Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 24 months
Showing 1,741–1,755
- Ends · in 234 daysExtension option · up to 30 Sept 2027
Thicket Crescent & Thicket Road Energy Efficient Retrofit Works - External Fabric Repairs
London Borough of Sutton · Local authority · Greater London
Incumbent: A P C BUILDING SERVICES (LONDON) LIMITED
This energy efficient retrofit project will deliver significant improvements to LBS housing stock, specifically, 45 Thicket Crescent, and 22 Thicket Road, Sutton, SM1. The purpose of this procurement was to facilitate the selection, and app…
- Published value
- £104k
- Annual run-rate
- £104kpublished value ÷ term, exc. VAT
- Term
- 22 Jun 2026 → 21 Jun 2027 · 1 yr · up to 30 Sept 2027 with extensions
- Reference
ocds-h6vhtk-05ab79
- Ends · in 234 days
UOECS0570262026
University of Exeter · Education
Incumbent: MERCURY CONSTRUCTION (SOUTH WEST) LIMITED
Undertake the priced schedule of works in accordance with the quotation entitled RofE Roborough Enabling Works, dated 8th May 2026 and works plan entitled Summer 2026 Thornlea Site Mitigation dated 20th April 2026, (excluding new acoustic d…
- Published value
- £27k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 22 Jun 2026 → 21 Jun 2027 · 1 yr
- Reference
ocds-h6vhtk-06edac
- Ends · in 235 days
Specialist Ironwork Repairs/replacements
Newcastle City Council · Local authority · North East England
Incumbent: Rhino Asphalt Solutions
Specialist works are required at a number of gullies (31 number) and manhole (3 number) sites throughout the city
- Published value
- £36k
- Annual run-rate
- £36kpublished value ÷ term, exc. VAT
- Term
- 23 Jun 2026 → 22 Jun 2027 · 1 yr
- Reference
ocds-h6vhtk-06baa7
- Estimated end · in 236 daysFramework recordPanel · 5 suppliers
EPAIS22 - Asset Improvement and Sustainability Framework
EASTERN PROCUREMENT LIMITED · Nationwide (UK), Yorkshire and the Humber, East Midlands, East of England, South East England
Panel: Aspect Group Services Ltd, BELL GROUP LTD, Foster Property Maintenance +2 more
- Published value
- £156mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 23 Jun 2027 · start not published
- Reference
ocds-h6vhtk-0383ee
- Ends · in 236 days
Drill/Training Tower Construction at West Denton Fire Station
Tyne and Wear Fire and Rescue Authority · Police & fire · Nationwide (UK)
Incumbent: Crofton Engineering Limited
Provision and Construction of a Drill/Training Tower at West Denton Fire Station
- Published value
- £178k
- Annual run-rate
- £178kpublished value ÷ term, exc. VAT
- Term
- 24 Jun 2026 → 23 Jun 2027 · 1 yr
- Reference
ocds-h6vhtk-060739
- Ends · in 237 days
PLACE 122 Markham Vale Site Maintenance
Derbyshire County Council · Local authority · East Midlands
Incumbent: T & I Landscapes · Last contest: 19 bids (19 SME)
Markham Vale Site Maintenance
- Published value
- £118k
- Annual run-rate
- —start date not published
- Term
- Ends 24 Jun 2027 · start not published
- Reference
ocds-h6vhtk-033fa4
- Estimated end · in 238 days
SCC - Design and Build of Affordable Dwellings at Lundy Close, Eastwood, Southend-on-Sea
Southend-on-Sea City Council · Local authority · East of England
Incumbent: Auburn Group Limited · Last contest: 7 bids (7 SME) · awarded 19% under the estimate
Southend on Sea City Council are seeking a suitably qualified main contractor to carry out the Design and Build of affordable dwellings in line with proposed 2025 Future Homes Standard. This work will be undertaken in conjunction with the J…
- Published value
- £2.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 25 Jun 2027 · start not published
- Reference
ocds-h6vhtk-04e678
- Ends · in 238 days
CN260791 Ifield School Modular Expansion
Kent County Council · Local authority · South East England
Incumbent: WW MARTIN LTD
Procure the design and build of a double storey modular SEN classroom block (8no. classrooms), together with staff rooms and associated ancillary accommodation, and associated infrastructure, including additional car parking, reprovision of…
- Published value
- £4.4m
- Annual run-rate
- £6.1mpublished value ÷ term, exc. VAT
- Term
- 5 Oct 2026 → 25 Jun 2027 · 9 months
- Reference
ocds-h6vhtk-078e88
- Ends · in 238 days
Bedlington Town Centre Phase 3
ADVANCE NORTHUMBERLAND (COMMERCIAL) LIMITED · Other public body · North East England
Incumbent: Tri Construction Limited · Last contest: awarded 11% under the estimate
The project seeks to construct a new 19,000 sq. ft retail store for B & M and 1800 sq. ft Starbucks Drive thru with external works as the third phase of Bedlington Town Centre Regeneration for Advance Northumberland.
- Published value
- £3.6m
- Annual run-rate
- £4.8mpublished value ÷ term, exc. VAT
- Term
- 29 Sept 2026 → 25 Jun 2027 · 9 months
- Reference
ocds-h6vhtk-065c4e
- Ends · in 238 days
Construction works: Dahlia Avenue, South Normanton
East Midlands Housing Group · Housing · East Midlands
Incumbent: DUKERIES LIVING LIMITED
Construction of 17 dwellings on Dahlia Avenue, South Normanton. The developer will not sell the land without carrying out the works, and the social housing provider (EMH Housing and Regeneration) has significant demand for housing in the ar…
- Published value
- £3.5minc. VAT as published
- Annual run-rate
- £2.8mpublished value ÷ term, inc. VAT
- Term
- 27 Mar 2026 → 25 Jun 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-066b99
- Ends · in 238 daysExtension option
Holyhead Depot Improvements
Transport for Wales Rail Limited (Utility Buyer) · Other public body · Wales (Cymru)
Incumbent: Forte Engineering Ltd
Below threshold tender advertised via Sell2Wales OCID reference ocds-kuma6s-158122.
- Published value
- £579k
- Annual run-rate
- £742kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 25 Jun 2027 · 9 months
- Reference
ocds-h6vhtk-078378
- Ends · in 238 days
Contract for Refurbishment of Public Realm Glass Lift at Copr Bay
City & County of Swansea · Local authority · Wales (Cymru)
Incumbent: RJ Lifts Group Ltd
Undertake complete electrical refurbishment to the glass public realm lift. To include strip out of existing electrical components, supply and fit new controls, encoder, motor, operating panel, indicators, auto dial, re-wiring, etc. Commiss…
- Published value
- £61k
- Annual run-rate
- £28kpublished value ÷ term, exc. VAT
- Term
- 1 May 2025 → 25 Jun 2027 · 2.2 yrs
- Reference
ocds-h6vhtk-050bae
- Estimated end · in 239 daysFramework recordPanel · 3 suppliers
Roofing replacement programme 2024-2027
LiveWest Homes Limited · South West England
Panel: Milestone Contracting Limited, t/a Milestone Partnerships, Novus Property Solutions Ltd, Westcountry Maintenance Services Ltd
Roofing replacement programme for both flat and pitched roofing covering Cornwall, South Devon and Bristol, Bath & West of England
- Published value
- £13mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Jun 2027 · start not published
- Reference
ocds-h6vhtk-0445ab
- Ends · in 241 days
Demolition of Staff Accomodations
North West Anglia NHS Foundation Trust · Central government · East of England
Incumbent: Harte Demolition Ltd
This contract is for the demolition of existing staff accommodation building nr4 at the Hinchingbrooke Hospital site. This work is required as part of the Hinchingbrooke Hospital Redevelopment Project and will need to be performed in accord…
- Published value
- £263k
- Annual run-rate
- £267kpublished value ÷ term, exc. VAT
- Term
- 3 Jul 2026 → 28 Jun 2027 · 1 yr
- Reference
ocds-h6vhtk-05eb64
- Ends · in 243 daysFramework recordPanel · 8 suppliers
Broadland Development Services Homes for the Future Main Contractor Framework
Broadland Development Services Limited · East of England
Panel: ASPEN BUILD (EAST ANGLIA) LIMITED, E.N. Suiter & Sons Limited, Fox Construction Eastern Limited +5 more
- Published value
- £150mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 30 Jun 2027 · start not published
- Reference
ocds-h6vhtk-049339
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,867 contracts and agreements end within 24 months, 4,773 in total · £8.6bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 24 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services5,35479Business services: law, marketing, consulting3,98460Transport services (except waste transport)3,72845Construction work2,86772IT services: consulting, software, internet2,38171Architectural, construction, engineering2,31850Repair and maintenance services2,23780Education and training services1,951
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.