Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1–15
- Estimated end · today
Planned Preventative Maintenance (PPM)
Northern Trains Ltd · Nationwide (UK)
Incumbent: Adler & Allan Ltd · Last contest: 3 bids
This tender has been tendered in two lots, lot 1 tank inspections and lot 2 PPM (Planned Preventative Maintenance) . For lot 1 Tank inspections will be taking place at 7 engineering depots across Northern's estate. Minor repair works to Nor…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 27 Oct 2026 · start not published
- Reference
ocds-h6vhtk-0485a0
- Estimated end · in 2 daysLinked to a framework or DPS
IF029 - Software Systems Engineers Framework
NORTHERN IRELAND WATER LIMITED · Nationwide (UK), Northern Ireland
Incumbent: SCOTTS ELECTRICAL SERVICES LTD · Last contest: 2 bids
Software Systems Engineers Framework. The Contract is split into four (4) lots. These being; • Lots 1-3 - Software System Engineers Service • Lot 4 - Software System Engineers Specialist Support Service. See Specification for further inform…
- Published value
- £5.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-037547
- Estimated end · in 2 daysLinked to a framework or DPS
IF029 - Software Systems Engineers Framework
NORTHERN IRELAND WATER LIMITED · Nationwide (UK), Northern Ireland
Incumbent: Pronto Automation Systems Ltd · Last contest: 2 bids
Software Systems Engineers Framework. The Contract is split into four (4) lots. These being; • Lots 1-3 - Software System Engineers Service • Lot 4 - Software System Engineers Specialist Support Service. See Specification for further inform…
- Published value
- £5.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-037547
- Estimated end · in 2 daysLinked to a framework or DPS
IF029 - Software Systems Engineers Framework
NORTHERN IRELAND WATER LIMITED · Nationwide (UK), Northern Ireland
Incumbent: Global Automation (NI) Ltd · Last contest: 3 bids
Software Systems Engineers Framework. The Contract is split into four (4) lots. These being; • Lots 1-3 - Software System Engineers Service • Lot 4 - Software System Engineers Specialist Support Service. See Specification for further inform…
- Published value
- £5.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-037547
- Estimated end · in 2 daysLinked to a framework or DPS
IF029 - Software Systems Engineers Framework
NORTHERN IRELAND WATER LIMITED · Nationwide (UK), Northern Ireland
Incumbent: TES Group Ltd · Last contest: 7 bids
Software Systems Engineers Framework. The Contract is split into four (4) lots. These being; • Lots 1-3 - Software System Engineers Service • Lot 4 - Software System Engineers Specialist Support Service. See Specification for further inform…
- Published value
- £714kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-037547
- Estimated end · in 2 daysLinked to a framework or DPS
IF029 - Software Systems Engineers Framework
NORTHERN IRELAND WATER LIMITED · Nationwide (UK), Northern Ireland
Incumbent: SCOTTS ELECTRICAL SERVICES LTD · Last contest: 7 bids
Software Systems Engineers Framework. The Contract is split into four (4) lots. These being; • Lots 1-3 - Software System Engineers Service • Lot 4 - Software System Engineers Specialist Support Service. See Specification for further inform…
- Published value
- £714kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-037547
- Estimated end · in 2 daysLinked to a framework or DPS
IF029 - Software Systems Engineers Framework
NORTHERN IRELAND WATER LIMITED · Nationwide (UK), Northern Ireland
Incumbent: Pronto Automation Systems Ltd · Last contest: 7 bids
Software Systems Engineers Framework. The Contract is split into four (4) lots. These being; • Lots 1-3 - Software System Engineers Service • Lot 4 - Software System Engineers Specialist Support Service. See Specification for further inform…
- Published value
- £714kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-037547
- Estimated end · in 2 daysLinked to a framework or DPS
IF029 - Software Systems Engineers Framework
NORTHERN IRELAND WATER LIMITED · Nationwide (UK), Northern Ireland
Incumbent: Global Automation (NI) Ltd · Last contest: 7 bids
Software Systems Engineers Framework. The Contract is split into four (4) lots. These being; • Lots 1-3 - Software System Engineers Service • Lot 4 - Software System Engineers Specialist Support Service. See Specification for further inform…
- Published value
- £714kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-037547
- Estimated end · in 2 daysLinked to a framework or DPS
IF029 - Software Systems Engineers Framework
NORTHERN IRELAND WATER LIMITED · Nationwide (UK), Northern Ireland
Incumbent: Ashdale Engineering Ltd · Last contest: 7 bids
Software Systems Engineers Framework. The Contract is split into four (4) lots. These being; • Lots 1-3 - Software System Engineers Service • Lot 4 - Software System Engineers Specialist Support Service. See Specification for further inform…
- Published value
- £714kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-037547
- Estimated end · in 2 daysLinked to a framework or DPS
IF029 - Software Systems Engineers Framework
NORTHERN IRELAND WATER LIMITED · Nationwide (UK), Northern Ireland
Incumbent: BSG CIVIL ENGINEERING LTD · Last contest: 7 bids
Software Systems Engineers Framework. The Contract is split into four (4) lots. These being; • Lots 1-3 - Software System Engineers Service • Lot 4 - Software System Engineers Specialist Support Service. See Specification for further inform…
- Published value
- £714kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-037547
- Estimated end · in 2 daysLinked to a framework or DPS
IF029 - Software Systems Engineers Framework
NORTHERN IRELAND WATER LIMITED · Nationwide (UK), Northern Ireland
Incumbent: Profitec Solutions Ltd · Last contest: 7 bids
Software Systems Engineers Framework. The Contract is split into four (4) lots. These being; • Lots 1-3 - Software System Engineers Service • Lot 4 - Software System Engineers Specialist Support Service. See Specification for further inform…
- Published value
- £714kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-037547
- Estimated end · in 2 days
The Provision of a Planned Maintenance Service for Alarm Systems and Emergency Lighting
Buckinghamshire Council · Local authority · South East England
Incumbent: Churches Fire Security Ltd · Last contest: 5 bids (3 SME) · awarded 52% under the estimate
Buckinghamshire Council was seeking an experienced supplier to deliver its Planned Maintenance Service for Alarm Systems and Emergency Lighting. This service includes the provision of the following elements: • Statutory Compliance • Planned…
- Published value
- £439k
- Annual run-rate
- —start date not published
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-03bf36
- Estimated end · in 3 days
Emergency Lighting Compliance checks
Northamptonshire Partnership Homes · East Midlands
Incumbent: Fieldway Supplies Ltd · Last contest: 4 bids (4 SME)
- Published value
- £600k
- Annual run-rate
- —start date not published
- Term
- Estimated end 29 Oct 2026 · start not published
- Reference
ocds-h6vhtk-055f48
- Estimated end · in 3 days
JDAC Linked to 741847 Maintenance of Theatre Tools and Mobile Equipment
Regional Business Services Organisation Procurement and Logistics Service · Northern Ireland
Incumbent: Boston Scientific Ltd
- Published value
- £1.9m
- Annual run-rate
- —start date not published
- Term
- Estimated end 30 Oct 2026 · start not published
- Reference
ocds-h6vhtk-055979
- Ends · in 5 days
Vehicle Collision Repairs
Cheshire Constabulary on behalf of the Police and Crime Commissioner for Cheshire · Police & fire · North West England
Incumbent: KC Autos Accident Repair Centres Ltd · Last contest: 3 bids (3 SME) · awarded at the estimate
This is a Contract Award Notice The Provision of Vehicle Collision Repair Services is required from Automotive Bodyshops who are certified to Vehicle Damage Repair Kitemark BS10125. The requirement will be to provide Vehicle Collision Repai…
- Published value
- £2.5m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-03f02e
When contracts end · Repair and maintenance services i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
1,052 contracts and agreements end within 24 months, 1,739 in total · £2.1bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.
85Health and social work services2,71579Business services: law, marketing, consulting67560Transport services (except waste transport)61650Repair and maintenance services60390Sewage, refuse, cleaning and environmental52245Construction work50072IT services: consulting, software, internet46771Architectural, construction, engineering454
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.