Department for Energy Security & Net Zero: Contract Register & Procurement Profile

GOV.UK register: Ministerial departmentCentral governmentGreater LondonLondonCentral purchasing body on 13 of 138 notices

Official UK PPONPDHQ-2163-WYMH

Open now0no live notices
i

Tenders you can still bid for.

Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.

Notices, last 12 months83+51% vs prior 12 months (55)
i

Notices published in the last 12 months.

Counted per tender, not per lot, against the 12 months before where shown.

Typical bids per lot410% single-bid · 20 bid reports
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 20 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

Top-3 supplier share15%of 143 awarded procedures · 154 suppliers
i

How much of this buyer’s work goes to its three most frequent suppliers.

Share of its awarded tenders that name at least one of the top three. Each tender is counted once.

143 awarded tenders, 154 different suppliers.

Describes the record. It is not a sign of favouritism.

All awards we hold.

Contracts ending ≤18 months3118 within 6 months
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

Published award value, 24m£170mnet · on 100 of 100 published values · top 5 = 79%
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

What they buy
i

What kind of work is bought here.

Notices by procurement category (CPV). A notice with several categories counts in each.

Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each

How they buy
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

Last 24 months · 138 notices · commercial tool and route as published on the notice, not a legal-regime claim

Commercial tool
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

  • Contract99%(137 notices)
    137 of 138 notices are Contract (99%).
  • Framework1%(1 notice)
    1 of 138 notices is Framework (1%).
Procedure route
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

  • Direct award52%(72 notices)
    72 of 138 notices are Direct award (52%).
  • Open24%(33 notices)
    33 of 138 notices are Open (24%).
  • Route not published18%(25 notices)
    25 of 138 notices are Route not published (18%).
  • Selective4%(5 notices)
    5 of 138 notices are Selective (4%).
  • Limited / restricted2%(3 notices)
    3 of 138 notices are Limited / restricted (2%).
Typical bids per lot
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 20 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

4robust · n=2010% of lots drew a single bid
Deadline → award
i

How long this buyer takes to decide after bids close.

Middle value in days from the bid deadline to the award date, on this buyer’s own tenders.

Based on 13 decided tenders across all categories, last 24 months.

Last 24 months.

41 daysrobust · n=13
Notice amendments
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on 138 notices across all categories, last 24 months.

Last 24 months.

032 of 138 notices amended
Award vs estimate
i

Do this buyer’s awards land above or below its own estimates.

Each lot’s published estimate against its award, on this buyer’s competitions, like for like.

Based on 13 lots with both an estimate and an award, last 24 months.

A past pattern, not a price to bid.

Last 24 months.

0.9% below estimaterobust · n=13

Who wins here
i

Which suppliers win the most here.

Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
Ricardo AEA Ltdframework/DPS on 185.6%38—
National Nuclear Laboratory74.9%6925 Sept 2026
Aether Limited74.9%59—
PricewaterhouseCoopers LLPframework/DPS on 164.2%26—
OVE ARUP & PARTNERS LIMITEDframework/DPS on 142.8%259 Apr 2026
UK CENTRE FOR ECOLOGY & HYDROLOGY42.8%14—
Frazer-Nash Consultancy Limitedframework/DPS on 142.8%1411 Jun 2025
Energy Systems Catapult Limited32.1%2422 Jul 2026

The three most frequent suppliers are named on 15% of 143 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 154 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Published award value (24m)
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

£170mSum of published VAT-exclusive values on 100 of 100 published single-supplier values; the five largest make 79%.
Typical single-supplier award (24m)
i

The middle published award value for this buyer.

Middle value of the same awards as the total above.

Last 24 months.

£76k middle valuerobust · n=100Middle half £29k–£259k.
Largest published awards
i

The biggest published awards.

Awards to a single supplier with a published value, largest first, so you can check the totals against the notice.

A repeated framework total can appear here. Open the notice to check.

SupplierAwardedTermPublished value
DESNZ - COMMS - Media Buying and PlanningWavemaker Ltd12 Jun 20263.9 yrs£50,000,000
≈ £13m/yr
IT Service Management and Development (SMD)Version 1 Solutions Limited28 Jul 20263 yrs · up to 5 yrs£50,000,000
≈ £17m/yr
Nuclear Safeguards Programme (NSP)National Nuclear Laboratory19 May 20263.5 yrs · up to 6.5 yrs£19,500,000
≈ £5.6m/yr
Financial Advisory Services for Sizewell CBarclays Bank PLC—3.6 yrs£9,000,000 †
≈ £2.5m/yr
Climate Services for a Net Zero Resilient World (CSN0W2)OVE ARUP & PARTNERS LIMITED—3.8 yrs£5,899,000 †
≈ £1.5m/yr

Contracts ending
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

128 of 183 contracts carry an end date, 11 estimated from the duration · not a retender forecast

Soonest 9 of 31 contracts ending within 18 months.

Recent procedures

Latest 50 of 206 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
Climate Ambition Support Alliance Phase 3 (CASA3)Foreign economic-aid-related servicesOpen2 Sept 2026£8,400,000
Great British Energy - Community Energy Shared Ownership document template creationEnergy-management servicesAwarded / complete1 Sept 2026£416,666
UNFCCC Review - BTR BelarusAwarded / complete1 Sept 2026—
North West- Digital and Technology Skills ProgrammeComputer-related professional servicesAwarded / complete25 Aug 2026£1,375,000
Reporting UK Non-Nuclear Radioactive DischargesData collection and collation servicesAwarded / complete24 Aug 2026£25,500
Audio Visual (AV) Event Support For International ConferenceAudio-visual equipmentAwarded / complete19 Aug 2026£150,000
IT Service Management and Development (SMD)Awarded / complete19 Aug 2026—
con_10007 DESNZ - COMMS - Media Strategy, Planning and BuyingAdvertising and marketing servicesAwarded / complete19 Aug 2026£50,000,000
Biomass Research ProgrammeResearch servicesOpen19 Aug 2026£4,080,000
Academic Training: National Security for Energy Security ProfessionalsAwarded / complete19 Aug 2026—
UNFCCC Reviews - In-Country BTR of Algeria, Germany, Cyprus, ZambiaAwarded / complete18 Aug 2026—
Provision of a Fuel Finder ServiceSoftware-related servicesPlanning11 Aug 2026£3,000,000
Conducting tests for HEM:FHS Model developmentAwarded / complete11 Aug 2026—
Continuous Improvement Action Tracker softwarecentral purchasing bodySoftware package and information systemsPlanning10 Aug 2026£0
Mission Innovation SecretariatAwarded / complete4 Aug 2026—
Greenhouse Gas Inventory Improvement Programme - 2  Energy, Waste, and Industrial Processes and Product UseResearch servicesOpen3 Aug 2026£3,010,000
Greenhouse Gas Inventory Improvement Programme - 2  Energy, Waste, and Industrial Processes and Product UseResearch servicesOpen3 Aug 2026£3,010,000
DDaT26425 - Zone Shape Management Tool (ZSSMT)central purchasing bodyGeological consultancy servicesPlanning3 Aug 2026£770,000
RAF 006/2627: Plug-in Solar PV Fire StudyAwarded / complete31 Jul 2026—
Industrial Decarbonisation Research Programme (IDRP)Research servicesOpen30 Jul 2026£4,691,000

Search all 206 procedures for this authority →

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 128 of 183 published contracts have an end date; 11 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.