Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the all future end dates

Showing 60,551–60,560

60,865 contracts

  1. Ends · in 4,426 days

    Bus Shelters Provision, Maintenance and Advertising

    Fylde Borough Council · Local authority · North West England

    Incumbent: Clear Channel UK Ltd · Last contest: 3 bids · awarded 46% under the estimate

    The Council are inviting bids from service providers to supply, install, maintain and sell advertising on our bus shelters within the borough.

    • Advertising services
    Published value
    £1.1m
    Annual run-rate
    —start date not published
    Term
    Ends 10 Dec 2038 · start not published
    Reference
    ocds-h6vhtk-03e134
  2. Estimated end · in 4,431 days

    Integrated Recycling, Waste Collection and Street Cleansing Contract

    London Borough of Havering · Local authority · Greater London

    Incumbent: Urbaser Ltd · Last contest: 3 bids · awarded 1% over the estimate

    The services under the Contract will include waste collection and recycling services, cleansing services, and other supporting services. The Contractor will provide the following services in the delivery of the Contract: a) Waste Collection…

    • Sewage, refuse, cleaning and environmental services
    Published value
    £178m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Dec 2038 · start not published
    Reference
    ocds-h6vhtk-02dfb5
  3. Estimated end · in 4,442 days

    CO Construction – LT374 Shetland to Blackhillock HVDC Converter Technology - Multi Site 05/33 (Reference no. 37030)

    Scottish Hydro Electric Transmission Plc · Nationwide (UK)

    Incumbent not published

    Call off contract for two 2GW High Voltage Direct Current (HVDC) Voltage Sourced Converter Stations associated with the Shetland 2 HVDC Link

    • Construction work
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 26 Dec 2038 · start not published
    Reference
    ocds-h6vhtk-03737c
  4. Estimated end · in 4,448 days

    Automated Large-Scale Ultra-Low Temperature Biological Sample Archive

    UK Biobank Ltd · North West England

    Incumbent: Hamilton Storage GmbH · Last contest: 3 bids (2 SME) · awarded 9% under the estimate

    UK Biobank (UKB) is a registered UK charity and is a large-scale biomedical database and research resource containing genetic, lifestyle and health information from half a million UK participants. UKB is responsible for the safe preservatio…

    • Industrial freezers
    Published value
    £27m
    Annual run-rate
    —start date not published
    Term
    Estimated end 1 Jan 2039 · start not published
    Reference
    ocds-h6vhtk-036a2a
  5. Estimated end · in 4,449 days

    Housing Stock Reactive, Cyclical and Planned Repairs and Maintenance

    North Kesteven District Council · Local authority · East Midlands

    Incumbent: IAN WILLIAMS · Last contest: 5 bids (2 SME) · awarded at the estimate

    North Kesteven District Council requires the provision of the following services in respect of their housing stock. • Call handling, tenant liaison and provision of repairs / maintenance reporting and tracking system • Pre-Repair Inspection…

    • Construction work
    Published value
    £75m
    Annual run-rate
    —start date not published
    Term
    Estimated end 2 Jan 2039 · start not published
    Reference
    ocds-h6vhtk-03d5c8
  6. Estimated end · in 4,456 days

    Vessel Traffic Service (VTS) System Tender

    BELFAST HARBOUR COMMISSIONERS · Northern Ireland

    Incumbent not published

    This contract relates to the supply of a Vessel Traffic Services (VTS) system (software and any necessary supporting hardware, e.g. Radar, AIS, VHF Radio, Environmental Sensors, Device Communications, Network connectivity, Server based infr…

    • Industry specific software package
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 9 Jan 2039 · start not published
    Reference
    ocds-h6vhtk-03c20f
  7. Estimated end · in 4,456 days

    Essex Waste Management Partnership Residual Waste Treatment Contract

    Essex County Council · Local authority · East of England

    Incumbent: UBB Waste (Essex) Limited

    • Refuse disposal and treatment
    Published value
    £810m
    Annual run-rate
    —start date not published
    Term
    Estimated end 9 Jan 2039 · start not published
    Reference
    ocds-h6vhtk-032282
  8. Estimated end · in 4,457 daysFramework recordPanel · 7 suppliers

    DV4 Enterprise

    Scottish Water · Scotland

    Panel: AECOM LIMITED, Farrans Limited, Morrison Water Services Limited +4 more

    • Engineering works and construction works
    Published value
    £9.0bnpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 Jan 2039 · start not published
    Reference
    ocds-h6vhtk-04be95
  9. Estimated end · in 4,459 days

    TfL 95052 Bollo Lane Opportunity

    Places for London Limited · Greater London

    Incumbent: BDW Trading · Last contest: 2 bids

    • Development services of real estate
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 12 Jan 2039 · start not published
    Reference
    ocds-h6vhtk-02ffb6
  10. Ends · in 4,480 days

    Renal Dialysis Clinical Services

    Gloucestershire Hospitals NHS Foundation Trust · NHS & health · South West England

    Incumbent: Diaverum UK Limited

    • Hospital dialysis services
    Published value
    £31m
    Annual run-rate
    £2.4mpublished value ÷ term, exc. VAT
    Term
    3 Dec 2025 → 2 Feb 2039 · 13.2 yrs
    Reference
    ocds-h6vhtk-0655b7

When contracts end
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

38,347 contracts and agreements end within 24 months, 60,865 in total · £224bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months5,763
  2. 3–6 months8,139
  3. 6–12 months10,132
  4. 12–24 months14,313

Top sectors, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown; 59,658 of 60,865 contracts ending in this window carry a sector classification.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.