Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 6 months
Showing 1,036–1,050
- Ends · in 111 days
PR342024 Refurbishment works to King William Street Bridge
Exeter City Council · Local authority · South West England
Incumbent: Taziker Industrial · Last contest: awarded 1% under the estimate
Exeter City Council seeks to appoint a contractor to undertake essential refurbishment works to King William Street Bridge, a steel truss pedestrian bridge connecting Sidwell Street and the John Lewis Car Park across a two-lane, one-way car…
- Published value
- £139k
- Annual run-rate
- £139kpublished value ÷ term, exc. VAT
- Term
- 18 Feb 2026 → 17 Feb 2027 · 1 yr
- Reference
ocds-h6vhtk-05ce0f
- Ends · in 111 days
Construction work
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: Pentaco Construction Ltd
1102 - Increased works associated with the Coordination Centre scheme during the construction period associated with client change requests and infrastructure requirements.
- Published value
- £30k
- Annual run-rate
- £30kpublished value ÷ term, exc. VAT
- Term
- 18 Feb 2026 → 17 Feb 2027 · 1 yr
- Reference
ocds-h6vhtk-06569c
- Ends · in 112 days
Brighton Marina to River Adur Coastal Scheme
Brighton and Hove City Council · Local authority · South East England
Incumbent: Van Oord UK Ltd.
The Council is sharing this Invitation to Tender to obtain professional, properly defined and priced propositions for the construction of coastal protection works along Brighton and Hove coastline. The works require the removal of existing …
- Published value
- £16minc. VAT as published
- Annual run-rate
- £11mpublished value ÷ term, inc. VAT
- Term
- 26 Aug 2025 → 18 Feb 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-050c6e
- Ends · in 112 days
Brighton Marina to River Adur Coastal Scheme – Phase 2
Brighton and Hove City Council · Local authority · South East England
Incumbent: Van Oord UK Ltd.
- Published value
- £14m
- Annual run-rate
- £9.5mpublished value ÷ term, exc. VAT
- Term
- 16 Sept 2025 → 18 Feb 2027 · 1.4 yrs
- Reference
ocds-h6vhtk-050c6e
- Ends · in 113 days
Window Renewal at Stephen Sanders Court
London Borough of Wandsworth · Local authority
Incumbent: HILTON ABBEY LTD
Replacement of existing windows including extract fans to kitchens and bathrooms at Stephen Sanders Court, Salcott Road, SW11 6DQ.
- Published value
- £520k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 19 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-077b3a
- Ends · in 113 days
Purbrook Park School - Windows and Door Replacement
Hampshire County Council · Local authority · South East England
Incumbent: Joedan Manufacturing (UK) Ltd
Replacement of single glazed timber and metal windows and external doors with aluminium.
- Published value
- £396k
- Annual run-rate
- —term under 6 months
- Term
- 23 Nov 2026 → 19 Feb 2027 · 3 months
- Reference
ocds-h6vhtk-0789cf
- Ends · in 113 days
England Coastal Paths IOW2
Isle of Wight NHS Trust · Local authority · South East England
Incumbent: M.C.M. CONSTRUCTION LIMITED
the provision of works to the England coastal path section IOW2, Wootton Bridge to Culver. The King Charles III England Coast Path (ECP) is a nationwide initiative to provide a 2,700-mile National Trail and is being funded through Natural E…
- Published value
- £313k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 19 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-065ddb
- Ends · in 113 days
57 Chase Vale Refurb
Lichfield District Council · Local authority · West Midlands
Incumbent: Tyrer Building Contractors Ltd
Reconfiguration to create a more accessible bungalow. The bungalow will have a level access shower, accessible kitchen and door widenings throughout.
- Published value
- £87k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 19 Feb 2027 · 4 months
- Reference
ocds-h6vhtk-078e9e
- Estimated end · in 114 days
East Region (Moray and Aberdeenshire)
Forestry and Land Scotland · Scotland
Incumbent: CR Contractors Tain Limited · Last contest: 2 bids (2 SME)
- Published value
- £3.0mlist or panel total repeated on every provider; not this contract's value
- Annual run-rate
- —list or panel total, not a run-rate
- Term
- Estimated end 20 Feb 2027 · start not published
- Reference
ocds-h6vhtk-0316a7
- Estimated end · in 114 days
East Region (Moray and Aberdeenshire)
Forestry and Land Scotland · Scotland
Incumbent: CR Contracting North LTD · Last contest: 2 bids (2 SME)
- Published value
- £3.0mlist or panel total repeated on every provider; not this contract's value
- Annual run-rate
- —list or panel total, not a run-rate
- Term
- Estimated end 20 Feb 2027 · start not published
- Reference
ocds-h6vhtk-0316a7
- Estimated end · in 115 daysCall-offPanel · 9 suppliers
South East England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: BOWMER AND KIRKLAND LIMITED, Galliford Try Construction Limited, ISG Construction Limited +6 more · Last contest: 16 bids (0 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £1.5bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 115 daysCall-offPanel · 9 suppliers
London
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: BOWMER AND KIRKLAND LIMITED, Galliford Try Construction Limited, ISG Construction Limited +6 more · Last contest: 17 bids (1 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £1.5bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 115 daysCall-offPanel · 11 suppliers
South West England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: BAM CONSTRUCTION LIMITED, Bouygues UK, Galliford Try Construction Limited +8 more · Last contest: 11 bids (0 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £1.1bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 115 daysCall-offPanel · 7 suppliers
West Region of SW England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: AJC Developments (South) Ltd, Halsall Construction Ltd, Kier Construction Ltd +4 more · Last contest: 10 bids (6 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £200mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 115 daysCall-offPanel · 6 suppliers
East Region of SW England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: E.W. Beard Limited, Halsall Construction Ltd, Kier Construction Ltd +3 more · Last contest: 12 bids (5 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £200mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,848 contracts and agreements end within 24 months, 4,753 in total · £3.2bn published GBP values end in the next 6 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 6 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services2,00679Business services: law, marketing, consulting1,66145Construction work1,51172IT services: consulting, software, internet93771Architectural, construction, engineering89150Repair and maintenance services83480Education and training services64648Software package and information systems565
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.