Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 24 months

Showing 1–10

38,135 contracts

  1. Estimated end · todayPanel · 2 suppliers

    External Cyclical Maintenance

    Northern Ireland Housing Executive · Northern Ireland

    Panel: PK Murphy, PK Murphy Construction Limited · Last contest: 13 bids (1 SME)

    NIHE would like to procure suitable qualified Contractors to carry out external cyclical maintenance to properties throughout the Belfast and South Regions.

    • Construction work
    Published value
    £8.0m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-041052
  2. Estimated end · todayPanel · 2 suppliers

    External Cyclical Maintenance

    Northern Ireland Housing Executive · Northern Ireland

    Panel: S+D Properrty Maintenance Ltd, S+D Property Maintenance Ltd · Last contest: 13 bids (1 SME)

    • Construction work
    Published value
    £7.8m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-041052
  3. Estimated end · today

    External Cyclical Maintenance Works

    Northern Ireland Housing Executive · Northern Ireland

    Incumbent: MASCOTT CONSTRUCTION EUROPE LTD · Last contest: 13 bids (1 SME)

    • Construction work
    Published value
    £6.9m
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-041052
  4. Estimated end · today

    Colintraive Terminal Building Extension

    Caledonian Maritime Assets Ltd (Utility) · Scotland

    Incumbent: Alltec Construction Ltd · Last contest: 7 bids (4 SME)

    Construction of extension on to rear wall of existing terminal building. Strip back of concrete roof and replacement of roof covering and new extension roof with new roof covering. Internal down takings and new fit out to form new internal …

    • Construction work
    Published value
    £371k
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-05adc8
  5. Ends · today

    2372 Waterford Ln & Fiskerton Rd, Cherry Willingham Surface Water Drainage Improvements

    Lincolnshire County Council · Local authority · East Midlands

    Incumbent: Daniel Charles Construction

    Works at Cherry Willingham, Lincoln. New surface water drainage system to rear of 65/67 Waterford Lane along with a new connection to the existing drainage infrastructure on Waterford Lane. Installation of new pre-cast box culverts and ditc…

    Published value
    £48minc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    20 Jul 2026 → 26 Oct 2026 · 3 months
    Reference
    ocds-h6vhtk-06e473
  6. Ends · today

    Meadow View Childrens Home Construction

    Tameside Metropolitan Borough Council · Local authority · North West England

    Incumbent: John Southworth Builders Limited

    Construction of a new childrens home to replace Boyds Walk. Design phase of this work scheme has been completed so this project is construction only.

    Published value
    £2.7minc. VAT as published
    Annual run-rate
    £4.6mpublished value ÷ term, inc. VAT
    Term
    23 Mar 2026 → 26 Oct 2026 · 7 months
    Reference
    ocds-h6vhtk-06894c
  7. Ends · todayExtension option · up to 30 Sept 2030

    PAN3399 - Proposal to Install and Operate an Observation Wheel

    Leicester City Council · Local authority · East Midlands

    Incumbent: The Giant Wheel Co Ltd · Last contest: awarded at the estimate

    To install and operate an observation wheel at Jubilee Square, Leicester LE1 4LD, as part of the City’s winter events programmes.

    Published value
    £500k
    Annual run-rate
    £500kpublished value ÷ term, exc. VAT
    Term
    27 Oct 2025 → 26 Oct 2026 · 1 yr · up to 30 Sept 2030 with extensions
    Reference
    ocds-h6vhtk-056b10
  8. Ends · today

    Communal Lift Refurbishment Programme

    London Borough of Hillingdon · Local authority · Greater London

    Incumbent: Omega Citylifts Services Limited · Last contest: awarded 6% under the estimate

    The London Borough of Hillingdon wishes to appoint an experienced contractor for a Communal passenger Lift Refurbishment Programme, compromising of the refurbishment of 4no Passenger Lifts located within: James Court, Wallis House, Rylstone…

    Published value
    £468k
    Annual run-rate
    —term under 6 months
    Term
    22 Jun 2026 → 26 Oct 2026 · 4 months
    Reference
    ocds-h6vhtk-05dd42
  9. Ends · today

    Meadowfield Community Centre

    Rochdale Borough Council · Local authority · North West England

    Incumbent: H. BELL & SONS (ROCHDALE) LIMITED

    Rochdale Council are seeking a suitable contractor to carry out the refurbishment works on Meadowfield Community Centre. The building has been vacant for a number of years and requires refurbishment to allow for it to be used.

    Published value
    £290k
    Annual run-rate
    —term under 6 months
    Term
    3 Aug 2026 → 26 Oct 2026 · 3 months
    Reference
    ocds-h6vhtk-06d6c7
  10. Ends · today

    Fire Compliance Building Work

    Cell & Gene Therapy Catapult · Other public body

    Incumbent: ALERON FIRE PROTECTION LIMITED

    The works relate to fire compliance within CGTC MIC Braintree Building 2, which must be completed before the building can be brought into operational use. The scope of works is required to ensure compliance with statutory fire safety requir…

    Published value
    £264k
    Annual run-rate
    —term under 6 months
    Term
    20 Jul 2026 → 26 Oct 2026 · 3 months
    Reference
    ocds-h6vhtk-06cb6c

When contracts end
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

38,135 contracts and agreements end within 24 months, 60,620 in total · £71bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months5,748
  2. 3–6 months8,032
  3. 6–12 months10,126
  4. 12–24 months14,229

Top sectors, next 24 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown; 18,096 of 38,135 contracts ending in this window carry a sector classification.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.