)

Official links; attachments are not copied

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Planned procurement notice planningPlanned procurement noticeUK3Planned procurement notice on Find a Tender