Delta Housing Limited: Contract Register & Procurement Profile

Social housing register: Registered societyOther public bodyEast of EnglandChelmsford

Official UK PPONPCMV-1277-LCTG

Open now0no live notices
i

Tenders you can still bid for.

Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.

Notices, last 12 months27+125% vs prior 12 months (12)
i

Notices published in the last 12 months.

Counted per tender, not per lot, against the 12 months before where shown.

Typical bids per lot40% single-bid · 7 bid reports
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 7 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

Top-3 supplier share18%of 39 awarded procedures · 40 suppliers
i

How much of this buyer’s work goes to its three most frequent suppliers.

Share of its awarded tenders that name at least one of the top three. Each tender is counted once.

39 awarded tenders, 40 different suppliers.

Describes the record. It is not a sign of favouritism.

All awards we hold.

Contracts ending ≤18 months83 within 6 months
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

Published award value, 24m£3.9mnet · on 18 of 18 published values · top 5 = 70%
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

What they buy
i

What kind of work is bought here.

Notices by procurement category (CPV). A notice with several categories counts in each.

Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each

How they buy
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

Last 24 months · 39 notices · commercial tool and route as published on the notice, not a legal-regime claim

Commercial tool
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

  • Contract97%(38 notices)
    38 of 39 notices are Contract (97%).
  • Framework3%(1 notice)
    1 of 39 notices is Framework (3%).
Procedure route
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

  • Direct award38%(15 notices)
    15 of 39 notices are Direct award (38%).
  • Limited / restricted38%(15 notices)
    15 of 39 notices are Limited / restricted (38%).
  • Route not published13%(5 notices)
    5 of 39 notices are Route not published (13%).
  • Open10%(4 notices)
    4 of 39 notices are Open (10%).
Typical bids per lot
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 7 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

4robust · n=70% of lots drew a single bid
Deadline → award
i

How long this buyer takes to decide after bids close.

Middle value in days from the bid deadline to the award date, on this buyer’s own tenders.

Based on 4 decided tenders across all categories, last 24 months.

Last 24 months.

46 daysmoderate · n=4
Notice amendments
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on 39 notices across all categories, last 24 months.

Last 24 months.

03 of 39 notices amended
Award vs estimate
i

Do this buyer’s awards land above or below its own estimates.

Each lot’s published estimate against its award, on this buyer’s competitions, like for like.

Based on 3 lots with both an estimate and an award, last 24 months. Small sample.

A past pattern, not a price to bid.

Last 24 months.

11.7% below estimatemoderate · n=3

Who wins here
i

Which suppliers win the most here.

Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
Apex Lift & Escalator Engineers Limited37.7%33—
Saltash Enterprises Ltdframework/DPS on 125.1%23—
WSP UK Limited25.1%22—
Axis Europe25.1%22—
AJS Ltd25.1%224 Nov 2025
JAMIE COOK LTDframework/DPS on 112.6%12—
SPECIALIST BATHROOMS & PROPERTY SERVICES LIMITEDframework/DPS on 112.6%12—
T.E.B. (Builders) Limitedframework/DPS on 112.6%12—

The three most frequent suppliers are named on 18% of 39 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 40 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Published award value (24m)
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

£3.9mSum of published VAT-exclusive values on 18 of 18 published single-supplier values; the five largest make 70%; a further 21 published a VAT-inclusive amount only, kept apart.
Typical single-supplier award (24m)
i

The middle published award value for this buyer.

Middle value of the same awards as the total above.

Last 24 months.

£123k middle valuerobust · n=18Middle half £66k–£219k.
Largest published awards
i

The biggest published awards.

Awards to a single supplier with a published value, largest first, so you can check the totals against the notice.

A repeated framework total can appear here. Open the notice to check.

SupplierAwardedTermPublished value
Fire Safety Equipment Service and MaintenanceAJS Ltd4 Nov 20255 yrs · up to 7 yrs£951,113
≈ £190k/yr
Licenced Asbestos Removal and Remedial WorksDuctclean (Uk) Limited—3 yrs · up to 6 yrs£777,600 †
≈ £259k/yr
Lift Replacement WorksApex Lift & Escalator Engineers Limited—1.1 yrs£421,465 †
≈ £389k/yr
Non-Traditional Stock Condition SurveysMICHAEL DYSON ASSOCIATES LIMITED——£351,200 †
Electronic Payment SystemsAccess Paysuite Ltd——£242,617 †

Contracts ending
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

34 of 38 contracts carry an end date · not a retender forecast

Recent procedures

Latest 39 of 39 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
TSM Perception SurveysAwarded / complete13 Oct 2026—
Adaptations FrameworkFrameworkAwarded / complete14 Sept 2026—
Balustrade Remediation WorksAwarded / complete9 Sept 2026—
Treasury Advisory and Due Diligence WorkAwarded / complete9 Sept 2026—
Portfolio License - Asset Management SoftwareAwarded / complete3 Sept 2026—
Lift MaintenanceAwarded / complete3 Sept 2026—
Technology and Application ReviewAwarded / complete28 Aug 2026—
GIS Managed ServicesAwarded / complete27 Aug 2026—
External Audit 2027 onwardsAccounting and auditing servicesAwarded / complete14 Aug 2026£864,000
Tree Surgery & Invasive Species Services2 lotsForestry servicesAwarded / complete20 Jul 2026£591,666
Fire-damage reinstatement worksAwarded / complete17 Jul 2026—
Lift Replacement WorksAwarded / complete3 Jul 2026—
NHF SORs OneSuiteAwarded / complete26 Jun 2026—
Non-Traditional Stock Condition SurveysBuilding surveying servicesAwarded / complete24 Apr 2026—
Fire Safety Survey and Remediation Support ServicesAwarded / complete9 Apr 2026—
Fire Safety Remedial Works - Travers and Fowlers Road, Colchester replaces previous notice 2026/S 000-029718 created in errorAwarded / complete31 Mar 2026—
Fire Safety Remedial Works - Travers and Fowlers Road, ColchesterAwarded / complete31 Mar 2026—
Licenced Asbestos Removal and Remedial WorksAwarded / complete6 Mar 2026—
Fire Safety Equipment - Servicing and MaintenanceAwarded / complete6 Mar 2026—
RepairSenseSoftware package and information systemsAwarded / complete17 Feb 2026—

Search all 39 procedures for this authority →

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 34 of 38 published contracts have an end date; 0 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.