Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1–10
- Estimated end · todayPanel · 2 suppliers
External Cyclical Maintenance
Northern Ireland Housing Executive · Northern Ireland
Panel: PK Murphy, PK Murphy Construction Limited · Last contest: 13 bids (1 SME)
NIHE would like to procure suitable qualified Contractors to carry out external cyclical maintenance to properties throughout the Belfast and South Regions.
- Published value
- £8.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Oct 2026 · start not published
- Reference
ocds-h6vhtk-041052
- Estimated end · todayPanel · 2 suppliers
External Cyclical Maintenance
Northern Ireland Housing Executive · Northern Ireland
Panel: S+D Properrty Maintenance Ltd, S+D Property Maintenance Ltd · Last contest: 13 bids (1 SME)
- Published value
- £7.8m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Oct 2026 · start not published
- Reference
ocds-h6vhtk-041052
- Estimated end · today
External Cyclical Maintenance Works
Northern Ireland Housing Executive · Northern Ireland
Incumbent: MASCOTT CONSTRUCTION EUROPE LTD · Last contest: 13 bids (1 SME)
- Published value
- £6.9m
- Annual run-rate
- —start date not published
- Term
- Estimated end 26 Oct 2026 · start not published
- Reference
ocds-h6vhtk-041052
- Estimated end · today
Colintraive Terminal Building Extension
Caledonian Maritime Assets Ltd (Utility) · Scotland
Incumbent: Alltec Construction Ltd · Last contest: 7 bids (4 SME)
Construction of extension on to rear wall of existing terminal building. Strip back of concrete roof and replacement of roof covering and new extension roof with new roof covering. Internal down takings and new fit out to form new internal …
- Published value
- £371k
- Annual run-rate
- —start date not published
- Term
- Estimated end 26 Oct 2026 · start not published
- Reference
ocds-h6vhtk-05adc8
- Ends · today
2372 Waterford Ln & Fiskerton Rd, Cherry Willingham Surface Water Drainage Improvements
Lincolnshire County Council · Local authority · East Midlands
Incumbent: Daniel Charles Construction
Works at Cherry Willingham, Lincoln. New surface water drainage system to rear of 65/67 Waterford Lane along with a new connection to the existing drainage infrastructure on Waterford Lane. Installation of new pre-cast box culverts and ditc…
- Published value
- £48minc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 20 Jul 2026 → 26 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06e473
- Ends · today
Meadow View Childrens Home Construction
Tameside Metropolitan Borough Council · Local authority · North West England
Incumbent: John Southworth Builders Limited
Construction of a new childrens home to replace Boyds Walk. Design phase of this work scheme has been completed so this project is construction only.
- Published value
- £2.7minc. VAT as published
- Annual run-rate
- £4.6mpublished value ÷ term, inc. VAT
- Term
- 23 Mar 2026 → 26 Oct 2026 · 7 months
- Reference
ocds-h6vhtk-06894c
- Ends · todayExtension option · up to 30 Sept 2030
PAN3399 - Proposal to Install and Operate an Observation Wheel
Leicester City Council · Local authority · East Midlands
Incumbent: The Giant Wheel Co Ltd · Last contest: awarded at the estimate
To install and operate an observation wheel at Jubilee Square, Leicester LE1 4LD, as part of the City’s winter events programmes.
- Published value
- £500k
- Annual run-rate
- £500kpublished value ÷ term, exc. VAT
- Term
- 27 Oct 2025 → 26 Oct 2026 · 1 yr · up to 30 Sept 2030 with extensions
- Reference
ocds-h6vhtk-056b10
- Ends · today
Communal Lift Refurbishment Programme
London Borough of Hillingdon · Local authority · Greater London
Incumbent: Omega Citylifts Services Limited · Last contest: awarded 6% under the estimate
The London Borough of Hillingdon wishes to appoint an experienced contractor for a Communal passenger Lift Refurbishment Programme, compromising of the refurbishment of 4no Passenger Lifts located within: James Court, Wallis House, Rylstone…
- Published value
- £468k
- Annual run-rate
- —term under 6 months
- Term
- 22 Jun 2026 → 26 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-05dd42
- Ends · today
Meadowfield Community Centre
Rochdale Borough Council · Local authority · North West England
Incumbent: H. BELL & SONS (ROCHDALE) LIMITED
Rochdale Council are seeking a suitable contractor to carry out the refurbishment works on Meadowfield Community Centre. The building has been vacant for a number of years and requires refurbishment to allow for it to be used.
- Published value
- £290k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 26 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06d6c7
- Ends · today
Fire Compliance Building Work
Cell & Gene Therapy Catapult · Other public body
Incumbent: ALERON FIRE PROTECTION LIMITED
The works relate to fire compliance within CGTC MIC Braintree Building 2, which must be completed before the building can be brought into operational use. The scope of works is required to ensure compliance with statutory fire safety requir…
- Published value
- £264k
- Annual run-rate
- —term under 6 months
- Term
- 20 Jul 2026 → 26 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06cb6c
When contracts end i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
38,135 contracts and agreements end within 24 months, 60,620 in total · £43bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown; 9,788 of 23,906 contracts ending in this window carry a sector classification.
85Health and social work services2,71579Business services: law, marketing, consulting67560Transport services (except waste transport)61650Repair and maintenance services60390Sewage, refuse, cleaning and environmental52245Construction work50072IT services: consulting, software, internet46771Architectural, construction, engineering454
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.