Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1–15
- Estimated end · todayPanel · 2 suppliers
External Cyclical Maintenance
Northern Ireland Housing Executive · Northern Ireland
Panel: PK Murphy, PK Murphy Construction Limited · Last contest: 13 bids (1 SME)
NIHE would like to procure suitable qualified Contractors to carry out external cyclical maintenance to properties throughout the Belfast and South Regions.
- Published value
- £8.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Oct 2026 · start not published
- Reference
ocds-h6vhtk-041052
- Estimated end · todayPanel · 2 suppliers
External Cyclical Maintenance
Northern Ireland Housing Executive · Northern Ireland
Panel: S+D Properrty Maintenance Ltd, S+D Property Maintenance Ltd · Last contest: 13 bids (1 SME)
- Published value
- £7.8m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Oct 2026 · start not published
- Reference
ocds-h6vhtk-041052
- Estimated end · today
External Cyclical Maintenance Works
Northern Ireland Housing Executive · Northern Ireland
Incumbent: MASCOTT CONSTRUCTION EUROPE LTD · Last contest: 13 bids (1 SME)
- Published value
- £6.9m
- Annual run-rate
- —start date not published
- Term
- Estimated end 26 Oct 2026 · start not published
- Reference
ocds-h6vhtk-041052
- Estimated end · today
Colintraive Terminal Building Extension
Caledonian Maritime Assets Ltd (Utility) · Scotland
Incumbent: Alltec Construction Ltd · Last contest: 7 bids (4 SME)
Construction of extension on to rear wall of existing terminal building. Strip back of concrete roof and replacement of roof covering and new extension roof with new roof covering. Internal down takings and new fit out to form new internal …
- Published value
- £371k
- Annual run-rate
- —start date not published
- Term
- Estimated end 26 Oct 2026 · start not published
- Reference
ocds-h6vhtk-05adc8
- Ends · today
TD2228 - Council House Lift Refurbishment (2025)
Derby City Council · Local authority · East Midlands
Incumbent: Concept Elevators (UK) Ltd · Last contest: 2 bids · awarded at the estimate
Derby City Council (the Council) is undertaking this procurement to establish a contract for the refurbishment of one existing passenger lift at the Council House, Derby. The procurement process adopted by the Council is based on the 'Open'…
- Published value
- £110k
- Annual run-rate
- —start date not published
- Term
- Ends 26 Oct 2026 · start not published
- Reference
ocds-h6vhtk-04c9fd
- Estimated end · todayFramework recordPanel · 8 suppliers
Retail Shop Design & Fit-Out Framework
Historic Environment Scotland · Scotland
Panel: Bentleys Shopfitting Ltd, Cubit Design Limited, Effective Visual Marketing Ltd T/A EVM +5 more
- Published value
- £2.3mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 27 Oct 2026 · start not published
- Reference
ocds-h6vhtk-0459c7
- Estimated end · todayPanel · 2 suppliers
Asbestos Removal 2024 - Lot 1 - Residential
Bromford Flagship LiveWest Limited · Housing · Nationwide (UK)
Panel: Broadland Group Limited, Vertex Asbestos Removal Limited · Last contest: 9 bids
Flagship Group would like to appoint suppliers to deliver its entire asbestos removal strategy, this will include works to seal, repair, or remove asbestos containing material identified in asbestos surveys. The current housing stock consi…
- Published value
- £2.2m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 27 Oct 2026 · start not published
- Reference
ocds-h6vhtk-047d99
- Ends · in 5 days
Replacement Cemetery Fencing
Winscombe and Sandford Parish Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: SB Fencing Contractors Ltd · Last contest: 6 bids
replacement fence
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-06bf79
- Estimated end · in 8 days
Sirinham Point - Replacement of Glazed Rainscreen
Metropolitan Housing Trust · Housing · Greater London
Incumbent: PiLON Ltd · Last contest: 2 bids · awarded 57% over the estimate
remove Glazing and frame to plant room at roof level and replace with Blockwork. Design and build with Gateway 2 Submission Required.
- Published value
- £235k
- Annual run-rate
- —start date not published
- Term
- Estimated end 3 Nov 2026 · start not published
- Reference
ocds-h6vhtk-04c204
- Estimated end · in 8 days
Bronllwyn Adult Care Development
Rhondda Cynon Taf CBC · Wales (Cymru)
Incumbent: LANGSTONE CONSTRUCTION GROUP LTD · Last contest: 4 bids (4 SME)
The proposed scheme, Bronllwyn Care Home, comprises of the design & construction of the 14nr bed adult care facility together with all associated external works, drainage works, service connections, including any adoptions required to provi…
- Published value
- £7.8m
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-041d0e
- Estimated end · in 8 days
DH20043 - Painting & Decorating Contract
Derby Homes Ltd · East Midlands
Incumbent: Buxton Decorators · Last contest: 12 bids (7 SME) · awarded 7% under the estimate
Derby Homes contract for Painting & Decorating to new build, void properties, the Derby Homes one room decoration scheme and other associated works
- Published value
- £2.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02d5c7
- Estimated end · in 8 days
Shrub Hill - Isaac Maddox House - Phase 2 Refurbishment Works
Worcestershire County Council · Local authority · West Midlands
Incumbent: Speller Metcalfe Ltd. · Last contest: 2 bids (0 SME)
The refurbishment of Isaac Maddox House, and office building in Shrub Hill, Worcester.As part of the Shrub Hill Industrial Estate development the Council is seeking a Construction contractor to complete the deign and carry out the refurbish…
- Published value
- £191k
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-046f10
- Estimated end · in 9 daysFramework recordPanel · 24 suppliers
PfH Scotland EESSH2 Framework
Procurement for Housing · Scotland
Panel: A.C. Whyte & Co. Ltd., BRB Electrical Limited, British Gas Social Housing Ltd trading as PH Jones +21 more
- Published value
- £300mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 5 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02aa91
- Estimated end · in 9 days
Lift Maintenance Services
Accent Group Ltd · North East England, North West England, Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: ORONA LIMITED · Last contest: 8 bids
Contract Award following an open competition for Lift maintenance services to Accent Housing Ltd providing national coverage to its schemes and homes. Accent Housing Ltd (Accent) are seeking the services of one Contractor to support deliver…
- Published value
- £306k
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02c318
- Estimated end · in 10 days
Contract
the Education Authority · Education · Northern Ireland
Incumbent: Bell Contracts · Last contest: 17 bids (1 SME) · awarded 7% over the estimate
Appointment of Integrated Supply Team for the construction of new 8 class primary school on existing extended site. The project will include full construction works, mechanical and electrical services, external and site development works.
Re-procurement plannedAppointment of Integrated Supply Team for Iveagh Primary School · tender expected
- Published value
- £5.6m
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Nov 2026 · start not published
- Reference
ocds-h6vhtk-047933
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
944 contracts and agreements end within 24 months, 2,436 in total · £5.1bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.
85Health and social work services2,71579Business services: law, marketing, consulting67560Transport services (except waste transport)61650Repair and maintenance services60390Sewage, refuse, cleaning and environmental52245Construction work50072IT services: consulting, software, internet46771Architectural, construction, engineering454
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.