Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the all future end dates

Showing 1,981–1,995

  1. Ends · in 364 daysExtension option · up to 31 Oct 2030Buyer plans to re-tender 1 Jul 2027

    Pool Water Treatment, Service and Support

    UNIVERSITY OF LANCASTER · Education · North West England

    Incumbent: Sterling Hydrotech ltd

    Service engineers will be required to provide weekly Service and Maintenance attendance to carry out works to the Swimming Pool Filtration Equipment, Pumps, and Electrical Control Panel, Chemical Disinfection Systems including Chemical Dosi…

    Published value
    £291k
    Annual run-rate
    £145kpublished value ÷ term, exc. VAT
    Term
    1 Nov 2025 → 31 Oct 2027 · 2 yrs · up to 31 Oct 2030 with extensions
    Reference
    ocds-h6vhtk-055799
  2. Ends · in 364 days

    Public Rights of Way Annual Maintenance 2026 - 2027

    City of York Council · Local authority · Yorkshire and the Humber

    Incumbent: NORTH YORKSHIRE PLANT HIRE LTD

    City of York Council are seeking a contractor to deliver the Public Rights of Way Annual Maintenance 2026 - 2027 contract.

    Published value
    £72k
    Annual run-rate
    £49kpublished value ÷ term, exc. VAT
    Term
    11 May 2026 → 31 Oct 2027 · 1.5 yrs
    Reference
    ocds-h6vhtk-067fb7
  3. Ends · in 364 days

    Construction of New Storage Bays at Mid Devon Waste

    Mid Devon District Council · Local authority · South West England

    Incumbent: W & E Electrical Services

    Carry out site setup and site pack - Replicate provided design drawings for fabrication - Fabricate mild steel sections as per provided drawings - Fabricated steel work to be finished in yellow - Carry out site set-out and survey - Dig and …

    Published value
    £56k
    Annual run-rate
    £56kpublished value ÷ term, exc. VAT
    Term
    1 Nov 2026 → 31 Oct 2027 · 1 yr
    Reference
    ocds-h6vhtk-079042
  4. Ends · in 364 daysExtension option · up to 31 Oct 2028

    Temporary Dam works for M5 Crossing

    Stroud District Council · Local authority · South West England

    Incumbent: Robert Nicholas Limited · Last contest: awarded 19% over the estimate

    Temporary dams are required for damming the River Frome to enable the construction of a new canal channel in the river under the M5. Please see tender documents for further details.

    Published value
    £47k
    Annual run-rate
    £37kpublished value ÷ term, exc. VAT
    Term
    17 Jul 2026 → 31 Oct 2027 · 1.3 yrs · up to 31 Oct 2028 with extensions
    Reference
    ocds-h6vhtk-067447
  5. Ends · in 365 days

    Bilbohall Housing Phase 1

    Moray Council · Local authority · Scotland

    Incumbent: Ogilvie construction · Last contest: 3 bids (2 SME)

    Moray Council are looking for a contractor to build 28 units and shared infrastructure in the Bilbohall area of Elgin. These 28 units form the first phase of delivery of the Bilbohall Masterplan available at http://www.moray.gov.uk/moray_st…

    • Construction work for multi-dwelling buildings and individual houses
    Published value
    £12m
    Annual run-rate
    —start date not published
    Term
    Ends 1 Nov 2027 · start not published
    Reference
    ocds-h6vhtk-050c44
  6. Ends · in 365 days

    Replacement of the Fire Alarm System at the Residence of the British Embassy Madrid

    Foreign, Commonwealth and Development Office · Central government

    Incumbent: JOMAR SEGURIDAD SL

    A fire alarm system replacement at the Ambassador's Residence of the British Embassy Madrid with 2 years maintenance service.

    Published value
    £30k
    Annual run-rate
    £15kpublished value ÷ term, exc. VAT
    Term
    1 Oct 2025 → 1 Nov 2027 · 2.1 yrs
    Reference
    ocds-h6vhtk-05a4e4
  7. Ends · in 367 daysCall-offPanel · 23 suppliers

    Modular & Prefabricated Building Services

    Surrey and Borders Partnership NHS Foundation Trust · Charity · Nationwide (UK)

    Panel: Actaccom Ltd, Darwin Group, Flexibilistay +20 more · Last contest: 32 bids (1 SME)

    This contract is for the establishment of a Modular Building Framework to supply, design, construct, and maintain modular buildings for all public sector facilities including; educational establishments, or healthcare environments. The fram…

    • Construction work
    Published value
    £1.0bnvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    4 Nov 2025 → 3 Nov 2027 · 2 yrs
    Reference
    ocds-h6vhtk-04ca23
  8. Ends · in 367 daysCall-offPanel · 23 suppliers

    Modular & Prefabricated Building Solutions

    NHS Commercial Solutions · NHS & health · Nationwide (UK)

    Panel: Actaccom Ltd, Darwin Group, Flexibilistay +20 more · Last contest: 32 bids (1 SME)

    • Construction work
    Published value
    £600mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 3 Nov 2027 · start not published
    Reference
    ocds-h6vhtk-04ca23
  9. Ends · in 369 days

    B3181 Baulk Bridge Replacement

    Devon County Council · Local authority · South West England

    Incumbent: Wills Bros Civil Engineering Ltd · Last contest: awarded 35% over the estimate

    This contract requires a replacement bridge to replace the existing one on the B3181. The existing bridge is in poor condition and previous investigations have determined it is not economical to repair and therefore a new replacement bridge…

    Published value
    £8.1m
    Annual run-rate
    £4.9mpublished value ÷ term, exc. VAT
    Term
    16 Mar 2026 → 5 Nov 2027 · 1.7 yrs
    Reference
    ocds-h6vhtk-051835
  10. Estimated end · in 370 daysFramework recordPanel · 2 suppliers

    HCC - 06/21 - Bridges and Structures Framework

    Hertfordshire County Council · Local authority · East of England

    Panel: C Spencer Limited, Osbourne Infrastructure Limited

    • Engineering works and construction works
    Published value
    £36mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 6 Nov 2027 · start not published
    Reference
    ocds-h6vhtk-02be98
  11. Estimated end · in 372 days

    Water Hygiene

    Newcastle City Council · Local authority · North East England

    Incumbent: Integrated Water Services Ltd · Last contest: 6 bids

    Newcastle City Council (NCC) and Your Homes Newcastle (YHN) are seeking to appoint partners to provide water hygiene services to NCC public buildings and YHN properties in accordance with 'The Control of Legionella Bacteria in Water Systems…

    • Water-treatment work
    Published value
    £1.3m
    Annual run-rate
    —start date not published
    Term
    Estimated end 8 Nov 2027 · start not published
    Reference
    ocds-h6vhtk-0410f3
  12. Estimated end · in 372 days

    Water Hygiene

    Newcastle City Council · Local authority · North East England

    Incumbent: hsl Compliance Ltd · Last contest: 2 bids

    Newcastle City Council (NCC) and Your Homes Newcastle (YHN) are seeking to appoint partners to provide water hygiene services to NCC public buildings and YHN properties in accordance with 'The Control of Legionella Bacteria in Water Systems…

    • Water-treatment work
    Published value
    £60k
    Annual run-rate
    —start date not published
    Term
    Estimated end 8 Nov 2027 · start not published
    Reference
    ocds-h6vhtk-0410f3
  13. Estimated end · in 373 daysFramework recordPanel · 3 suppliers

    Civil Resources_2023

    Leicestershire County Council · Local authority · East Midlands

    Panel: Allroads Asphalt Solutions Ltd, CF Construction (Collingham) Ltd, Cashelton Construction Ltd

    • Construction work for highways, roads
    Published value
    £4.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 9 Nov 2027 · start not published
    Reference
    ocds-h6vhtk-03f6fa
  14. Estimated end · in 374 daysFramework recordPanel · 4 suppliers

    New Assets Framework Agreement 2024

    Somerset Council · Local authority · South West England

    Panel: Hanson Quarry Products Europe Ltd, KIELY BROS LTD, Kier Highways Limited +1 more

    • Construction work for highways

    Re-procurement plannedHighways Structures Urgent & Minor Works Framework 2027 · tender expected

    Published value
    £21mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 Nov 2027 · start not published
    Reference
    ocds-h6vhtk-030ef3
  15. Ends · in 374 days

    WO2151 Replacement of Temporary Classrooms at Frogwell, Hullavington and Minety Primary Schools

    Wiltshire Council · Local authority · South West England

    Incumbent: Stepnell Limited

    Wiltshire Council intend to appoint a main Contractor via a two-stage procurement opportunity to deliver an important project on a full design and build basis across three primary schools in Wiltshire. Stage 1 of the procurement process is …

    Published value
    £6.1m
    Annual run-rate
    £3.0mpublished value ÷ term, exc. VAT
    Term
    10 Nov 2025 → 10 Nov 2027 · 2 yrs
    Reference
    ocds-h6vhtk-04f8e8

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,800 contracts and agreements end within 24 months, 4,703 in total · £33bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months866
  2. 3–6 months574
  3. 6–12 months615
  4. 12–24 months745

Top sectors, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.