- Estimated end · in 678 days
Provision of Heating & Boiler System Upgrades
Norse Commercial Services Limited · East Midlands
Incumbent: Sure Maintenance Ltd · Last contest: 6 bids (4 SME) · awarded 31% over the estimate
The requirement of works for carrying out surveys, heating systems upgrades, boiler replacements roll out alongside other relevant provisions including obtaining all ‘major’ materials and components, including but not limited to: surveying,…
- Published value
- £3.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Sept 2028 · start not published
- Reference
ocds-h6vhtk-03ec13
- Estimated end · in 678 days
PKC13259 Domestic Smoke Alarm Replacement
Perth & Kinross Council · Local authority · Scotland
Incumbent: Valley Group Limited · Last contest: 5 bids (5 SME) · awarded 49% under the estimate
Perth and Kinross Council were seeking to appoint a suitably qualified and experienced contractors to carry out the smoke alarm replacements in approx. 2,300 properties. The proposed scope of works is to replace the smoke alarms installatio…
- Published value
- £2.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Sept 2028 · start not published
- Reference
ocds-h6vhtk-04de8b
- Estimated end · in 679 daysFramework recordPanel · 6 suppliers
TRG Cladding Remediation Framework
The Riverside Group · Nationwide (UK)
Panel: Breyer Group Plc, Guildmore Limited, Kier Services Ltd TA Kier Places +3 more
- Published value
- £300mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 10 Sept 2028 · start not published
- Reference
ocds-h6vhtk-045582
- Ends · in 679 daysExtension option · up to 31 Mar 2029
Upper Thurne Package 2 Construction Works
Broads (2006) Internal Drainage Board · Other public body · East of England
Incumbent: BAM Nuttall Limited · Last contest: awarded 53% under the estimate
This procurement covers the design and construction of 3 x pumping stations, namely Martham pumping station, Potter Heigham pumping station and Brograve pumping station. It also allows for the optionality of adding one additional similar pu…
Re-procurement openUpper Thurne Package 3 Construction Works · bids close
- Published value
- £9.5m
- Annual run-rate
- £3.9mpublished value ÷ term, exc. VAT
- Term
- 14 Apr 2026 → 10 Sept 2028 · 2.4 yrs · up to 31 Mar 2029 with extensions
- Reference
ocds-h6vhtk-05d5d8
- Ends · in 679 days
Support contractor for Housing Maintenance DLO
East Suffolk Council · Local authority · East of England
Incumbent: R J Dean Plasterers Limited
The Council is seeking to procure the services of a suitably experienced and qualified contractor to provide support to their Housing Repairs and Maintenance operation for its housing stock, we currently have approximately 4500 council owne…
- Published value
- £240kinc. VAT as published
- Annual run-rate
- £120kpublished value ÷ term, inc. VAT
- Term
- 11 Sept 2026 → 10 Sept 2028 · 2 yrs
- Reference
ocds-h6vhtk-0674fc
- Estimated end · in 682 daysCall-off
Tree Maintenance - Reactive - Homes for Haringey
London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland
Incumbent: Tree Guy Liam McGough · Last contest: 9 bids (0 SME)
- Published value
- £3kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 13 Sept 2028 · start not published
- Reference
ocds-h6vhtk-029345
- Ends · in 686 days
Affordable Housing Property at Sandy Hill Saundersfoot
Pembrokeshire County Council · Local authority · Wales (Cymru)
Incumbent: Persimmon Homes Limited
Development of affordable housing property at Sandy Hill Saundersfoot as part of a Golden Brick Agreement
- Published value
- £1.2m
- Annual run-rate
- £447kpublished value ÷ term, exc. VAT
- Term
- 5 Jan 2026 → 17 Sept 2028 · 2.7 yrs
- Reference
ocds-h6vhtk-05fafa
- Estimated end · in 688 daysFramework record
SVRP Civils & Marine Works Framework
Caledonian Maritime Assets Ltd (Utility) · Scotland
Incumbent: George Leslie Ltd
- Published value
- £16mlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 19 Sept 2028 · start not published
- Reference
ocds-h6vhtk-0602d8
- Estimated end · in 688 days
Replacement of Dwelling Doors
Gentoo Group Limited · North East England
Incumbent: Anglian Building Products · Last contest: 10 bids (7 SME)
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 19 Sept 2028 · start not published
- Reference
ocds-h6vhtk-044a8a
- Estimated end · in 690 daysCall-off
Tree Maintenance - Reactive - Homes for Haringey
London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland
Incumbent: CSG Usher's Ltd · Last contest: 9 bids (0 SME)
- Published value
- £900value of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 21 Sept 2028 · start not published
- Reference
ocds-h6vhtk-029345
- Estimated end · in 691 days
DPS1 1300 - HANT N17 ROUTE 5
London Borough of Haringey · Local authority · North West England, East Midlands, Greater London
Incumbent: Hickson Wardle Treecare · Last contest: 12 bids (8 SME)
- Published value
- £300k
- Annual run-rate
- —start date not published
- Term
- Estimated end 22 Sept 2028 · start not published
- Reference
ocds-h6vhtk-047e2d
- Estimated end · in 692 daysFramework recordPanel · 6 suppliers
Minor Works Services (for schemes up to £1m ex vat)
NEUPC Ltd · North East England
Panel: ARCAS BUILDING SOLUTIONS LIMITED, Aptus Construction Ltd, Britcon (UK) Limited +3 more
- Published value
- £40mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 23 Sept 2028 · start not published
- Reference
ocds-h6vhtk-045562
- Estimated end · in 693 daysFramework recordPanel · 3 suppliers
Framework for New Build Construction and Development Projects
Curo Places Limited · South West England
Panel: Curo Enterprise Limited, E.G. Carter & Company Limited, Speller Metcalfe Malvern Limited
- Published value
- £170mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 24 Sept 2028 · start not published
- Reference
ocds-h6vhtk-0454e8
- Estimated end · in 693 daysFramework recordPanel · 6 suppliers
Cumberland Council Minor Works Construction Framework
Cumberland Council · Local authority · North West England
Panel: EE Thompson & Son Ltd, PK Engineering, Partnering In Property Management (PPM) Limited +3 more
- Published value
- £24mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 24 Sept 2028 · start not published
- Reference
ocds-h6vhtk-0468f5
- Ends · in 693 days
Planned Preventative Maintenance service for ward windows
Sussex Partnership NHS Foundation Trust · Central government
Incumbent: Britplas
Planned Preventative Maintenance service for ward windows installed at RISES
- Published value
- £57k
- Annual run-rate
- £28kpublished value ÷ term, exc. VAT
- Term
- 25 Sept 2026 → 24 Sept 2028 · 2 yrs
- Reference
ocds-h6vhtk-06c875
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,723 contracts and agreements end within 24 months, 4,618 in total · £33bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services9,88079Business services: law, marketing, consulting5,50460Transport services (except waste transport)4,97345Construction work4,61850Repair and maintenance services3,69172IT services: consulting, software, internet3,49271Architectural, construction, engineering3,28980Education and training services2,858
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.