Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 24 months

Showing 2,716–2,730

  1. Estimated end · in 657 daysCall-off

    Tree Maintenance - Reactive - Highways

    London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland

    Incumbent: CSG Usher's Ltd · Last contest: 9 bids (0 SME)

    • Construction work
    Published value
    £3kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 15 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-029345
  2. Estimated end · in 657 daysFramework recordPanel · 2 suppliers

    ng homes Framework Agreement for Stonework Repairs: 2024-2028

    ng homes · Scotland

    Panel: C-B-C Stone Restoration and Conservation Limited, Cairn Building Solutions Ltd

    • Stonework
    Published value
    Not publishedlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 15 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-040d3f
  3. Ends · in 658 daysExtension option · up to 16 Oct 2031Panel · 2 suppliers

    Anchorage A-Frames Replacement Scheme

    Humber Bridge Board · Other public body · Nationwide (UK), Yorkshire and the Humber

    Panel: SPENCER BRIDGE ENGINEERING LIMITED, Spencer

    The Humber Bridge Board conducted this procurement to appoint a suitable Contractor to undertake the design and construction of the replacement for the existing A-frames rocker bearings on the Hessle and Barton Anchorages of the Humber Brid…

    Published value
    £6.0m
    Annual run-rate
    —panel, not one supplier
    Term
    16 Oct 2026 → 16 Aug 2028 · 1.8 yrs · up to 16 Oct 2031 with extensions
    Reference
    ocds-h6vhtk-06a93c
  4. Estimated end · in 659 daysCall-off

    Nature Conservation

    London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland

    Incumbent: The Conservation Volunteers · Last contest: 9 bids (0 SME)

    • Construction work
    Published value
    £8kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-029345
  5. Ends · in 659 days

    Internal Planned Maintenance Electrical Works

    Darlington Borough Council · Local authority · North East England

    Incumbent: K.M. ELECTRICAL SERVICES LIMITED

    Supply all labour plant and materials to complete the electrical rewires/partial rewires and alterations.

    Published value
    £1.6m
    Annual run-rate
    £530kpublished value ÷ term, exc. VAT
    Term
    18 Aug 2025 → 17 Aug 2028 · 3 yrs
    Reference
    ocds-h6vhtk-05dc50
  6. Estimated end · in 660 daysCall-off

    Hard Landscaping - Homes for Haringey

    London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland

    Incumbent: Turney Landscapes Limited · Last contest: 9 bids (0 SME)

    • Construction work
    Published value
    £4kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 18 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-029345
  7. Ends · in 660 daysExtension option · up to 18 Aug 2029

    Minor Works for neighbourhoods

    Welwyn Hatfield Borough Council · Local authority

    Incumbent: SANPER CONSTRUCTION LTD · Last contest: awarded at the estimate

    Welwyn Hatfield Borough Council (hereinafter referred to as the Council) requires a contractor to undertake miscellaneous minor works for Neighbourhood Improvement Bids within the administrative boundaries covered by Welwyn Hatfield Borough…

    Published value
    £160k
    Annual run-rate
    £55kpublished value ÷ term, exc. VAT
    Term
    29 Sept 2025 → 18 Aug 2028 · 2.9 yrs · up to 18 Aug 2029 with extensions
    Reference
    ocds-h6vhtk-054f27
  8. Estimated end · in 663 days

    Central London, East London, South London, South East London and Kent

    Look Ahead Care & Support Ltd · East of England, Greater London, South East England

    Incumbent: Chigwell Construction · Last contest: 4 bids (4 SME)

    The delivery of responsive repairs and void refurbishment works to properties owned and managed by Look Ahead Care and Support.

    • Refurbishment work
    Published value
    £1.2m
    Annual run-rate
    —start date not published
    Term
    Estimated end 21 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-029164
  9. Estimated end · in 663 days

    Central London, East London, South London, South East London and Kent.

    Look Ahead Care & Support Ltd · East of England, Greater London, South East England

    Incumbent: Architectural Decorators Ltd · Last contest: 5 bids (5 SME)

    The delivery of planned and cyclical works for stock owned and managed by Look Ahead Care and Support

    • Refurbishment work
    Published value
    £1.1m
    Annual run-rate
    —start date not published
    Term
    Estimated end 21 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-029165
  10. Estimated end · in 663 daysDynamic purchasing system recordPanel · 20 suppliers

    DPS - Property Maintenance Minor Works 2024-2028

    Westmorland and Furness Council · Local authority · North West England

    Panel: B& K Builders Ltd, BELL GROUP LTD, Bay Building Services ltd +17 more

    • Construction work
    Published value
    Not publishedlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-045a04
  11. Ends · in 663 days

    PCSA Agreement

    Melton Borough Council · Local authority · East Midlands

    Incumbent: ROBERTSON CONSTRUCTION GROUP LIMITED · Last contest: awarded 3% over the estimate

    Published value
    £168k
    Annual run-rate
    £73kpublished value ÷ term, exc. VAT
    Term
    5 May 2026 → 21 Aug 2028 · 2.3 yrs
    Reference
    ocds-h6vhtk-052b1f
  12. Estimated end · in 664 days

    Term Service Contract for the Measure, Supply and Installation of Kitchens

    East Riding of Yorkshire Council · Local authority · Yorkshire and the Humber

    Incumbent: J.C. Services and Son Limited · Last contest: 5 bids (5 SME) · awarded at the estimate

    The Measure, Supply and Installation of between 300-350 kitchens per year to various types of occupied Council Housing stock located within the geographical boundaries of the East Riding of Yorkshire.

    • Installation of fitted kitchens
    Published value
    £9.6m
    Annual run-rate
    —start date not published
    Term
    Estimated end 22 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-033542
  13. Estimated end · in 664 daysFramework record

    https://wmca.bravosolution.co.uk

    West Midlands Combined Authority · Local authority · West Midlands

    Incumbent: QTS Group Ltd

    • Overhead line construction

    Re-procurement plannedProvision of 24/7 Emergency Overhead Line Equipment (OLE) Response and Repair Services for Midland Metro Limited (MML)

    Published value
    £6.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 22 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-040c16
  14. Estimated end · in 664 daysCall-off

    Tree Maintenance - Reactive - Other Sites

    London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland

    Incumbent: CSG Usher's Ltd · Last contest: 9 bids (0 SME)

    • Construction work
    Published value
    £245value of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 22 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-029345
  15. Estimated end · in 665 daysCall-off

    Gas Servicing and Repairs

    ForHousing Ltd · Nationwide (UK)

    Incumbent: Liberty Gas Group Limited · Last contest: 41 bids (28 SME)

    • Heating works
    Published value
    £60mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 23 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-03ce41

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,836 contracts and agreements end within 24 months, 4,734 in total · £8.5bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months927
  2. 3–6 months580
  3. 6–12 months597
  4. 12–24 months732

Top sectors, next 24 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.