Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 24 months

Showing 1–10

  1. Estimated end · todayPanel · 2 suppliers

    External Cyclical Maintenance

    Northern Ireland Housing Executive · Northern Ireland

    Panel: PK Murphy, PK Murphy Construction Limited · Last contest: 13 bids (1 SME)

    NIHE would like to procure suitable qualified Contractors to carry out external cyclical maintenance to properties throughout the Belfast and South Regions.

    • Construction work
    Published value
    £8.0m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-041052
  2. Estimated end · todayPanel · 2 suppliers

    External Cyclical Maintenance

    Northern Ireland Housing Executive · Northern Ireland

    Panel: S+D Properrty Maintenance Ltd, S+D Property Maintenance Ltd · Last contest: 13 bids (1 SME)

    • Construction work
    Published value
    £7.8m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-041052
  3. Estimated end · today

    External Cyclical Maintenance Works

    Northern Ireland Housing Executive · Northern Ireland

    Incumbent: MASCOTT CONSTRUCTION EUROPE LTD · Last contest: 13 bids (1 SME)

    • Construction work
    Published value
    £6.9m
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-041052
  4. Estimated end · today

    Colintraive Terminal Building Extension

    Caledonian Maritime Assets Ltd (Utility) · Scotland

    Incumbent: Alltec Construction Ltd · Last contest: 7 bids (4 SME)

    Construction of extension on to rear wall of existing terminal building. Strip back of concrete roof and replacement of roof covering and new extension roof with new roof covering. Internal down takings and new fit out to form new internal …

    • Construction work
    Published value
    £371k
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-05adc8
  5. Ends · today

    TD2228 - Council House Lift Refurbishment (2025)

    Derby City Council · Local authority · East Midlands

    Incumbent: Concept Elevators (UK) Ltd · Last contest: 2 bids · awarded at the estimate

    Derby City Council (the Council) is undertaking this procurement to establish a contract for the refurbishment of one existing passenger lift at the Council House, Derby. The procurement process adopted by the Council is based on the 'Open'…

    • Lift installation work
    Published value
    £110k
    Annual run-rate
    —start date not published
    Term
    Ends 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-04c9fd
  6. Estimated end · todayFramework recordPanel · 8 suppliers

    Retail Shop Design & Fit-Out Framework

    Historic Environment Scotland · Scotland

    Panel: Bentleys Shopfitting Ltd, Cubit Design Limited, Effective Visual Marketing Ltd T/A EVM +5 more

    • Building completion work
    Published value
    £2.3mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 27 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-0459c7
  7. Estimated end · todayPanel · 2 suppliers

    Asbestos Removal 2024 - Lot 1 - Residential

    Bromford Flagship LiveWest Limited · Housing · Nationwide (UK)

    Panel: Broadland Group Limited, Vertex Asbestos Removal Limited · Last contest: 9 bids

    Flagship Group would like to appoint suppliers to deliver its entire asbestos removal strategy, this will include works to seal, repair, or remove asbestos containing material identified in asbestos surveys. ​The current housing stock consi…

    • Asbestos-removal work
    Published value
    £2.2m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 27 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-047d99
  8. Ends · in 5 days

    Replacement Cemetery Fencing

    Winscombe and Sandford Parish Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: SB Fencing Contractors Ltd · Last contest: 6 bids

    replacement fence

    • Erection of fencing
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 31 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-06bf79
  9. Estimated end · in 8 days

    Sirinham Point - Replacement of Glazed Rainscreen

    Metropolitan Housing Trust · Housing · Greater London

    Incumbent: PiLON Ltd · Last contest: 2 bids · awarded 57% over the estimate

    remove Glazing and frame to plant room at roof level and replace with Blockwork. Design and build with Gateway 2 Submission Required.

    • Engineering works and construction works
    Published value
    £235k
    Annual run-rate
    —start date not published
    Term
    Estimated end 3 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-04c204
  10. Estimated end · in 8 days

    Bronllwyn Adult Care Development

    Rhondda Cynon Taf CBC · Wales (Cymru)

    Incumbent: LANGSTONE CONSTRUCTION GROUP LTD · Last contest: 4 bids (4 SME)

    The proposed scheme, Bronllwyn Care Home, comprises of the design & construction of the 14nr bed adult care facility together with all associated external works, drainage works, service connections, including any adoptions required to provi…

    • Construction work
    Published value
    £7.8m
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-041d0e

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

944 contracts and agreements end within 24 months, 2,436 in total · £6.4bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months115
  2. 3–6 months149
  3. 6–12 months236
  4. 12–24 months444

Top sectors, next 24 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.