West London NHS Trust: Contract Register & Procurement Profile
NHS ODS: NHS TRUST·Central government·Greater London·Southall
Official UK PPONPPPZ-6647-QHWHWebsitewestlondon.nhs.uk ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
27 awarded tenders, 24 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work4 procedures · 15%85 Health and social work services1 procedure · 4%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 26 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract100%(26 notices)
26 of 26 notices are Contract (100%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Direct award77%(20 notices)
20 of 26 notices are Direct award (77%).Route not published15%(4 notices)
4 of 26 notices are Route not published (15%).Limited / restricted4%(1 notice)
1 of 26 notices is Limited / restricted (4%).Open4%(1 notice)
1 of 26 notices is Open (4%).
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 26 notices across all categories, last 24 months.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| BEGA Construction Ltd | 2 | 7.4% | 2 | 2 | — |
| Commercial Services UK Ltd | 2 | 7.4% | 2 | 2 | — |
| Grosvenor Contracts Ltd | 2 | 7.4% | 2 | 2 | — |
| DC Emergency Systems | 1 | 3.7% | 1 | 1 | — |
| LOCATORS LIMITED | 1 | 3.7% | 1 | 1 | — |
| V.M. Construction Limited | 1 | 3.7% | 1 | 1 | — |
| PV Fit Ltd | 1 | 3.7% | 1 | 1 | — |
| TriAgg Construction Ltd | 1 | 3.7% | 1 | 1 | — |
The three most frequent suppliers are named on 22% of 27 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 24 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| WLT - St Bernard's LV2 Substation Upgrade | Playfords Limited | — | 8 mo | £1,494,216 † |
| Hammersmith & Fulham MHU Refurbishment Painting Works | V.M. Construction Limited | — | 7 mo | £253,635 † |
| -St Bernards Site Safety Works – Phase 2" | TriAgg Construction Ltd | — | 2 mo | £164,696 † |
| – Avebury Ward Refurbishment Final Account Payment | BEGA Construction Ltd | — | — | £157,854 † |
| NHSPS - Development Consultancy and Agency Services | NHS Property Services Limited | — | 1 yrs | £150,000 ≈ £150k/yr |
Contracts endingi
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
22 of 26 contracts carry an end date, 3 estimated from the duration · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| – Avonmore Ward External Windows and Doors Replacement | Commercial Services UK Ltd | 30 Oct 2026 | £43,531 |
| -H&F Atrium Underfloor Heating and Flooring Renewal Works | BEGA Construction Ltd | 13 Nov 2026 | £136,240 |
| -St Bernards Site Safety Works – Phase 2" | TriAgg Construction Ltd | 15 Nov 2026 | £164,696 |
| - replacement of emergency lighting systems Orchard MSU | DC Emergency Systems | 18 Jan 2027 | £115,150 |
| Curtains Provision and Maintenance Services 2026–2027 | Grosvenor Contracts Ltd | 31 Mar 2027 | £25,307 |
| Curtains Provision and Maintenance Services 2026–2027 | Grosvenor Contracts Ltd | 31 Mar 2027 | £25,307 |
| Hammersmith & Fulham MHU Refurbishment Painting Works | V.M. Construction Limited | 31 Mar 2027 | £253,635 |
| – Langley House Solar PV & Battery Storage Extension | PV Fit Ltd | 31 Mar 2027 | £128,764 |
| WL -Electric Vehicle Lease and Maintenance Services for FM | LOCATORS LIMITED | 17 Aug 2027 | £31,261 |
Recent procedures
Latest 37 of 37 procedures where this authority buys, is the authority the work is for, or runs the procurement
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 22 of 26 published contracts have an end date; 3 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.