Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the all future end dates

Showing 2,641–2,655

  1. Estimated end · in 678 days

    Provision of Heating & Boiler System Upgrades

    Norse Commercial Services Limited · East Midlands

    Incumbent: Sure Maintenance Ltd · Last contest: 6 bids (4 SME) · awarded 31% over the estimate

    The requirement of works for carrying out surveys, heating systems upgrades, boiler replacements roll out alongside other relevant provisions including obtaining all ‘major’ materials and components, including but not limited to: surveying,…

    • Central-heating installation work
    Published value
    £3.3m
    Annual run-rate
    —start date not published
    Term
    Estimated end 9 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-03ec13
  2. Estimated end · in 678 days

    PKC13259 Domestic Smoke Alarm Replacement

    Perth & Kinross Council · Local authority · Scotland

    Incumbent: Valley Group Limited · Last contest: 5 bids (5 SME) · awarded 49% under the estimate

    Perth and Kinross Council were seeking to appoint a suitably qualified and experienced contractors to carry out the smoke alarm replacements in approx. 2,300 properties. The proposed scope of works is to replace the smoke alarms installatio…

    • Fire-prevention installation works
    Published value
    £2.1m
    Annual run-rate
    —start date not published
    Term
    Estimated end 9 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-04de8b
  3. Estimated end · in 679 daysFramework recordPanel · 6 suppliers

    TRG Cladding Remediation Framework

    The Riverside Group · Nationwide (UK)

    Panel: Breyer Group Plc, Guildmore Limited, Kier Services Ltd TA Kier Places +3 more

    • Cladding works
    Published value
    £300mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-045582
  4. Ends · in 679 daysExtension option · up to 31 Mar 2029

    Upper Thurne Package 2 Construction Works

    Broads (2006) Internal Drainage Board · Other public body · East of England

    Incumbent: BAM Nuttall Limited · Last contest: awarded 53% under the estimate

    This procurement covers the design and construction of 3 x pumping stations, namely Martham pumping station, Potter Heigham pumping station and Brograve pumping station. It also allows for the optionality of adding one additional similar pu…

    Re-procurement openUpper Thurne Package 3 Construction Works · bids close

    Published value
    £9.5m
    Annual run-rate
    £3.9mpublished value ÷ term, exc. VAT
    Term
    14 Apr 2026 → 10 Sept 2028 · 2.4 yrs · up to 31 Mar 2029 with extensions
    Reference
    ocds-h6vhtk-05d5d8
  5. Ends · in 679 days

    Support contractor for Housing Maintenance DLO

    East Suffolk Council · Local authority · East of England

    Incumbent: R J Dean Plasterers Limited

    The Council is seeking to procure the services of a suitably experienced and qualified contractor to provide support to their Housing Repairs and Maintenance operation for its housing stock, we currently have approximately 4500 council owne…

    Published value
    £240kinc. VAT as published
    Annual run-rate
    £120kpublished value ÷ term, inc. VAT
    Term
    11 Sept 2026 → 10 Sept 2028 · 2 yrs
    Reference
    ocds-h6vhtk-0674fc
  6. Estimated end · in 682 daysCall-off

    Tree Maintenance - Reactive - Homes for Haringey

    London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland

    Incumbent: Tree Guy Liam McGough · Last contest: 9 bids (0 SME)

    • Construction work
    Published value
    £3kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 13 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-029345
  7. Ends · in 686 days

    Affordable Housing Property at Sandy Hill Saundersfoot

    Pembrokeshire County Council · Local authority · Wales (Cymru)

    Incumbent: Persimmon Homes Limited

    Development of affordable housing property at Sandy Hill Saundersfoot as part of a Golden Brick Agreement

    Published value
    £1.2m
    Annual run-rate
    £447kpublished value ÷ term, exc. VAT
    Term
    5 Jan 2026 → 17 Sept 2028 · 2.7 yrs
    Reference
    ocds-h6vhtk-05fafa
  8. Estimated end · in 688 daysFramework record

    SVRP Civils & Marine Works Framework

    Caledonian Maritime Assets Ltd (Utility) · Scotland

    Incumbent: George Leslie Ltd

    • Works for complete or part construction and civil engineering work
    Published value
    £16mlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 19 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-0602d8
  9. Estimated end · in 688 days

    Replacement of Dwelling Doors

    Gentoo Group Limited · North East England

    Incumbent: Anglian Building Products · Last contest: 10 bids (7 SME)

    • Joinery work
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 19 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-044a8a
  10. Estimated end · in 690 daysCall-off

    Tree Maintenance - Reactive - Homes for Haringey

    London Borough of Haringey - Parks and Leisure · Local authority · Greater London, Northern Ireland

    Incumbent: CSG Usher's Ltd · Last contest: 9 bids (0 SME)

    • Construction work
    Published value
    £900value of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 21 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-029345
  11. Estimated end · in 691 days

    DPS1 1300 - HANT N17 ROUTE 5

    London Borough of Haringey · Local authority · North West England, East Midlands, Greater London

    Incumbent: Hickson Wardle Treecare · Last contest: 12 bids (8 SME)

    • Construction work
    Published value
    £300k
    Annual run-rate
    —start date not published
    Term
    Estimated end 22 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-047e2d
  12. Estimated end · in 692 daysFramework recordPanel · 6 suppliers

    Minor Works Services (for schemes up to £1m ex vat)

    NEUPC Ltd · North East England

    Panel: ARCAS BUILDING SOLUTIONS LIMITED, Aptus Construction Ltd, Britcon (UK) Limited +3 more

    • Construction work
    Published value
    £40mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 23 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-045562
  13. Estimated end · in 693 daysFramework recordPanel · 3 suppliers

    Framework for New Build Construction and Development Projects

    Curo Places Limited · South West England

    Panel: Curo Enterprise Limited, E.G. Carter & Company Limited, Speller Metcalfe Malvern Limited

    • Construction work
    Published value
    £170mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 24 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-0454e8
  14. Estimated end · in 693 daysFramework recordPanel · 6 suppliers

    Cumberland Council Minor Works Construction Framework

    Cumberland Council · Local authority · North West England

    Panel: EE Thompson & Son Ltd, PK Engineering, Partnering In Property Management (PPM) Limited +3 more

    • Construction work
    Published value
    £24mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 24 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-0468f5
  15. Ends · in 693 days

    Planned Preventative Maintenance service for ward windows

    Sussex Partnership NHS Foundation Trust · Central government

    Incumbent: Britplas

    Planned Preventative Maintenance service for ward windows installed at RISES

    Published value
    £57k
    Annual run-rate
    £28kpublished value ÷ term, exc. VAT
    Term
    25 Sept 2026 → 24 Sept 2028 · 2 yrs
    Reference
    ocds-h6vhtk-06c875

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,723 contracts and agreements end within 24 months, 4,618 in total · £33bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months813
  2. 3–6 months578
  3. 6–12 months593
  4. 12–24 months739

Top sectors, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.