Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 24 months

Showing 2,731–2,745

  1. Estimated end · in 665 daysCall-off

    Gas Servicing and Repairs

    ForHousing Ltd · Nationwide (UK)

    Incumbent: Liberty Gas Group Limited · Last contest: 41 bids (28 SME)

    The contract includes the planned and reactive servicing, maintenance and testing of heating systems to circa 23,000 dwellings owned and/or managed by ForHousing in the North West of England which are predominately fueled by natural gas. Th…

    • Heating works
    Published value
    £60mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 23 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-03ce41
  2. Estimated end · in 665 days

    SSW1 Mid Ulster

    DfI Transport and Road Asset Management (TRAM) · Northern Ireland

    Incumbent: FP McCann Ltd · Last contest: 7 bids (3 SME)

    • Works for complete or part construction and civil engineering work
    Published value
    £29m
    Annual run-rate
    —start date not published
    Term
    Estimated end 23 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-03929d
  3. Estimated end · in 665 days

    SSE2 Lisburn and Castlereagh

    DfI Transport and Road Asset Management (TRAM) · Northern Ireland

    Incumbent: I.C.B. Emulsions Ltd t/a Colas NI · Last contest: 6 bids (3 SME)

    The Term Contract for Small Scale and Responsive Works - the works to be undertaken under this Contract may include, but not be limited to, the following Principal Work Activities which are provided by way of example: A. Delivery of tempora…

    • Works for complete or part construction and civil engineering work
    Published value
    £22m
    Annual run-rate
    —start date not published
    Term
    Estimated end 23 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-03929d
  4. Estimated end · in 665 days

    SSW1 Mid Ulster

    Department for Infrastructure · Central government · Northern Ireland

    Incumbent: FP McCann Ltd · Last contest: 7 bids (3 SME)

    • Works for complete or part construction and civil engineering work
    Published value
    £22m
    Annual run-rate
    —start date not published
    Term
    Estimated end 23 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-03929d
  5. Estimated end · in 665 days

    SSE2 Lisburn and Castlereagh

    Department for Infrastructure · Central government · Northern Ireland

    Incumbent: I.C.B. Emulsions Ltd t/a Colas NI · Last contest: 6 bids (3 SME)

    • Works for complete or part construction and civil engineering work
    Published value
    £16m
    Annual run-rate
    —start date not published
    Term
    Estimated end 23 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-03929d
  6. Estimated end · in 665 daysCall-off

    Tree Maintenance - Reactive - Homes for Haringey

    London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland

    Incumbent: M Parkin Tree Specialists Ltd · Last contest: 9 bids (0 SME)

    • Construction work
    Published value
    £350value of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 23 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-029345
  7. Estimated end · in 666 daysCall-off

    Tree Maintenance - Planned - Highways

    London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland

    Incumbent: CSG Usher's Ltd · Last contest: 9 bids (0 SME)

    • Construction work
    Published value
    £1kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 24 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-029345
  8. Ends · in 666 days

    Various Properties - Legionella Team Project East - Lot 1

    Hampshire County Council · Local authority · South East England

    Incumbent: BTU (INSTALLATION & MAINTENANCE) LIMITED

    The scope of services included in this specification cover planned and reactive maintenance for the purposes of Legionella prevention at properties maintained by Hampshire County Council (as described in the following sections and all assoc…

    Published value
    £375k
    Annual run-rate
    £201kpublished value ÷ term, exc. VAT
    Term
    12 Oct 2026 → 24 Aug 2028 · 1.8 yrs
    Reference
    ocds-h6vhtk-0789fd
  9. Estimated end · in 667 daysFramework record

    SCAPE Civil Engineering Framework - EWNI

    Scape Procure Limited (trading as SCAPE) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Balfour Beatty Civil Engineering Limited

    • Construction work
    Published value
    £3.3bnpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 25 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-0300b9
  10. Estimated end · in 668 days

    The Brindley Theatre Enhancement Works

    Halton Borough Council · Local authority · Nationwide (UK), North West England, South East England

    Incumbent: Krol Corlett Construction Limited · Last contest: 2 bids (2 SME)

    The works comprise the extension, alteration and refurbishment of the existing Brindley Theatre to include a new café, library and education extension, including external works and drainage.

    • Construction work
    Published value
    £6.3m
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-040a71
  11. Ends · in 669 days

    Beckenham Housing Scheme - Thames Water

    London Borough of Bromley · Local authority · Greater London

    Incumbent: Thames Water Utilities Ltd

    To oversee the build over and sewer diversion application and installation requirements for the Beckenham Housing Scheme

    Published value
    £45k
    Annual run-rate
    £22kpublished value ÷ term, exc. VAT
    Term
    18 Aug 2026 → 27 Aug 2028 · 2 yrs
    Reference
    ocds-h6vhtk-06e655
  12. Estimated end · in 670 daysFramework record

    Supply & Install of Doors & Windows (Single Properties)

    B3Living · East of England

    Incumbent: Sovereign Group Limited

    • Installation of doors and windows and related components
    Published value
    £500kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 28 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-0459ba
  13. Estimated end · in 670 daysCall-off

    Tree Maintenance - Reactive - Homes for Haringey

    London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland

    Incumbent: Turney Landscapes Limited · Last contest: 9 bids (0 SME)

    • Construction work
    Published value
    £2kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 28 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-029345
  14. Ends · in 670 days

    Various Properties - Legionella Team Project West - Lot 1

    Hampshire County Council · Local authority · South East England

    Incumbent: SIMER ENVIRONMENTAL SERVICES LTD

    The scope of services included in this specification cover planned and reactive maintenance for the purposes of Legionella prevention at properties maintained by Hampshire County Council (as described in the following sections and all assoc…

    Published value
    £375k
    Annual run-rate
    £199kpublished value ÷ term, exc. VAT
    Term
    12 Oct 2026 → 28 Aug 2028 · 1.9 yrs
    Reference
    ocds-h6vhtk-0789fe
  15. Estimated end · in 671 daysCall-off

    Tree Maintenance - Reactive - Highways

    London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland

    Incumbent: Turney Landscapes Limited · Last contest: 9 bids (0 SME)

    • Construction work
    Published value
    £4kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 29 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-029345

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,836 contracts and agreements end within 24 months, 4,734 in total · £8.5bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months927
  2. 3–6 months580
  3. 6–12 months597
  4. 12–24 months732

Top sectors, next 24 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.