Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the all future end dates
Showing 361–375
- Estimated end · in 809 daysFramework recordPanel · 8 suppliers
PLACE626H Supply of Roadstone Materials
Derbyshire County Council · Local authority · East Midlands
Panel: Aggregate Industries UK Ltd, Bradley Brothers Ltd, Breedon Aggregates Ltd +5 more
- Published value
- £2.0mlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 14 Jan 2029 · start not published
- Reference
ocds-h6vhtk-04bd2d
- Estimated end · in 810 days
PLACE623H Supply of Skips and Waste Disposal Services
Derbyshire County Council · Local authority · Nationwide (UK), East Midlands
Incumbent: Bagnall & Morris (Waste Services) Ltd · Last contest: 4 bids (4 SME)
The award of the contract for the supply of a range of skips and waste disposal services to meet the requirements of all departments of Derbyshire County Council (DCC). DCC require this contract to be open to all DCC owned properties or pro…
- Published value
- £2.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Jan 2029 · start not published
- Reference
ocds-h6vhtk-04b24e
- Estimated end · in 810 days
PLACE623H Supply of Skips and Waste Disposal Services
Derbyshire County Council · Local authority · Nationwide (UK), East Midlands
Incumbent: Bagnall & Morris (Waste Services) Ltd · Last contest: 5 bids (5 SME)
The award of the contract for the supply of a range of skips and waste disposal services to meet the requirements of all departments of Derbyshire County Council (DCC). DCC require this contract to be open to all DCC owned properties or pro…
- Published value
- £2.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Jan 2029 · start not published
- Reference
ocds-h6vhtk-04b24e
- Estimated end · in 812 daysFramework record
Framework for Supply, Installation and Maintenance of Authority Owned Bus Shelter and Bus Stop Infrastructure
Hampshire County Council · Local authority · South East England, South West England
Incumbent: Externiture Ltd
- Published value
- £8.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 17 Jan 2029 · start not published
- Reference
ocds-h6vhtk-04b2d3
- Estimated end · in 819 days
Invitation to Tender for the Supply and Installation of 83 Bus Shelters, including The Dismantling and Disposal of the Current Infrastructure
Chorley Council · Local authority · North West England
Incumbent: Trueform Engineering Limited · Last contest: 4 bids
Supply and Installation of 83 Bus Shelters, including The Dismantling and Disposal of the Current Infrastructure.
- Published value
- £450k
- Annual run-rate
- —start date not published
- Term
- Estimated end 24 Jan 2029 · start not published
- Reference
ocds-h6vhtk-03ec8b
- Estimated end · in 822 daysCall-offPanel · 6 suppliers
Fencing, including installation services
Hampshire County Council · Local authority · East Midlands, West Midlands, East of England, South East England, South West England
Panel: Apex Highway Fencing Limited, CHRIS WHEELER CONSTRUCTION LIMITED, Fernden Construction (Winchester) Limited +3 more · Last contest: 6 bids (6 SME)
Framework Agreement for the Supply of Facilities Management Equipment, Fencing, Floor Cleaning Machines, White Goods and Commercial Laundry Equipment 1 March 2025 to 28 February 2029, for a period of 4 years (48 months). The Framework compr…
- Published value
- £1.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 27 Jan 2029 · start not published
- Reference
ocds-h6vhtk-04b652
- Estimated end · in 822 daysCall-offPanel · 8 suppliers
Floor Cleaning Machines and Accessories
Hampshire County Council · Local authority · East Midlands, West Midlands, East of England, South East England, South West England
Panel: Aardvark Appliances Limited, Capital Cleaning (Kent) Limited, DIVERSEY LTD +5 more · Last contest: 8 bids (4 SME)
Framework Agreement for the Supply of Facilities Management Equipment, Fencing, Floor Cleaning Machines, White Goods and Commercial Laundry Equipment 1 March 2025 to 28 February 2029, for a period of 4 years (48 months). The Framework compr…
- Published value
- £1.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 27 Jan 2029 · start not published
- Reference
ocds-h6vhtk-04b652
- Estimated end · in 822 daysCall-offPanel · 3 suppliers
White Goods
Hampshire County Council · Local authority · East Midlands, West Midlands, East of England, South East England, South West England
Panel: AO RETAIL LIMITED, Aardvark Appliances Limited, Stearn Electric Co Ltd · Last contest: 4 bids (2 SME)
Framework Agreement for the Supply of Facilities Management Equipment, Fencing, Floor Cleaning Machines, White Goods and Commercial Laundry Equipment 1 March 2025 to 28 February 2029, for a period of 4 years (48 months). The Framework compr…
- Published value
- £1.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 27 Jan 2029 · start not published
- Reference
ocds-h6vhtk-04b652
- Estimated end · in 822 daysCall-offPanel · 7 suppliers
Commercial Laundry Equipment
Hampshire County Council · Local authority · East Midlands, West Midlands, East of England, South East England, South West England
Panel: Aardvark Appliances Limited, Allsop & Francis Ltd, ELECTROLUX PROFESSIONAL LIMITED +4 more · Last contest: 7 bids (6 SME)
Framework Agreement for the Supply of Facilities Management Equipment, Fencing, Floor Cleaning Machines, White Goods and Commercial Laundry Equipment 1 March 2025 to 28 February 2029, for a period of 4 years (48 months). The Framework compr…
- Published value
- £1.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 27 Jan 2029 · start not published
- Reference
ocds-h6vhtk-04b652
- Estimated end · in 828 days
Frozen Plasma Packaging
NHS Blood and Transplant · NHS & health · Nationwide (UK)
Incumbent: The Cool Ice Box Company · Last contest: 2 bids · awarded 29% over the estimate
Packaging Solution for frozen plasma components / products
- Published value
- £360k
- Annual run-rate
- —start date not published
- Term
- Estimated end 2 Feb 2029 · start not published
- Reference
ocds-h6vhtk-03cebb
- Estimated end · in 831 daysLinked to a framework or DPS
Framework for the provision of PE Pipe & Fittings
NORTHERN GAS NETWORKS LIMITED · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent not published
Framework for the supply of Polyethylene Pipe and Fittings compliant to the relevant standards.
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 5 Feb 2029 · start not published
- Reference
ocds-h6vhtk-0482de
- Estimated end · in 831 daysLinked to a framework or DPS
Framework for the provision of PE Pipe & Fittings
NORTHERN GAS NETWORKS LIMITED · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent not published
Framework for the supply of Polyethylene Pipe and Fittings compliant to the relevant standards.
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 5 Feb 2029 · start not published
- Reference
ocds-h6vhtk-0482de
- Estimated end · in 831 daysLinked to a framework or DPS
Framework for the provision of PE Pipe & Fittings
NORTHERN GAS NETWORKS LIMITED · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent not published
Framework for the supply of Polyethylene Pipe and Fittings compliant to the relevant standards.
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 5 Feb 2029 · start not published
- Reference
ocds-h6vhtk-0482de
- Estimated end · in 831 daysLinked to a framework or DPS
Framework for the provision of PE Pipe & Fittings
NORTHERN GAS NETWORKS LIMITED · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent not published
Framework for the supply of Polyethylene Pipe and Fittings compliant to the relevant standards.
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 5 Feb 2029 · start not published
- Reference
ocds-h6vhtk-0482de
- Estimated end · in 833 daysFramework recordPanel · 12 suppliers
Framework Agreement for Merchant Distribution (Repair)
PROCURE PLUS HOLDINGS LIMITED · Other public body · Nationwide (UK)
Panel: City Electrical Factors Limited, City Plumbing Supplies Holdings Limited, Cu-Plas Supplies Limited +9 more
- Published value
- £200mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 7 Feb 2029 · start not published
- Reference
ocds-h6vhtk-04b611
When contracts end · Construction structures and materials i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
340 contracts and agreements end within 24 months, 505 in total · £2.6bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services9,87279Business services: law, marketing, consulting5,54760Transport services (except waste transport)4,94245Construction work4,73450Repair and maintenance services3,69972IT services: consulting, software, internet3,48771Architectural, construction, engineering3,30480Education and training services2,867
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.