Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 24 months
Showing 2,821–2,835
- Estimated end · in 719 daysCall-off
Tree Maintenance - Reactive - Homes for Haringey
London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland
Incumbent: Turney Landscapes Limited · Last contest: 9 bids (0 SME)
- Published value
- £1kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Oct 2028 · start not published
- Reference
ocds-h6vhtk-029345
- Ends · in 720 daysExtension option · up to 17 Oct 2030
NUNCON - Slabs to Tarmac & Related Works
Nuneaton and Bedworth Borough Council · Local authority
Incumbent: IMPART LINKS LIMITED · Last contest: awarded at the estimate
This contract is to establish rates for updating slabbed and areas of tarmac/ hardstanding in disrepair, to tarmac. Additionally includes related works to gates, fences etc. and ad hoc soft landscaping works.
- Published value
- £3.5m
- Annual run-rate
- £1.2mpublished value ÷ term, exc. VAT
- Term
- 18 Oct 2025 → 17 Oct 2028 · 3 yrs · up to 17 Oct 2030 with extensions
- Reference
ocds-h6vhtk-050929
- Ends · in 721 daysExtension option · up to 18 Oct 2030
Provision of Minor Adaptations Service
Barnsley Metropolitan Borough Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: 24-7 Locks Ltd · Last contest: awarded at the estimate
This contract is for the appointment of a supplier for the provision of minor adaptations services. Minor adaptations are low-level, non-structural modifications to a person’s home environment, designed to improve accessibility, reduce risk…
- Published value
- £920k
- Annual run-rate
- £460kpublished value ÷ term, exc. VAT
- Term
- 19 Oct 2026 → 18 Oct 2028 · 2 yrs · up to 18 Oct 2030 with extensions
- Reference
ocds-h6vhtk-06bea1
- Ends · in 721 days
Warm homes
Cornwall Council · Local authority · Nationwide (UK), South West England
Incumbent: BELL GROUP LTD
The purpose of this Term Service Contract is to deliver a comprehensive program of energy efficiency improvements under the The Warm Homes Local Grant initiative. The contract is designed to address the thermal performance, energy consumpti…
- Published value
- £200k
- Annual run-rate
- £69kpublished value ÷ term, exc. VAT
- Term
- 19 Nov 2025 → 18 Oct 2028 · 2.9 yrs
- Reference
ocds-h6vhtk-056b7c
- Ends · in 722 daysExtension option · up to 19 Oct 2030
NUNCON – Concrete Repairs
Nuneaton and Bedworth Borough Council · Local authority
Incumbent: INTEGRAL CONCRETE SOLUTIONS LIMITED
Concrete repairs, replacement walkway coatings, drainage adaptations, render repairs, handrail replacements, wall repairs, and decoration across various NBBC properties.
- Published value
- £250k
- Annual run-rate
- £83kpublished value ÷ term, exc. VAT
- Term
- 20 Oct 2025 → 19 Oct 2028 · 3 yrs · up to 19 Oct 2030 with extensions
- Reference
ocds-h6vhtk-05446c
- Ends · in 722 daysExtension option · up to 19 Oct 2030
Bus shelter repairs and maintenance
Erewash Borough Council · Local authority · East Midlands
Incumbent: Shelter Maintenance Limited · Last contest: awarded at the estimate
This Contract is for the provision of bus shelter cleaning, maintenance and repair. Cleaning of all locations is required on a quarterly basis. Following each clean, a maintenance report is required to be submitted to the Council identifyin…
- Published value
- £150k
- Annual run-rate
- £50kpublished value ÷ term, exc. VAT
- Term
- 20 Oct 2025 → 19 Oct 2028 · 3 yrs · up to 19 Oct 2030 with extensions
- Reference
ocds-h6vhtk-056889
- Estimated end · in 723 daysFramework recordPanel · 2 suppliers
SCAPE Civil Engineering Framework - Scotland
Scape Procure Scotland Ltd · Scotland
Panel: Balfour Beatty Civil Engineering Limited, Balfour Beatty Civil Engineering Ltd, an agent of Balfour Beatty Group Ltd
- Published value
- £750mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 20 Oct 2028 · start not published
- Reference
ocds-h6vhtk-0300bc
- Estimated end · in 726 daysFramework recordPanel · 12 suppliers
NHS Building for Wales 2 Frameworks - Supply Chain Partner
Velindre University NHS Trust as the Hosting Body of NHS Wales Shared Services Partnership - SES · NHS & health · Wales (Cymru)
Panel: Andrew Scott Limited, BAM CONSTRUCTION LIMITED, CURRIE and BROWN UK LIMITED +9 more
- Published value
- £5.9mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 23 Oct 2028 · start not published
- Reference
ocds-h6vhtk-037d34
- Estimated end · in 726 daysCall-offPanel · 4 suppliers
NHS Building for Wales 2 Frameworks Lot 2: Works Value
Velindre University NHS Trust as the Hosting Body of NHS Wales Shared Services Partnership - SES · NHS & health · Wales (Cymru)
Panel: Gleeds, LEE WAKEMANS LIMITED, Mace Consult Limited +1 more · Last contest: 6 bids (1 SME)
- Published value
- £5.3mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 23 Oct 2028 · start not published
- Reference
ocds-h6vhtk-037d34
- Estimated end · in 726 daysCall-offPanel · 4 suppliers
NHS Building for Wales 2 Frameworks Lot 1: Works Value (ex VAT)
Velindre University NHS Trust as the Hosting Body of NHS Wales Shared Services Partnership - SES · NHS & health · Wales (Cymru)
Panel: Gleeds, LEE WAKEMANS LIMITED, Mace Consult Limited +1 more · Last contest: 6 bids (1 SME)
- Published value
- £3.6mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 23 Oct 2028 · start not published
- Reference
ocds-h6vhtk-037d34
- Estimated end · in 727 daysCall-off
Tree Maintenance - Reactive - Parks
London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland
Incumbent: CSG Usher's Ltd · Last contest: 9 bids (0 SME)
- Published value
- £6kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 24 Oct 2028 · start not published
- Reference
ocds-h6vhtk-029345
- Estimated end · in 727 daysCall-off
Tree Maintenance - Reactive - Homes for Haringey
London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland
Incumbent: CSG Usher's Ltd · Last contest: 9 bids (0 SME)
- Published value
- £1kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 24 Oct 2028 · start not published
- Reference
ocds-h6vhtk-029345
- Estimated end · in 727 daysCall-off
Tree Maintenance - Reactive - Other Sites
London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland
Incumbent: CSG Usher's Ltd · Last contest: 9 bids (0 SME)
- Published value
- £525value of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 24 Oct 2028 · start not published
- Reference
ocds-h6vhtk-029345
- Ends · in 727 daysExtension option · up to 24 Oct 2031
Warm Homes Programme Delivery 2025 - 2031
Phoenix Community Housing · Housing · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: United Living (South) Ltd
Warm Homes Programme Delivery 2025 - 2031. Delivery of Decarbonisation Construction Work
- Published value
- £8.6minc. VAT as published
- Annual run-rate
- £2.9mpublished value ÷ term, inc. VAT
- Term
- 12 Nov 2025 → 24 Oct 2028 · 2.9 yrs · up to 24 Oct 2031 with extensions
- Reference
ocds-h6vhtk-06c2a1
- Estimated end · in 731 daysCall-off
GMCA 374 - FC036 Salford CC (Lot 1) - 2025/26 Solar PV Programme
Greater Manchester Combined Authority · Local authority · Nationwide (UK)
Incumbent: NPS Energy Limited · Last contest: 16 bids (12 SME)
Local authorities and public sector bodies continue to be tasked with making savings and reducing their carbon emissions, as well as being committed to sustainability and energy management. Solar photovoltaic technology would assist Salford…
- Published value
- £846kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 28 Oct 2028 · start not published
- Reference
ocds-h6vhtk-02d469
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,836 contracts and agreements end within 24 months, 4,734 in total · £8.5bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 24 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services5,33779Business services: law, marketing, consulting3,94960Transport services (except waste transport)3,69945Construction work2,83672IT services: consulting, software, internet2,35871Architectural, construction, engineering2,29650Repair and maintenance services2,23380Education and training services1,934
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.