University of Sunderland: Contract Register & Procurement Profile

DfE school register: Higher education institutionsEducationNorth East EnglandSunderland

Official UK PPONPVDN-7726-TBVN

Open now0no live notices
i

Tenders you can still bid for.

Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.

Notices, last 12 months13+63% vs prior 12 months (8)
i

Notices published in the last 12 months.

Counted per tender, not per lot, against the 12 months before where shown.

Typical bids per lot40% single-bid · 7 bid reports
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 7 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

Top-3 supplier share16%of 44 awarded procedures · 61 suppliers
i

How much of this buyer’s work goes to its three most frequent suppliers.

Share of its awarded tenders that name at least one of the top three. Each tender is counted once.

44 awarded tenders, 61 different suppliers.

Describes the record. It is not a sign of favouritism.

All awards we hold.

Contracts ending ≤18 months112 within 6 months · 6 estimated
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

Published award value, 24m£3.4mnet · on 9 of 9 published values · top 5 = 80%
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

What they buy
i

What kind of work is bought here.

Notices by procurement category (CPV). A notice with several categories counts in each.

Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each

How they buy
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

Last 24 months · 21 notices · commercial tool and route as published on the notice, not a legal-regime claim

Commercial tool
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

  • Contract100%(21 notices)
    21 of 21 notices are Contract (100%).
Procedure route
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

  • Open43%(9 notices)
    9 of 21 notices are Open (43%).
  • Limited / restricted38%(8 notices)
    8 of 21 notices are Limited / restricted (38%).
  • Route not published14%(3 notices)
    3 of 21 notices are Route not published (14%).
  • Direct award5%(1 notice)
    1 of 21 notices is Direct award (5%).
Typical bids per lot
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 7 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

4robust · n=70% of lots drew a single bid
Deadline → award
i

How long this buyer takes to decide after bids close.

Middle value in days from the bid deadline to the award date, on this buyer’s own tenders.

Based on 6 decided tenders across all categories, last 24 months.

Last 24 months.

48 daysrobust · n=6
Notice amendments
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on 21 notices across all categories, last 24 months.

Last 24 months.

08 of 21 notices amended
Award vs estimate
i

Do this buyer’s awards land above or below its own estimates.

Each lot’s published estimate against its award, on this buyer’s competitions, like for like.

Based on 3 lots with both an estimate and an award, last 24 months. Small sample.

A past pattern, not a price to bid.

Last 24 months.

0% at estimatemoderate · n=3

Who wins here
i

Which suppliers win the most here.

Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
IDENTITY CONSULT LIMITEDframework/DPS on 336.8%03—
A.BUCKLER HAULAGE LIMITED24.5%1212 May 2025
Work In Style24.5%12—
SPACE ARCHITECTS (EUROPE) LIMITEDframework/DPS on 224.5%02—
SCHNEIDER ELECTRIC LIMITED12.3%1127 Nov 2025
PROTEC FIRE DETECTION PUBLIC LIMITED COMPANY12.3%1111 May 2026
NST TRAVEL GROUP LIMITED12.3%11—
Planon Limited12.3%11—

The three most frequent suppliers are named on 16% of 44 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 61 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Published award value (24m)
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

£3.4mSum of published VAT-exclusive values on 9 of 9 published single-supplier values; the five largest make 80%; a further 6 published a VAT-inclusive amount only, kept apart.
Typical single-supplier award (24m)
i

The middle published award value for this buyer.

Middle value of the same awards as the total above.

Last 24 months.

£280k middle valuerobust · n=9Middle half £161k–£481k.
Largest published awards
i

The biggest published awards.

Awards to a single supplier with a published value, largest first, so you can check the totals against the notice.

A repeated framework total can appear here. Open the notice to check.

SupplierAwardedTermPublished value
Reg Vardy Air Handling UnitGemini Mechanical Services Ltd——£981,190 †
Adobe Licensing ETLAJisc Services Ltd——£609,162 †
Provision of Healthcare and Sport UniformWork In Style——£480,523 †
Planon CAFM Room occupancyPlanon Limited——£337,679 †
SpLD Assessment ServiceCF Psychology Group——£280,000 †

Contracts ending
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

41 of 50 contracts carry an end date, 19 estimated from the duration · not a retender forecast

Soonest 10 of 11 contracts ending within 18 months.

Recent procedures

Latest 50 of 50 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
Design, manufacture and installation of signage for the University of SunderlandSignageAwarded / complete12 Oct 2026£207,000
Automated Admissions Platform - University of Sunderland 0326Software package and information systemsCancelled1 Oct 2026£1,200,000
Teams Cloud Telephony serviceSoftware package and information systemsAwarded / complete2 Sept 2026—
Planon CAFM Room occupancySoftware package and information systemsAwarded / complete26 Aug 2026—
Provision of LED LightingLighting equipment and electric lampsAwarded / complete26 Aug 2026—
Adobe Licensing ETLASoftware package and information systemsAwarded / complete26 Aug 2026—
Provision of Healthcare and Sport UniformOccupational clothingAwarded / complete26 Aug 2026—
The Provision of Non Medical Support ServicesAwarded / complete16 Jun 2026—
Provision of Installation and Commission of Solar PV for the University of SunderlandSolar energyAwarded / complete13 May 2026£120,000
Fire Alarm Panel, Detectors and Sounders ReplacementAwarded / complete11 May 2026—
Reg Vardy Air Handling UnitMechanical engineering installation worksAwarded / complete23 Apr 2026—
Provision of Building Management System (BMS) Maintenance Services, comprising Planned Preventative Maintenance Services (PPM), Reactive Maintenance Services (REM) and Energy ReductionRepair and maintenance servicesAwarded / complete23 Mar 2026£750,000
Provision of Gown Hire and Photography Services for the University of SunderlandPhotographic servicesAwarded / complete23 Mar 2026£1,000,000
Edinburgh Lift ModernisationLift and escalator installation workAwarded / complete11 Mar 2026£264,000
Provision of Non Medical Support ServicesAdministrative social servicesOpen9 Mar 2026£145,000
Boiler, Heating, Ventilation and Air-Conditioning (HVAC) and Local Exhaust Ventilation (LEV) Maintenance ServicesRepair and maintenance services for pumpsAwarded / complete17 Jun 2025£168,000
SpLD Assessment ServiceSpecial education servicesAwarded / complete4 Jun 2025£308,000
North Shore Building Demolition for the University of SunderlandAwarded / complete22 May 2025—
Refurbishment of Precinct Halls of Residence Phase 2Refurbishment workPlanned22 May 2025£3,000,000
Prospect Building RefurbishmentRefurbishment workPlanned22 May 2025£12,000,000

Search all 50 procedures for this authority →

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 41 of 50 published contracts have an end date; 19 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.