Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 24 months
Showing 2,206–2,220
- Estimated end · in 401 days
Yiewsley Housing Schemes - Falling Lane (Lot 1 Award)
London Borough of Hillingdon · Local authority · Nationwide (UK), Greater London
Incumbent: Bugler Developments Ltd. · Last contest: 6 bids
Award. Lot 1 (Falling Lane) involves the demolition of the existing library, and construction of 50 flats over 5 storeys, car and cycle parking and communal gardens. In addition, the works include the creation of a public family landscaped …
- Published value
- £20m
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Dec 2027 · start not published
- Reference
ocds-h6vhtk-044ccb
- Ends · in 403 days
Hooks Close
Greensquareaccord · Other public body · South West England
Incumbent: Semilong Services Ltd · Last contest: awarded 28% under the estimate
This procurement activity is to locate a supplier to complete decommissioning and replacement of a sewage treatment plant with a fully operational Plant connecting to existing drainage and refurbishment of the Soakaway Mound. The new site w…
- Published value
- £120k
- Annual run-rate
- £120kpublished value ÷ term, exc. VAT
- Term
- 8 Dec 2026 → 7 Dec 2027 · 1 yr
- Reference
ocds-h6vhtk-06cade
- Estimated end · in 405 days
M Block Roofing (Design and Build) - Open Procedure
University of Bolton · Education · North West England
Incumbent: Gables UK Limited · Last contest: 2 bids (2 SME)
The University of Bolton is seeking a high quality Provider of Construction Services for re-roofing of M Block building on campus. The purpose of this tender is to appoint one supplier for the provision of Design and Construction Services t…
- Published value
- £491k
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Dec 2027 · start not published
- Reference
ocds-h6vhtk-03724b
- Ends · in 405 days
Stansted Airport Fibre Cable Installation
Home Office · Central government
Incumbent: Stansted Airport Ltd
Installation of Fibre Cables at Stansted Airport
- Published value
- £32k
- Annual run-rate
- £11kpublished value ÷ term, exc. VAT
- Term
- 10 Dec 2024 → 9 Dec 2027 · 3 yrs
- Reference
ocds-h6vhtk-065bfd
- Estimated end · in 406 daysFramework record
Provision of a Storage, Maintenance and Deployment Framework for the National Barrier Asset (NBA)
Mayor's Office for Policing and Crime · Nationwide (UK)
Incumbent: Hardstaff Barriers (A Division of Hill and Smith Infrastructure Limited)
- Published value
- £35mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Dec 2027 · start not published
- Reference
ocds-h6vhtk-03d5ef
- Estimated end · in 406 daysCall-off
NOE CPC Minor Works, Trades and Associated Services Dynamic Purchasing Systems (DPS)
Leeds and York Partnership NHS Foundation Trust · NHS & health · Nationwide (UK)
Incumbent: Tilbury Douglas Construction Limited · Last contest: 90 bids (25 SME)
- Published value
- £3.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Dec 2027 · start not published
- Reference
ocds-h6vhtk-02e29c
- Estimated end · in 406 daysCall-off
NOE CPC Minor Works, Trades and Associated Services Dynamic Purchasing Systems (DPS)
Leeds and York Partnership NHS Foundation Trust · NHS & health · Nationwide (UK)
Incumbent: Beaufort Construction (S-in-A) Limited · Last contest: 90 bids (25 SME)
- Published value
- £3.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Dec 2027 · start not published
- Reference
ocds-h6vhtk-02e29c
- Estimated end · in 406 daysCall-off
NOE CPC Minor Works, Trades and Associated Services Dynamic Purchasing Systems (DPS)
Leeds and York Partnership NHS Foundation Trust · NHS & health · Nationwide (UK)
Incumbent: Sleaford Electrical and Refrigeration Company Ltd · Last contest: 90 bids (25 SME)
- Published value
- £877kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Dec 2027 · start not published
- Reference
ocds-h6vhtk-02e29c
- Estimated end · in 406 daysCall-off
NOE CPC Minor Works, Trades and Associated Services Dynamic Purchasing Systems (DPS)
Leeds and York Partnership NHS Foundation Trust · NHS & health · Nationwide (UK)
Incumbent: Safeflow Ventilation Ltd · Last contest: 90 bids (25 SME)
- Published value
- £722kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Dec 2027 · start not published
- Reference
ocds-h6vhtk-02e29c
- Estimated end · in 406 daysCall-off
NOE CPC Minor Works, Trades and Associated Services Dynamic Purchasing Systems (DPS)
Leeds and York Partnership NHS Foundation Trust · NHS & health · Nationwide (UK)
Incumbent: J LISTER ELECTRICAL LIMITED · Last contest: 90 bids (25 SME)
- Published value
- £717kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Dec 2027 · start not published
- Reference
ocds-h6vhtk-02e29c
- Estimated end · in 406 daysCall-off
NOE CPC Minor Works, Trades and Associated Services Dynamic Purchasing Systems (DPS)
Leeds and York Partnership NHS Foundation Trust · NHS & health · Nationwide (UK)
Incumbent: Guardian Electrical Compliance Ltd · Last contest: 90 bids (25 SME)
- Published value
- £240kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Dec 2027 · start not published
- Reference
ocds-h6vhtk-02e29c
- Estimated end · in 406 daysCall-off
NOE CPC Minor Works, Trades and Associated Services Dynamic Purchasing Systems (DPS)
Leeds and York Partnership NHS Foundation Trust · NHS & health · Nationwide (UK)
Incumbent: Walter West Builders Ltd · Last contest: 90 bids (25 SME)
- Published value
- £204kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Dec 2027 · start not published
- Reference
ocds-h6vhtk-02e29c
- Estimated end · in 406 daysCall-off
NOE CPC Minor Works, Trades and Associated Services Dynamic Purchasing Systems (DPS)
Leeds and York Partnership NHS Foundation Trust · NHS & health · Nationwide (UK)
Incumbent: Floway Mechanical Solutions Limited · Last contest: 90 bids (25 SME)
- Published value
- £82kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Dec 2027 · start not published
- Reference
ocds-h6vhtk-02e29c
- Estimated end · in 406 daysCall-off
NOE CPC Minor Works, Trades and Associated Services Dynamic Purchasing Systems (DPS)
Leeds and York Partnership NHS Foundation Trust · NHS & health · Nationwide (UK)
Incumbent: Whitehouse Construction Co. Ltd · Last contest: 90 bids (25 SME)
- Published value
- £62kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Dec 2027 · start not published
- Reference
ocds-h6vhtk-02e29c
- Estimated end · in 406 daysCall-off
NOE CPC Minor Works, Trades and Associated Services Dynamic Purchasing Systems (DPS)
Leeds and York Partnership NHS Foundation Trust · NHS & health · Nationwide (UK)
Incumbent: Water Hygiene Centre Limited · Last contest: 90 bids (25 SME)
- Published value
- £47kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Dec 2027 · start not published
- Reference
ocds-h6vhtk-02e29c
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,848 contracts and agreements end within 24 months, 4,753 in total · £8.5bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 24 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services5,34179Business services: law, marketing, consulting3,95560Transport services (except waste transport)3,69945Construction work2,84872IT services: consulting, software, internet2,36071Architectural, construction, engineering2,29750Repair and maintenance services2,23880Education and training services1,934
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.