Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 24 months
Showing 2,386–2,400
- Estimated end · in 483 days
Broadacres Retrofit & Decarbonisation Contract 2025
Broadacres Housing Association · Housing · Yorkshire and the Humber
Incumbent: RPS · Last contest: 17 bids (12 SME) · awarded 22% under the estimate
Broadacres is seeking to award a Retrofit and Decarbonisation Contract (“Contract”) covering a range of works to a single contractor. Contract duration will be approximately 3 years (36 months). The works required include, but are not limit…
- Published value
- £6.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 24 Feb 2028 · start not published
- Reference
ocds-h6vhtk-04c87a
- Estimated end · in 484 days
PKC12686 Domestic kitchen replacements
Perth & Kinross Council · Local authority · Scotland
Incumbent: QTS Contracts north Ltd · Last contest: 7 bids (7 SME) · awarded 50% under the estimate
Perth and Kinross Council were seeking to appoint a suitably qualified and experienced contractor to carry out the domestic kitchen replacements.
- Published value
- £5.4m
- Annual run-rate
- —start date not published
- Term
- Estimated end 25 Feb 2028 · start not published
- Reference
ocds-h6vhtk-04de8a
- Estimated end · in 485 daysFramework record
Term contract - carriageway resurfacing (HDG/2023/603*)
Stoke on Trent City Council · Local authority · West Midlands
Incumbent: Aggregate Industries Ltd
Stoke-on-Trent City Council seeks to establish a Term contract for Carriageway Re-surfacing. The work to be executed under this contract will be spread over a number of sites within the City, each site providing a separate job. There is no …
- Published value
- £31mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 26 Feb 2028 · start not published
- Reference
ocds-h6vhtk-040eb5
- Estimated end · in 486 days
Supply and Application of Bitumen for Surface Dressing
Dorset Council · Local authority · South West England
Incumbent: Bituchem Building Products Ltd · Last contest: 2 bids
Dorset Highways have an on-going budgeted requirement for the supply and application of bitumen to support its own in-house surface dressing (highway maintenance) works. This contract will provide a fundamentally important aspect of our ess…
- Published value
- £9.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 27 Feb 2028 · start not published
- Reference
ocds-h6vhtk-041a30
- Estimated end · in 486 days
Lot 5 - South Region 2
Northern Ireland Housing Executive · Northern Ireland
Incumbent: PIPERHILL CONSTRUCTION LTD · Last contest: 5 bids (1 SME)
The objective of this procurement is to appoint suitably qualified and competent Contractors to provide retrofit external wall insulation, windows, doors, roof replacement and associate works to NIHE properties.
- Published value
- £4.8m
- Annual run-rate
- —start date not published
- Term
- Estimated end 27 Feb 2028 · start not published
- Reference
ocds-h6vhtk-04e4a3
- Ends · in 487 days
COV - Stoke Park School - Main Works
Coventry City Council · Local authority · West Midlands
Incumbent: Borras Construction Ltd · Last contest: awarded 19% under the estimate
COV - Stoke Park Secondary School - Main Works Works to construct 8 classroom block and refurbishment of existing youth centre building to convert to drama studio, including associated external play area and landscaping.
- Published value
- £3.9m
- Annual run-rate
- £2.0mpublished value ÷ term, exc. VAT
- Term
- 7 Apr 2026 → 28 Feb 2028 · 1.9 yrs
- Reference
ocds-h6vhtk-05960c
- Ends · in 487 daysLinked to a framework or DPSExtension option · up to 28 Feb 2030Panel · 3 suppliers
Framework for Scaffolding: Lot 1 Highway Services
Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: Ingleford Scaffolding Limited, KAEFER LIMITED, TIS (NGA) Ltd
- Published value
- £2.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Mar 2026 → 28 Feb 2028 · 2 yrs · up to 28 Feb 2030 with extensions
- Reference
ocds-h6vhtk-05e763
- Ends · in 487 daysLinked to a framework or DPSExtension option · up to 28 Feb 2030Panel · 3 suppliers
Framework for Scaffolding: Lot 2 Construction Services
Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: Ingleford Scaffolding Limited, KAEFER LIMITED, TIS (NGA) Ltd
- Published value
- £2.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Mar 2026 → 28 Feb 2028 · 2 yrs · up to 28 Feb 2030 with extensions
- Reference
ocds-h6vhtk-05e763
- Ends · in 487 daysExtension option · up to 28 Feb 2031
Drainage services
HOMES IN SOMERSET LIMITED · Other public body · South West England
Incumbent: AQUABLAST DRAIN SERVICES LIMITED · Last contest: awarded at the estimate
Drainage repairs and services
- Published value
- £200k
- Annual run-rate
- £100kpublished value ÷ term, exc. VAT
- Term
- 1 Mar 2026 → 28 Feb 2028 · 2 yrs · up to 28 Feb 2031 with extensions
- Reference
ocds-h6vhtk-05d13f
- Ends · in 487 days
Play site safety surfacing
Braintree District Council · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: DCM Projects Ltd
Play site safety surfacing works
- Published value
- £30k
- Annual run-rate
- £15kpublished value ÷ term, exc. VAT
- Term
- 1 Mar 2026 → 28 Feb 2028 · 2 yrs
- Reference
ocds-h6vhtk-060f1a
- Ends · in 488 daysFramework recordPanel · 22 suppliers
Refurbishment and Modernisation Framework Agreement
LHC for the Scottish Procurement Alliance (SPA) · Scotland
Panel: BELL GROUP LTD, CCG (Scotland) Ltd, CHAP Group (Aberdeen) Ltd +19 more
- Published value
- £100mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Mar 2024 → 29 Feb 2028 · 4 yrs
- Reference
ocds-h6vhtk-03a449
- Ends · in 488 days
Repository Development (RD) Southern Trench Cap Interim Membrane Replacement (STIM) Project
Nuclear Waste Services Limited · North West England
Incumbent: John Graham Construction Ltd · Last contest: 9 bids (0 SME) · awarded 26% over the estimate
Nuclear Waste Services has awarded a contract for the Southern Trench Cap Interim Membrane (STIM) Replacement project, which forms part of the Repository Development portfolio of work at the LLW Repository facility near Drigg Village in Cum…
- Published value
- £67m
- Annual run-rate
- —start date not published
- Term
- Ends 29 Feb 2028 · start not published
- Reference
ocds-h6vhtk-03979d
- Ends · in 488 daysExtension option · up to 28 Feb 2030Buyer plans to re-tender 2 May 2029
NYC Provision of Replacement Windows and Doors
The North Yorkshire Council · Local authority · Yorkshire and the Humber
Incumbent: Kingfisher UPVC Windows & Doors Ltd · Last contest: awarded 4% over the estimate
The Authority requires a Contractor to carry out full window and door replacement/s to its social housing property base, (Composite External Door installations / Full Window UPVC Replacements, supply and fit/and or supply only) Including do…
- Published value
- £8.2m
- Annual run-rate
- £4.1mpublished value ÷ term, exc. VAT
- Term
- 1 Mar 2026 → 29 Feb 2028 · 2 yrs · up to 28 Feb 2030 with extensions
- Reference
ocds-h6vhtk-0588f4
- Ends · in 488 daysExtension option · up to 28 Feb 2029
AT1377 Principal Contractor for New Builds at Sylam & Waulud
Luton Borough Council · Local authority · East of England
Incumbent: Parrott Construction Ltd · Last contest: awarded at the estimate
Luton Council are looking to appoint a principal contractor to deliver two residential affordable schemes, one for 5 homes and another for 6 homes.
- Published value
- £4.8m
- Annual run-rate
- £2.5mpublished value ÷ term, exc. VAT
- Term
- 31 Mar 2026 → 29 Feb 2028 · 1.9 yrs · up to 28 Feb 2029 with extensions
- Reference
ocds-h6vhtk-0566f6
- Ends · in 488 days
Composite Fire Door Replacement
The North Yorkshire Council · Local authority · Yorkshire and the Humber
Incumbent: Kingfisher UPVC Windows & Doors Ltd
Supply and install fully compliant FD30 Fire doors and screens.
- Published value
- £200k
- Annual run-rate
- £109kpublished value ÷ term, exc. VAT
- Term
- 1 May 2026 → 29 Feb 2028 · 1.8 yrs
- Reference
ocds-h6vhtk-06f503
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,848 contracts and agreements end within 24 months, 4,753 in total · £8.5bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 24 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services5,34179Business services: law, marketing, consulting3,95560Transport services (except waste transport)3,69945Construction work2,84872IT services: consulting, software, internet2,36071Architectural, construction, engineering2,29750Repair and maintenance services2,23880Education and training services1,934
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.