Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 24 months
Showing 2,521–2,535
- Estimated end · in 522 days
Lot 3 Building maintenance service works (Area South West) (Council Area Mid-Ulster)
the Education Authority · Education · Northern Ireland
Incumbent: Woodvale Construction Company · Last contest: 13 bids (1 SME)
The Measured Term Service Short Contract for the Provision of Building: Response, Planned Maintenance and Minor Works Lots 1, 2 and 3. Works / Services include the following Core Skill Disciplines: Building Works, Asbestos Services and a nu…
- Published value
- £3.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 3 Apr 2028 · start not published
- Reference
ocds-h6vhtk-04b4df
- Estimated end · in 522 days
Lot 1 Building maintenance service works (Area North) (Council Area Causeway Coast and Glens)
the Education Authority · Education · Northern Ireland
Incumbent: DOWN DEVELOPMENTS LTD · Last contest: 13 bids (1 SME)
The Measured Term Service Short Contract for the Provision of Building: Response, Planned Maintenance and Minor Works Lots 1, 2 and 3. Works / Services include the following Core Skill Disciplines: Building Works, Asbestos Services and a nu…
- Published value
- £3.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 3 Apr 2028 · start not published
- Reference
ocds-h6vhtk-04b4df
- Estimated end · in 523 daysFramework recordPanel · 100 suppliers
EN:Procure - Framework for Installation, Servicing, Maintenance and Repair Works (2023 - 2027)
EN Procure Ltd · North West England, Yorkshire and the Humber, East Midlands
Panel: A Connolly Limited, ABSOLUTE SOLAR LIMITED, ACS Roofing Services Ltd +97 more
- Published value
- £3.2bnpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 4 Apr 2028 · start not published
- Reference
ocds-h6vhtk-03e003
- Ends · in 525 days
Ruan Minor Glebe - JCT D&B - CHL 154
COASTLINE DESIGN AND BUILD LIMITED · Other public body · South West England
Incumbent: EBC PARTNERSHIPS LIMITED
Ruan Minor Glebe - JCT D&B - CHL 154 -Delivery of 30 affordable homes for Coastline Housing -Ruan Minor Glebe is being acquired as a package scheme under the Capital Funding Guide. -Coastline Design & Build, Coastline Design and Build have …
- Published value
- £6.6minc. VAT as published
- Annual run-rate
- £4.2mpublished value ÷ term, inc. VAT
- Term
- 16 Sept 2026 → 6 Apr 2028 · 1.6 yrs
- Reference
ocds-h6vhtk-06e285
- Estimated end · in 527 daysFramework recordPanel · 7 suppliers
TC1111 - Highways Maintenance Framework
Manchester City Council · Local authority · North West England
Panel: Bethell Construction Ltd, Chevron Traffic Management Ltd, J. HOPKINS (CONTRACTORS) LIMITED +4 more
- Published value
- £32mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 8 Apr 2028 · start not published
- Reference
ocds-h6vhtk-03d706
- Estimated end · in 529 daysFramework recordPanel · 21 suppliers
Rochdale Council - Framework Agreement for Highway Works
Rochdale Borough Council · Local authority · North West England
Panel: A & T Surfacing Limited, Aggregate Industries UK Ltd, Argyle North West Construction Limited +18 more
- Published value
- £17mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 10 Apr 2028 · start not published
- Reference
ocds-h6vhtk-040c01
- Ends · in 531 days
High Voltage Pre-Planned Maintenance, Technical Support and Call Out Service
UNIVERSITY OF SALFORD(THE) · Education · North West England
Incumbent: POWER SUPPLY PROJECTS LIMITED · Last contest: 7 bids · awarded 4% under the estimate
HV maintenance
- Published value
- £208k
- Annual run-rate
- —start date not published
- Term
- Ends 12 Apr 2028 · start not published
- Reference
ocds-h6vhtk-043c6d
- Estimated end · in 533 days
Contract
Woven Housing Association Ltd · Housing · Northern Ireland
Incumbent: BRAIDWATER LTD · Last contest: 1 bid (1 SME) · awarded 5% over the estimate
The Contracting Authority is seeking to appoint a developer to provide land, design and build proposals for the development of social housing. The Contracting Authority seeks land, design and build opportunities in the following area: Strab…
- Published value
- £15m
- Annual run-rate
- —start date not published
- Term
- Estimated end 14 Apr 2028 · start not published
- Reference
ocds-h6vhtk-04177c
- Estimated end · in 533 daysFramework recordPanel · 8 suppliers
Mechanical Services Framework
Dundee City Council · Local authority · Scotland
Panel: A Tech Heating Limited, Alternative Heat Ltd., B-DACS +5 more
- Published value
- £11mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 14 Apr 2028 · start not published
- Reference
ocds-h6vhtk-041ab1
- Estimated end · in 533 daysPanel · 2 suppliers
Supply of permanent nutrient neutrality mitigation in Cumbria via upgrades to septic tanks
Westmorland and Furness Council · Local authority · North West England
Panel: Burrow Environmental, Our Rivers (Cumbria) Ltd · Last contest: 2 bids
Westmorland and Furness Council, together with Cumberland Council and the Lake District National Park, established the Nutrient Neutrality North West partnership to drive a Cumbria-wide approach to addressing nutrient neutrality in the four…
- Published value
- £11m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 14 Apr 2028 · start not published
- Reference
ocds-h6vhtk-04e54b
- Estimated end · in 533 days
Stock Investment Programme (SIP) External Doors and Windows Replacement
South Yorkshire Housing Association · Housing · Nationwide (UK)
Incumbent: Burngreave Building Company · Last contest: 7 bids (2 SME)
Supply and installation of doors and windows
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 14 Apr 2028 · start not published
- Reference
ocds-h6vhtk-04cdb0
- Estimated end · in 533 days
SIP Gas Central Heating
South Yorkshire Housing Association · Housing · Nationwide (UK)
Incumbent: Ashley and McDonough · Last contest: 4 bids (3 SME)
The project comprises the planned works programme for the following to be undertaken in occupied properties: Individual replacement of existing domestic type boilers, controls or radiators in General Needs properties 2.0 Full dwelling repla…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 14 Apr 2028 · start not published
- Reference
ocds-h6vhtk-04cdb1
- Estimated end · in 535 daysFramework recordPanel · 7 suppliers
Planned and Responsive Works Framework - Central, NE, NE and SW
Places for People Group Limited · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: Argent FM Limited, BELL GROUP LTD, DASCO Construction Limited +4 more
- Published value
- £40mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 16 Apr 2028 · start not published
- Reference
ocds-h6vhtk-03a3ef
- Ends · in 535 daysExtension option · up to 16 Apr 2031Buyer plans to re-tender 1 Nov 2030Panel · 2 suppliers
Lot 1 - Northern Area
Ards and North Down Borough Council · Local authority · Northern Ireland
Panel: GARDEN ESCAPES IRELAND LTD, Garden Escapes
Tenders are sought by Ards and North Down Borough Council for the provision of new and replacement play areas, and play area maintenance within the Borough area.
- Published value
- £2.9m
- Annual run-rate
- —panel, not one supplier
- Term
- 17 Apr 2026 → 16 Apr 2028 · 2 yrs · up to 16 Apr 2031 with extensions
- Reference
ocds-h6vhtk-05e0d8
- Ends · in 535 daysExtension option · up to 16 Apr 2031Buyer plans to re-tender 1 Nov 2030
Lot 2 - Southern Area
Ards and North Down Borough Council · Local authority · Northern Ireland
Incumbent: Play and Leisure Services Ltd
Tenders are sought by Ards and North Down Borough Council for the provision of new and replacement play areas, and play area maintenance within the Borough area.
- Published value
- £2.3m
- Annual run-rate
- £1.1mpublished value ÷ term, exc. VAT
- Term
- 17 Apr 2026 → 16 Apr 2028 · 2 yrs · up to 16 Apr 2031 with extensions
- Reference
ocds-h6vhtk-05e0d8
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,848 contracts and agreements end within 24 months, 4,753 in total · £8.5bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 24 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services5,34179Business services: law, marketing, consulting3,95560Transport services (except waste transport)3,69945Construction work2,84872IT services: consulting, software, internet2,36071Architectural, construction, engineering2,29750Repair and maintenance services2,23880Education and training services1,934
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.