What is being bought
Published requirement descriptionThis project proposes the construction of three new floors added vertically to the existing single storey building. The existing storey accommodation generally contains teaching rooms, a library, and breakout spaces. The proposed new extended accommodation will generally comprise of new additional teaching spaces, as well as additional breakout areas, storage facilitates, and a new server room.
The proposed works will be procured through a single stage Design & Build route, based on RIBA Stage 3 Design information, based on an Open tender route as prescribed in the Public Contract Regulations (2015).
The net Construction costs are expected to be in the order of c. £5.5m - £6m. (inclusive of the elements listed in the ITT Schedule 5 Pricing; and exclusive of VAT).
The aspiration of the College is to commence with the building works during the College's none teaching periods that being during Summer 2023.
CPV: Architectural and related services · Building completion work · Building installation work · Construction work · Construction-related services · Engineering services · Site preparation work · Urban planning and landscape architectural services · Works for complete or part construction and civil engineering work
The lotProcurement structure
single lot · value publishedLot #1The College has been growing in student numbers for a number of years, with…Published value£5,750,000
The College has been growing in student numbers for a number of years, with significant growth in the last two years seeing the existing facilities nearing capacity. With particular growth in local priority areas of engineering, advanced manufacturing, healthcare and construction, as well as general growth in higher level qualifications through A-Levels and Degrees, the College is planning to expand its facilities to meet the increased demand.
The College have carried out an evaluation to explore future development opportunities, including dialogue with the Local Authority, to ensure that any future development is structured to develop a campus strategy that will deliver an excellent learning environment that responds to the site and its context, the ability to expand the College, and potentially connect with the town centre and increasingly engage with the wider community.
To meet this vision, the project proposes the construction of three new floors added vertically to the existing single storey building. The existing storey accommodation generally contains teaching rooms, a library, and breakout spaces. The proposed new extended accommodation will generally comprise of new additional teaching spaces, as well as additional breakout areas, storage facilitates, and a new server room.
The scope of the procurement is to appoint a Principal Contractor for the delivery of the University Building Extension. The successful tenderer/contractor awarded such a contract must be fully available to mobilise in early July 2023.
The Contract terms and conditions will be JCT Design & Build Building Contract (2016),with Special Conditions, which are available as part of the ITT.
The College has procured Project Team and Design Services to complete up to RIBA Stage 3.
The following Design Disciplines are proposed to be novated to the Principal Contractor.
- Architect (lead Designer) - ABW Architects
- Civil & Structural Engineering Consultants - Waterman Group.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
As outlined in the Invitation to Tender (ITT) documents, which are available at www.burnley.ac.uk/newbuildtender ↗
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 17 Apr 2023, 12:31 BST
- Last source update
- 17 Apr 2023, 12:31 BST
- Award evaluation window
- 30 May 2023 – …
- FTS notice number
2023/S 000-010947- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03bf24Find a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
- Performance terms
As outlined in the ITT documentation.
How it was run
Official notice- Submission deadline
- 30 May 2023, 12:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bid validity
- 90 days from the deadline
- Bids opened
- 30 May 2023, 14:00 BST
Timeline
17 Apr 2023 → 30 May 2023 · 3 dates- Notice published17 Apr 2023, 12:31 BST
- Submission deadline30 May 2023, 12:00 BST
- Bids opened30 May 2023, 14:00 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Royal Courts of JusticeReview body
Official documents & specifications (1)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria