Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the all future end dates

Showing 2,266–2,280

  1. Ends · in 485 daysExtension option · up to 28 Feb 2029

    AT1377 Principal Contractor for New Builds at Sylam & Waulud

    Luton Borough Council · Local authority · East of England

    Incumbent: Parrott Construction Ltd · Last contest: awarded at the estimate

    Luton Council are looking to appoint a principal contractor to deliver two residential affordable schemes, one for 5 homes and another for 6 homes.

    Published value
    £4.8m
    Annual run-rate
    £2.5mpublished value ÷ term, exc. VAT
    Term
    31 Mar 2026 → 29 Feb 2028 · 1.9 yrs · up to 28 Feb 2029 with extensions
    Reference
    ocds-h6vhtk-0566f6
  2. Ends · in 485 days

    Composite Fire Door Replacement

    The North Yorkshire Council · Local authority · Yorkshire and the Humber

    Incumbent: Kingfisher UPVC Windows & Doors Ltd

    Supply and install fully compliant FD30 Fire doors and screens.

    Published value
    £200k
    Annual run-rate
    £109kpublished value ÷ term, exc. VAT
    Term
    1 May 2026 → 29 Feb 2028 · 1.8 yrs
    Reference
    ocds-h6vhtk-06f503
  3. Ends · in 485 days

    Rockingham Road - Diversion Works

    Leicestershire County Council · Local authority · East Midlands

    Incumbent: Generator Power Ltd

    Diversion Works by National Grid Electricity Distribution (East Midlands) plc ("NGED") at Nrswa C3 - Scheme Sec 106-00, Phase 1 Gorse Lane, Market Harborough, LE16.

    Published value
    £45k
    Annual run-rate
    £45kpublished value ÷ term, exc. VAT
    Term
    1 Mar 2027 → 29 Feb 2028 · 1 yr
    Reference
    ocds-h6vhtk-06c540
  4. Ends · in 485 days

    Storage Systems Maintenance, Inspection and Repairs

    University of East Anglia · Education · East of England

    Incumbent: Bruynzeel Storage Systems Limited

    The UEA library is a Grade 2 listed building, requiring annual inspections and maintenance to maintain existing equipment and ensure it is safe and usable for staff, students and the public. The supplier will provide service and annual main…

    Published value
    £30kinc. VAT as published
    Annual run-rate
    £10kpublished value ÷ term, inc. VAT
    Term
    5 Mar 2025 → 29 Feb 2028 · 3 yrs
    Reference
    ocds-h6vhtk-050a5d
  5. Estimated end · in 486 daysCall-off

    T22/0060 - COACH LANE: Solar PV arrays Design

    University of Northumbria at Newcastle · Education · North East England

    Incumbent: Equans Energy Services UK Limited · Last contest: 1 bid (0 SME)

    • Construction work for university buildings
    Published value
    £4kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 1 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-036b54
  6. Ends · in 486 days

    Walthamstow School for Girls - Curtain Walling to Stairs

    London Borough of Waltham Forest · Local authority · Nationwide (UK)

    Incumbent: IMS BUILDING SOLUTIONS LTD

    LBWF Walthamstow School for Girls - Curtain Walling to Stairwells

    Published value
    £225k
    Annual run-rate
    £167kpublished value ÷ term, exc. VAT
    Term
    26 Oct 2026 → 1 Mar 2028 · 1.3 yrs
    Reference
    ocds-h6vhtk-07945a
  7. Estimated end · in 487 days

    PS-25-143 - Stewarton Acad - Alterations, Extension and Refurbishment (PRJ0013254)

    East Ayrshire Council · Local authority · Scotland

    Incumbent: Heron Bros. Ltd. · Last contest: 5 bids (0 SME)

    The project proposes to deliver a New Extension to the existing school building to provide new technical workshops and design studios for the technical department, science labs and a multipurpose hall. Alterations to the existing school wil…

    • Construction work for buildings relating to education and research
    Published value
    £11m
    Annual run-rate
    —start date not published
    Term
    Estimated end 2 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-05654c
  8. Estimated end · in 489 daysFramework record

    National Framework Agreement for MMC Category 1 Construction Systems

    Procurement for Housing · Nationwide (UK)

    Incumbent: ZED PODS LIMITED

    • Construction work
    Published value
    £400mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 4 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-041c7f
  9. Estimated end · in 489 daysCall-off

    Support and Maintenance for Real Time Displays

    West Yorkshire Combined Authority · Local authority · Nationwide (UK), Yorkshire and the Humber

    Incumbent: R2P UK SYSTEMS LIMITED · Last contest: 3 bids (3 SME)

    • Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
    Published value
    £1.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 4 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-037ec3
  10. Ends · in 489 days

    South Molton CLT - CAS-01064-D4M2V2

    Aster Group Limited · Other public body · South West England

    Incumbent: Pearce Construction (Barnstaple) Ltd

    Design & Build of 40 Homes for Social Rent at South Molton, North Devon. The design, construction and completion of 40 new homes for rent. The works include all site preparation, surveys, services, roadways, drainage, off site works, hard a…

    Published value
    £7.5minc. VAT as published
    Annual run-rate
    £3.8mpublished value ÷ term, inc. VAT
    Term
    5 Mar 2026 → 4 Mar 2028 · 2 yrs
    Reference
    ocds-h6vhtk-051d46
  11. Estimated end · in 490 daysFramework recordPanel · 16 suppliers

    Landscape and External Works

    Hampshire County Council · Local authority · South East England, South West England, Wales (Cymru)

    Panel: 3 Counties Civil Engineering Ltd, AMS Contracting Ltd, Aquascience Ltd +13 more

    • Landscaping work
    Published value
    £26mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 5 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-03be29
  12. Estimated end · in 490 daysFramework recordPanel · 8 suppliers

    North East Lincolnshire Disabled Facilities Grant (DFG) Framework

    NORTH EAST LINCOLNSHIRE COUNCIL · Local authority · Yorkshire and the Humber

    Panel: Able 4 Enterprise Ltd, Askerton Homes Limited, E.S.Rudkin Limited +5 more

    Equans Services Ltd on behalf of North East Lincolnshire Council (the Authority) is seeking suitably qualified contractors for the renewal of the DFG framework. The framework will deliver the authority's Disabled Facilities Grants, which pr…

    • Construction work

    Re-procurement plannedPre Market Engagement North East Lincolnshire Highways Framework 2026 - 2030 · tender expected

    Published value
    £8.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 5 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-041092
  13. Estimated end · in 490 days

    Healthy Homes Dorset 2024

    Dorset Council · Local authority · South West England

    Incumbent: Ridgewater Energy Ltd · Last contest: 7 bids (6 SME) · awarded at the estimate

    Each winter there are approximately 500 avoidable Excess Winter Deaths (EWDs) in Dorset and an estimated 4,000 related emergency hospital admissions, 16,000 related outpatient visits, and 16,000 related social care calls, the majority of wh…

    • Thermal insulation work

    Re-procurement plannedHealthy Homes Dorset · tender expected

    Published value
    £5.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 5 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-0426e2
  14. Estimated end · in 492 daysFramework recordPanel · 5 suppliers

    Framework Agreement for Major Construction Works

    Gloucestershire County Council · Local authority · South West England

    Panel: Barnwood Limited, E.G. Carter & Company Limited, E.W. Beard Limited +2 more

    • Building construction work
    Published value
    Not publishedlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 7 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-04032e
  15. Estimated end · in 492 days

    DC22031 - Fixed Wire Testing

    NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust) · NHS & health · Wales (Cymru)

    Incumbent: Guardian Electrical Compliance Ltd · Last contest: 5 bids (5 SME)

    NHS Wales Shared Service Partnership on behalf of Cardiff and Vale University Health Board wish to inform the market that they are seeking a contractor for 5 Yearly Periodic Inspection and Testing of Electrical Installations.

    • Electrical wiring work
    Published value
    £636k
    Annual run-rate
    —start date not published
    Term
    Estimated end 7 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-037414

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,723 contracts and agreements end within 24 months, 4,618 in total · £33bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months813
  2. 3–6 months578
  3. 6–12 months593
  4. 12–24 months739

Top sectors, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.