Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 24 months
Showing 2,716–2,730
- Estimated end · in 657 daysCall-off
Tree Maintenance - Reactive - Highways
London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland
Incumbent: CSG Usher's Ltd · Last contest: 9 bids (0 SME)
- Published value
- £3kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 15 Aug 2028 · start not published
- Reference
ocds-h6vhtk-029345
- Estimated end · in 657 daysFramework recordPanel · 2 suppliers
ng homes Framework Agreement for Stonework Repairs: 2024-2028
ng homes · Scotland
Panel: C-B-C Stone Restoration and Conservation Limited, Cairn Building Solutions Ltd
- Published value
- Not publishedlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 15 Aug 2028 · start not published
- Reference
ocds-h6vhtk-040d3f
- Ends · in 658 daysExtension option · up to 16 Oct 2031Panel · 2 suppliers
Anchorage A-Frames Replacement Scheme
Humber Bridge Board · Other public body · Nationwide (UK), Yorkshire and the Humber
Panel: SPENCER BRIDGE ENGINEERING LIMITED, Spencer
The Humber Bridge Board conducted this procurement to appoint a suitable Contractor to undertake the design and construction of the replacement for the existing A-frames rocker bearings on the Hessle and Barton Anchorages of the Humber Brid…
- Published value
- £6.0m
- Annual run-rate
- —panel, not one supplier
- Term
- 16 Oct 2026 → 16 Aug 2028 · 1.8 yrs · up to 16 Oct 2031 with extensions
- Reference
ocds-h6vhtk-06a93c
- Estimated end · in 659 daysCall-off
Nature Conservation
London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland
Incumbent: The Conservation Volunteers · Last contest: 9 bids (0 SME)
- Published value
- £8kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 17 Aug 2028 · start not published
- Reference
ocds-h6vhtk-029345
- Ends · in 659 days
Internal Planned Maintenance Electrical Works
Darlington Borough Council · Local authority · North East England
Incumbent: K.M. ELECTRICAL SERVICES LIMITED
Supply all labour plant and materials to complete the electrical rewires/partial rewires and alterations.
- Published value
- £1.6m
- Annual run-rate
- £530kpublished value ÷ term, exc. VAT
- Term
- 18 Aug 2025 → 17 Aug 2028 · 3 yrs
- Reference
ocds-h6vhtk-05dc50
- Estimated end · in 660 daysCall-off
Hard Landscaping - Homes for Haringey
London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland
Incumbent: Turney Landscapes Limited · Last contest: 9 bids (0 SME)
- Published value
- £4kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 18 Aug 2028 · start not published
- Reference
ocds-h6vhtk-029345
- Ends · in 660 daysExtension option · up to 18 Aug 2029
Minor Works for neighbourhoods
Welwyn Hatfield Borough Council · Local authority
Incumbent: SANPER CONSTRUCTION LTD · Last contest: awarded at the estimate
Welwyn Hatfield Borough Council (hereinafter referred to as the Council) requires a contractor to undertake miscellaneous minor works for Neighbourhood Improvement Bids within the administrative boundaries covered by Welwyn Hatfield Borough…
- Published value
- £160k
- Annual run-rate
- £55kpublished value ÷ term, exc. VAT
- Term
- 29 Sept 2025 → 18 Aug 2028 · 2.9 yrs · up to 18 Aug 2029 with extensions
- Reference
ocds-h6vhtk-054f27
- Estimated end · in 663 days
Central London, East London, South London, South East London and Kent
Look Ahead Care & Support Ltd · East of England, Greater London, South East England
Incumbent: Chigwell Construction · Last contest: 4 bids (4 SME)
The delivery of responsive repairs and void refurbishment works to properties owned and managed by Look Ahead Care and Support.
- Published value
- £1.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 21 Aug 2028 · start not published
- Reference
ocds-h6vhtk-029164
- Estimated end · in 663 days
Central London, East London, South London, South East London and Kent.
Look Ahead Care & Support Ltd · East of England, Greater London, South East England
Incumbent: Architectural Decorators Ltd · Last contest: 5 bids (5 SME)
The delivery of planned and cyclical works for stock owned and managed by Look Ahead Care and Support
- Published value
- £1.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 21 Aug 2028 · start not published
- Reference
ocds-h6vhtk-029165
- Estimated end · in 663 daysDynamic purchasing system recordPanel · 20 suppliers
DPS - Property Maintenance Minor Works 2024-2028
Westmorland and Furness Council · Local authority · North West England
Panel: B& K Builders Ltd, BELL GROUP LTD, Bay Building Services ltd +17 more
- Published value
- Not publishedlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Aug 2028 · start not published
- Reference
ocds-h6vhtk-045a04
- Ends · in 663 days
PCSA Agreement
Melton Borough Council · Local authority · East Midlands
Incumbent: ROBERTSON CONSTRUCTION GROUP LIMITED · Last contest: awarded 3% over the estimate
- Published value
- £168k
- Annual run-rate
- £73kpublished value ÷ term, exc. VAT
- Term
- 5 May 2026 → 21 Aug 2028 · 2.3 yrs
- Reference
ocds-h6vhtk-052b1f
- Estimated end · in 664 days
Term Service Contract for the Measure, Supply and Installation of Kitchens
East Riding of Yorkshire Council · Local authority · Yorkshire and the Humber
Incumbent: J.C. Services and Son Limited · Last contest: 5 bids (5 SME) · awarded at the estimate
The Measure, Supply and Installation of between 300-350 kitchens per year to various types of occupied Council Housing stock located within the geographical boundaries of the East Riding of Yorkshire.
- Published value
- £9.6m
- Annual run-rate
- —start date not published
- Term
- Estimated end 22 Aug 2028 · start not published
- Reference
ocds-h6vhtk-033542
- Estimated end · in 664 daysFramework record
https://wmca.bravosolution.co.uk
West Midlands Combined Authority · Local authority · West Midlands
Incumbent: QTS Group Ltd
Re-procurement plannedProvision of 24/7 Emergency Overhead Line Equipment (OLE) Response and Repair Services for Midland Metro Limited (MML)
- Published value
- £6.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 22 Aug 2028 · start not published
- Reference
ocds-h6vhtk-040c16
- Estimated end · in 664 daysCall-off
Tree Maintenance - Reactive - Other Sites
London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland
Incumbent: CSG Usher's Ltd · Last contest: 9 bids (0 SME)
- Published value
- £245value of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 22 Aug 2028 · start not published
- Reference
ocds-h6vhtk-029345
- Estimated end · in 665 daysCall-off
Gas Servicing and Repairs
ForHousing Ltd · Nationwide (UK)
Incumbent: Liberty Gas Group Limited · Last contest: 41 bids (28 SME)
- Published value
- £60mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 23 Aug 2028 · start not published
- Reference
ocds-h6vhtk-03ce41
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,836 contracts and agreements end within 24 months, 4,734 in total · £8.5bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 24 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services5,33779Business services: law, marketing, consulting3,94960Transport services (except waste transport)3,69945Construction work2,83672IT services: consulting, software, internet2,35871Architectural, construction, engineering2,29650Repair and maintenance services2,23380Education and training services1,934
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.