Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the all future end dates
Showing 691–705
- Ends · in 62 days
TWBC - Benhall Mill Road Parks Depot
Tunbridge Wells Borough Council · Local authority · South East England
Incumbent: AMMCASS CONSTRUCTION ENGINEERING GROUP LIMITED · Last contest: awarded at the estimate
Tunbridge Wells Borough Council (TWBC) is looking to complete the refurbishment of the existing crematorium depot building and construction of a new garage for the housing of machinery, in accordance with the design information contained in…
- Published value
- £638kinc. VAT as published
- Annual run-rate
- —not computed
- Term
- 14 Jul 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-05fd40
- Ends · in 62 days
Replacement of Communal Doors & Obsolete Door Entry Systems
CALICO HOMES LIMITED · Other public body · North West England
Incumbent: Security Surveillance Systems Ltd (T/A SS Group Ltd)
The provision of 46 replacement communal doors and 64 obsolete door entry systems for Calico Homes. The programme will improve safety, security and operational control within communal areas.
- Published value
- £597kinc. VAT as published
- Annual run-rate
- £1.2mpublished value ÷ term, inc. VAT
- Term
- 1 Jul 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-078e8e
- Ends · in 62 days
Mount Edgcumbe Garden Battery Refurbishment
Plymouth City Council · Local authority · South West England
Incumbent: TEC CONSTRUCTION (HOLDINGS) LTD
Refurbishment and renovation of Mount Edgcumbe Garden Battery and associated works
- Published value
- £589k
- Annual run-rate
- —not computed
- Term
- 6 Jul 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06ccde
- Ends · in 62 days
Midland Metro Limited (MML) - Low-level Surfacing Works at Winson Green LR030
West Midlands Combined Authority · Local authority · West Midlands
Incumbent: Haigh Rail Limited
Midland Metro Limited (MML) are are awarding a Works Contract for the Provision of Low-Level Surfacing Works at Winson Green Tram Stop under a Call-Off Order utilising the MML Single Supplier Track Framework Agreement.
- Published value
- £545k
- Annual run-rate
- £573kpublished value ÷ term, exc. VAT
- Term
- 19 Jan 2026 → 31 Dec 2026 · 11 months
- Reference
ocds-h6vhtk-066411
- Ends · in 62 days
UKRI-6336 - Fire Stopping and Fire Door Remedials
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Airport Facilities (Maintenance) Ltd
The Provision of Fire Stopping and Fire Door Remedials
- Published value
- £500k
- Annual run-rate
- —term under 6 months
- Term
- 15 Oct 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-077f23
- Ends · in 62 days
Construction of a cemetery extension
Bracknell Forest Council · Local authority · South East England
Incumbent: White Horse Contracting Ltd · Last contest: awarded 13% under the estimate
To provide works to convert land currently laid out for golf purposes in to a suitable cemetery, including all relevant ground works, roads, footpaths, planting, access/egress and associated requirements as per the instructions laid out wit…
- Published value
- £433k
- Annual run-rate
- —not computed
- Term
- 13 Jul 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06140d
- Ends · in 62 days
NUN – Lot 1 Coronation Walk Lot 2 Sandon Park footpath/cycleway
Nuneaton and Bedworth Borough Council · Local authority · West Midlands
Incumbent: Ground Control Limited
Nuneaton and Bedworth Borough Council’s Parks and Greenspace team have a remit to improve and maintain play and recreation facilities throughout the Borough.Utilising capital budgets these Green Spaces will receive tarmacked footpath/cyclew…
- Published value
- £427k
- Annual run-rate
- £536kpublished value ÷ term, exc. VAT
- Term
- 16 Mar 2026 → 31 Dec 2026 · 10 months
- Reference
ocds-h6vhtk-0594a0
- Ends · in 62 days
Darrenlas Primary WC Refurb 2026
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: V3 Facilities Management Limited
Darrenlas Primary WC Refurb 2026
- Published value
- £395k
- Annual run-rate
- £703kpublished value ÷ term, exc. VAT
- Term
- 10 Jun 2026 → 31 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-06b451
- Ends · in 62 days
Fire Strategy Improvements - Batch 17
Bath & North East Somerset Council · Local authority · South West England
Incumbent: NKS Contracts Limited
The Provision of Fire Strategy Improvements for 17no. Batch D Properties. Tendered sum ££369,445.26 exc vat
- Published value
- £369k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 31 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06e4bc
- Ends · in 62 days
St Day & Carharrack Community School - SEND Programme
Cornwall Council · Local authority · Nationwide (UK)
Incumbent: Cygnus Contracting Ltd
St Day & Carharrack Community School - SEND Expansion Programme 2026
- Published value
- £354k
- Annual run-rate
- —term under 6 months
- Term
- 19 Aug 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-0781e9
- Ends · in 62 days
PCH Roof Sealant Replacement
Corporate Officer of the House of Commons · Central government · Greater London
Incumbent: Saltash Construction
Repair works to the sealant of the roof in Portcullis House.
- Published value
- £313k
- Annual run-rate
- £407kpublished value ÷ term, exc. VAT
- Term
- 26 Mar 2026 → 31 Dec 2026 · 9 months
- Reference
ocds-h6vhtk-068527
- Ends · in 62 days
Tillingbourne to Good (Shalford Mill fish passage)
ENVIRONMENT AGENCY · Other public body · South East England
Incumbent: Environment Agency
The improvement of fish passage along the Tillingbourne river corridor.
- Published value
- £300k
- Annual run-rate
- £368kpublished value ÷ term, exc. VAT
- Term
- 9 Mar 2026 → 31 Dec 2026 · 10 months
- Reference
ocds-h6vhtk-068fd3
- Ends · in 62 days
-Vantive Water Treatment Plant – Installation, Commissioning
Imperial College Healthcare NHS Trust · Central government
Incumbent: Vantive Limited
Supply, installation, commissioning and handover of supporting equipment and infrastructure for the Vantive CWP800 reverse-osmosis water treatment system at Northwick Park Hospital, supporting the renal dialysis service. The works include a…
- Published value
- £289k
- Annual run-rate
- —term under 6 months
- Term
- 1 Dec 2026 → 31 Dec 2026 · 31 days
- Reference
ocds-h6vhtk-078a69
- Ends · in 62 daysExtension option · up to 30 Jun 2027
CAR PARK REPAIRS - WHARF ROAD ALL LEVELS
South Kesteven District Council · Local authority · East Midlands
Incumbent: KILNBRIDGE STRUCTURAL SERVICES LTD · Last contest: awarded 11% under the estimate
The works consist of redecoration and sundry remedial repair works to all Levels of the Wharf Road car park to satisfy dilapidation obligations. The car park will generally remain in operation during the works. Particular attention is to be…
- Published value
- £267k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 31 Dec 2026 · 5 months · up to 30 Jun 2027 with extensions
- Reference
ocds-h6vhtk-067223
- Ends · in 62 daysExtension option · up to 30 Jun 2027
BAS - Essential Electrical Upgrade works
UK Research and Innovation · Central government · East of England
Incumbent: Leeton Electrical Ltd
UKRI has appointed a supplier for the provision of Essential Electrical Upgrade works to the BAS site.
- Published value
- £266k
- Annual run-rate
- £503kpublished value ÷ term, exc. VAT
- Term
- 22 Jun 2026 → 31 Dec 2026 · 6 months · up to 30 Jun 2027 with extensions
- Reference
ocds-h6vhtk-06b91e
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,848 contracts and agreements end within 24 months, 4,753 in total · £33bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services9,88479Business services: law, marketing, consulting5,55460Transport services (except waste transport)4,94245Construction work4,75350Repair and maintenance services3,70672IT services: consulting, software, internet3,49071Architectural, construction, engineering3,30680Education and training services2,867
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.