Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 6 months

Showing 1,066–1,080

  1. Ends · in 120 days

    Whalley Old Road Roundabout

    Blackburn With Darwen Borough Council · Local authority · North West England

    Incumbent: George Cox & Sons Limited

    Whalley Old Road Roundabout, Blackburn. The construction of a new, four arm roundabout to the east of the existing bus turning area on Whalley Old Road. The roundabout will provide a vehicular access to the existing Vistry Housing Developme…

    Published value
    £1.8m
    Annual run-rate
    £2.5mpublished value ÷ term, exc. VAT
    Term
    15 Jun 2026 → 26 Feb 2027 · 8 months
    Reference
    ocds-h6vhtk-06b950
  2. Ends · in 120 days

    A4046 Cwm to Aberbeeg, Drainage and Carriageway Works

    Blaenau Gwent County Borough Council · Local authority · Wales (Cymru)

    Incumbent: Alun Griffiths (Contractors) Limited (a6 a8 a9 b3 b4 b5 c3 c4 c5 d2 d3) · Last contest: awarded 37% under the estimate

    Works involve renewal of the highway drainage consisting of gullies, connections, carrier drain and associated manholes, kerb lines on both running lanes, re-surfacing consisting of overlay and inlay at tie ins, associated lining, signing a…

    Published value
    £1.6m
    Annual run-rate
    —term under 6 months
    Term
    14 Sept 2026 → 26 Feb 2027 · 5 months
    Reference
    ocds-h6vhtk-06bc09
  3. Ends · in 120 days

    Abbeyfield House Refurb

    Castle Point Borough Council · Local authority · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Indecon Building Limited

    Castle Point Borough Council is seeking tenders from suitable and qualified contractors for the Conversion of Abbeyfield House Chapple Lane Hadleigh Benfleet SS72PW in accordance with the conditions of contract and requirements of this invi…

    Published value
    £1.2m
    Annual run-rate
    —term under 6 months
    Term
    22 Sept 2026 → 26 Feb 2027 · 5 months
    Reference
    ocds-h6vhtk-056513
  4. Ends · in 120 days

    Seabrook Primary School Mobile Replacement

    Kent County Council · Local authority · South East England

    Incumbent: Redec Limited

    The contract scope comprises of demolition of old dilapidated mobile unit and replacing it with a new building to provide like for like replacement to provide 2nr classrooms, WCs and ancillary spaces, including a log cabin to replace lost s…

    Published value
    £848k
    Annual run-rate
    £1.4mpublished value ÷ term, exc. VAT
    Term
    18 Jul 2026 → 26 Feb 2027 · 7 months
    Reference
    ocds-h6vhtk-06d604
  5. Ends · in 120 days

    Chilled Water Main Chillers Replacement

    National Oceanography Centre · Other public body · South East England

    Incumbent: ARB Mechanical Engineering Ltd

    The National Oceanography Centre (NOC) is undertaking works under its Long Term Maintenance (LTM) Programme, which includes the end‑of‑life replacement of three cold‑water chillers. This procurement covers the replacement of three existing …

    Published value
    £627k
    Annual run-rate
    £624kpublished value ÷ term, exc. VAT
    Term
    25 Feb 2026 → 26 Feb 2027 · 1 yr
    Reference
    ocds-h6vhtk-065c7b
  6. Ends · in 120 days

    Feltham Centre for Health-Air Conditioning Replacement and Controls Installation

    NHS Property Services Limited · NHS & health

    Incumbent: ESSEX MECHANICAL SERVICES LIMITED

    Contract for Feltham Centre for Health-Air Conditioning Replacement and Controls Installation

    Published value
    £619k
    Annual run-rate
    —term under 6 months
    Term
    5 Oct 2026 → 26 Feb 2027 · 5 months
    Reference
    ocds-h6vhtk-06eadf
  7. Ends · in 120 days

    AP25138NC - High Oakham - Scaffolding

    Scape Group Limited (trading as SCAPE) · Other public body · East Midlands

    Incumbent: Empire Scaffolding (GB) Ltd

    This Contract Details Notice is issued in compliance with the Procurement Act 2023 for a Below Threshold Procurement and is issued on behalf of Arc Property Services Partnership Limited ("Arc Partnership"). Provision of Scaffolding Services…

    Published value
    £172k
    Annual run-rate
    £105kpublished value ÷ term, exc. VAT
    Term
    7 Jul 2025 → 26 Feb 2027 · 1.7 yrs
    Reference
    ocds-h6vhtk-060650
  8. Ends · in 120 days

    Internal Level Access Works Ewart, Shaftoe and Bramwell

    Newcastle City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: K D BUILDING SOLUTIONS LIMITED

    Internal level access works to blocks Ewart, Shaftoe and Bramwell

    Published value
    £120kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    9 Nov 2026 → 26 Feb 2027 · 4 months
    Reference
    ocds-h6vhtk-06f528
  9. Ends · in 120 days

    Bus Stop Infrastructure Improvements Gwynedd - Meirionnydd 2026/27

    Cyngor Gwynedd · Other public body · Nationwide (UK)

    Incumbent: GT DAVIES LTD

    Published value
    £114k
    Annual run-rate
    —term under 6 months
    Term
    14 Sept 2026 → 26 Feb 2027 · 5 months
    Reference
    ocds-h6vhtk-06d806
  10. Ends · in 120 days

    Bus Stop Infrastructure Improvements Gwynedd - Arfon 2026/27

    Cyngor Gwynedd · Other public body · Nationwide (UK)

    Incumbent: GT DAVIES LTD

    Published value
    £105k
    Annual run-rate
    —term under 6 months
    Term
    14 Sept 2026 → 26 Feb 2027 · 5 months
    Reference
    ocds-h6vhtk-06d804
  11. Ends · in 120 days

    Bus Stop Infrastructure Improvements Gwynedd - Dwyfor 2026/27

    Cyngor Gwynedd · Other public body · Nationwide (UK)

    Incumbent: Tom James Construction services Ltd

    Published value
    £102k
    Annual run-rate
    —term under 6 months
    Term
    14 Sept 2026 → 26 Feb 2027 · 5 months
    Reference
    ocds-h6vhtk-06d80e
  12. Ends · in 120 days

    Phase 1 and 2 Landscaping - Somerford

    Greensquareaccord · Other public body · West Midlands

    Incumbent: Ground Control Limited

    Works - To complete Phase 1 and 2 Landscaping at Somerford Place

    Published value
    £102k
    Annual run-rate
    £59kpublished value ÷ term, exc. VAT
    Term
    2 Jun 2025 → 26 Feb 2027 · 1.8 yrs
    Reference
    ocds-h6vhtk-051a73
  13. Ends · in 120 days

    TVCA-PROC-0777 - Gas Mains Diversion - Darlington Station

    Hartlepool Development Corporation · Other public body · North East England

    Incumbent: Northern Gas works

    Tees Valley Combined Authority (TVCA) ('the contracting authority') have completed a Direct award to Northern Gas Works to facilitate Northern Gas work to facilitate the Darlington Station Western Gateway project on Victoria Road. This is t…

    Published value
    £85k
    Annual run-rate
    £85kpublished value ÷ term, exc. VAT
    Term
    27 Feb 2026 → 26 Feb 2027 · 1 yr
    Reference
    ocds-h6vhtk-065a2d
  14. Ends · in 120 days

    13470 - Area-5 Paint & Repair 2026-27

    Winchester City Council · Local authority · South East England

    Incumbent: D R Jones Yeovil Ltd

    Cyclical cleaning, repair and decoration of properties within WCC Area 5.

    Published value
    £82kinc. VAT as published
    Annual run-rate
    £134kpublished value ÷ term, inc. VAT
    Term
    20 Jul 2026 → 26 Feb 2027 · 7 months
    Reference
    ocds-h6vhtk-06c59c
  15. Ends · in 120 days

    TVCA-PROC-0776 - Virgin Media - Darlington Station

    Hartlepool Development Corporation · Other public body · North East England

    Incumbent: Virgin Media

    Tees Valley Combined Authority (TVCA) ('the contracting authority') have completed a Direct award to Virgin Media. Diversionary works are required to facilitate the Darlington Western Gateway Scheme on Victoria Road This is the Statutory Pr…

    Published value
    £39k
    Annual run-rate
    £39kpublished value ÷ term, exc. VAT
    Term
    27 Feb 2026 → 26 Feb 2027 · 1 yr
    Reference
    ocds-h6vhtk-065a03

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,848 contracts and agreements end within 24 months, 4,753 in total · £3.2bn published GBP values end in the next 6 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months928
  2. 3–6 months583
  3. 6–12 months597
  4. 12–24 months740

Top sectors, next 6 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.