Official UK procurement notice
Waste Packaging & Encapsulation Plant Distributed Control System
Authority: Sellafield Limited (Public body)
What is being bought
Published requirement descriptionDesign and build of a Distributed Control System for the Waste Packaging & Encapsulation Plant
CPV: Command, control, communication and computer systems · Computer control system
The lotProcurement structure
single lot · no lot value publishedLot #1The Waste Packaging and Encapsulation Plant (WPEP) is a two-line process plant…Planned
The Waste Packaging and Encapsulation Plant (WPEP) is a two-line process plant designed for encapsulating Flocculant (FLOC) arisings from the Enhanced Actinide Removal Plant (EARP) process, waste from the Segregated Effluent Treatment Plant (SETP) and the Effluent Plant Maintenance Facility (EPMF). The waste is encapsulated in stainless steel drums within a cement mix. Filled drums are lidded, and then monitored before being stored, initially in the WPEP Store, before being exported for longer term storage in the Encapsulated Product Stores.<br/><br/>The aim of the project is to replace the existing WPEP Distributed Control System (DCS) with a replacement control system based on modern technologies, whilst applying relevant Sellafield standards, guides and procedures. <br/><br/>The project aims to:<br/><br/>
- Replace the existing DCS hardware, system software and configuration with a modern control system ensuring that the plant continues to function in the same manner <br/>
- Incorporate the currently independent Drum Decontamination and Powders PLC functionality to the replacement WPEP control system<br/><br/>The operability of the replacement control system is to align, as closely as possible, to the existing control system to reduce the impact on operator training and the changeover between the two systems.<br/><br/>
- The replacement control system will be installed such that the existing control system remains in situ, providing a fall-back in the event of delays or commissioning issues. However, given space constraints, it may not be possible to do this in all instances and some existing equipment may be removed prior to installing elements of the replacement control system.<br/><br/>The scope of activities are to include (but not be limited to):<br/><br/>a) Familiarisation with the existing control system to aid understanding<br/>b) The production of detailed hardware and software designs, consistent with the relevant clauses specified in the standards and capable of satisfying the requirements specified in the User Requirement Specification (URS)<br/>c) Carrying out the manufacture and assembly of all items of hardware, consistent with the relevant clauses specified in the standards and capable of satisfying the requirements specified in the URS <br/>d) Implementing structured software, consistent with the functional requirements documentation<br/>e) Production and delivery of all supporting design documents, consistent with the relevant clauses specified in the standards and as listed in the URS<br/>f) Preparation and submission of Technical Queries (TQs)<br/>g) Carrying out the detailed design and build, of a simulation model, including the production of all supporting design documentation<br/>h) Carrying out testing in accordance with the relevant clauses specified in the standards and as described in the URS<br/>i) Carrying out training in accordance with the relevant clauses specified in the standards and as described in the URS <br/>j) Delivery of the system to the location specified in the contract documentation<br/>k) Provision of support during Setting to Work and Commissioning in accordance with the URS<br/><br/>The procurement will be carried out under the Open procedure. The scope of the contract includes the design, build, test & delivery to the Sellafield site. <br/><br/>Sellafield Ltd are exploring an opportunity to hold a market engagement day allowing parties potentially interested in bidding an opportunity to access further information. If a market engagement day is organised a further PIN outlining the time, date and location would be published. Additional information: The procurement has been designed as a single lot covering the design, build, test, and delivery. Due to the nature of the requirement, keeping the scope as one single lot will allow the successful organisation to efficiently manage the full end-to-end scope of the project. A period where interested parties can submit clarification questions will be initiated upon publishing of the Contract Notice within the Atamis eSourcing Portal.
Procedure terms & legal framework
From the official record · publisher note attached- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Goods
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 12 Aug 2024, 13:21 BST
- Last source update
- 12 Aug 2024, 13:21 BST
- Authority reference
C13138- FTS notice number
2024/S 000-025419- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0489dfFind a Tender
Publisher note: Additional CPV Codes:<br/>32573000: Communications control system<br/>42961000: Command and control system<br/>35711000: Command, control, communication systems<br/>35712000: Tactical command, control and communication systems
How it was run
Official noticeTender documents are also served through a separate tool: https://atamis-2464.my.site.com/s/Welcome ↗
- Submission deadline
- —
Timeline
12 Aug 2024 → 15 Nov 2024 · 2 dates- Notice published12 Aug 2024, 13:21 BST
- Tender notice expected15 Nov 2024
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published