Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 226–250
- Ends · in 6 days
Chalk Ridge Primary School - Main Switchgear and Sub-main DB upgrade
Hampshire County Council · Local authority · South East England
Incumbent: A.J. TAYLOR ELECTRICAL CONTRACTORS LIMITED
Upgrade of the main distribution board and sub-distribution boards while maintaining continuity of supply to existing essential services.
- Published value
- £30k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 2 Nov 2026 · 8 days
- Reference
ocds-h6vhtk-0789f2
- Ends · in 6 days
GL/FEL YCS/25-26/071/AWR-E - DUNLIN LAUNDRY ITT
Gov Facility Services Ltd · Other public body · Greater London
Incumbent: RAVENSTONE CENTRAL LTD
Remove existing showers and supply & fix electrics and ventilation for new laundry.
- Published value
- £26k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 2 Nov 2026 · 29 days
- Reference
ocds-h6vhtk-077446
- Estimated end · in 7 days
Sirinham Point - Replacement of Glazed Rainscreen
Metropolitan Housing Trust · Housing · Greater London
Incumbent: PiLON Ltd · Last contest: 2 bids · awarded 57% over the estimate
remove Glazing and frame to plant room at roof level and replace with Blockwork. Design and build with Gateway 2 Submission Required.
- Published value
- £235k
- Annual run-rate
- —start date not published
- Term
- Estimated end 3 Nov 2026 · start not published
- Reference
ocds-h6vhtk-04c204
- Ends · in 7 days
Brackmills Industrial Estate - Unit 29 Refurbishment
Tameside Metropolitan Borough Council · Local authority · North West England
Incumbent: PEXHURST SERVICES LIMITED
GMPF on behalf of SCRE Services Limited are seeking a suitable contractor to carry out the refurbishment of existing Brackmills Industrial Unit to include the following: Internal re-configuration De-gassing Installation of EV charging point…
- Published value
- £422k
- Annual run-rate
- —term under 6 months
- Term
- 14 Aug 2026 → 3 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06dfc2
- Ends · in 7 days
Whiteley Primary School - Replace Hall Radiators for Fan Convectors - Phase 1
Hampshire County Council · Local authority · South East England
Incumbent: Appledown Projects Ltd
Replacement of Hall heating system including new fan convectors and associated pipework circuit and pump replacement.
- Published value
- £39k
- Annual run-rate
- —term under 6 months
- Term
- 23 Oct 2026 → 3 Nov 2026 · 12 days
- Reference
ocds-h6vhtk-0789fb
- Estimated end · in 8 days
Bronllwyn Adult Care Development
Rhondda Cynon Taf CBC · Wales (Cymru)
Incumbent: LANGSTONE CONSTRUCTION GROUP LTD · Last contest: 4 bids (4 SME)
The proposed scheme, Bronllwyn Care Home, comprises of the design & construction of the 14nr bed adult care facility together with all associated external works, drainage works, service connections, including any adoptions required to provi…
- Published value
- £7.8m
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-041d0e
- Estimated end · in 8 days
DH20043 - Painting & Decorating Contract
Derby Homes Ltd · East Midlands
Incumbent: Buxton Decorators · Last contest: 12 bids (7 SME) · awarded 7% under the estimate
Derby Homes contract for Painting & Decorating to new build, void properties, the Derby Homes one room decoration scheme and other associated works
- Published value
- £2.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02d5c7
- Estimated end · in 8 days
Shrub Hill - Isaac Maddox House - Phase 2 Refurbishment Works
Worcestershire County Council · Local authority · West Midlands
Incumbent: Speller Metcalfe Ltd. · Last contest: 2 bids (0 SME)
The refurbishment of Isaac Maddox House, and office building in Shrub Hill, Worcester.As part of the Shrub Hill Industrial Estate development the Council is seeking a Construction contractor to complete the deign and carry out the refurbish…
- Published value
- £191k
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-046f10
- Ends · in 8 daysExtension option · up to 31 Dec 2026
Onchan Park - Development
Gedling Borough Council · Local authority · East Midlands
Incumbent: Biba's Landscapes Limited
The contract will be for the construction of an amenity green space suitable for general recreational use; converting a previous bowling green into a community amenity green space with full disability access and egress, safety improvements,…
- Published value
- £88k
- Annual run-rate
- —term under 6 months
- Term
- 30 Sept 2026 → 4 Nov 2026 · 36 days · up to 31 Dec 2026 with extensions
- Reference
ocds-h6vhtk-077eee
- Estimated end · in 9 daysFramework recordPanel · 24 suppliers
PfH Scotland EESSH2 Framework
Procurement for Housing · Scotland
Panel: A.C. Whyte & Co. Ltd., BRB Electrical Limited, British Gas Social Housing Ltd trading as PH Jones +21 more
- Published value
- £300mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 5 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02aa91
- Estimated end · in 9 days
Lift Maintenance Services
Accent Group Ltd · North East England, North West England, Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: ORONA LIMITED · Last contest: 8 bids
Contract Award following an open competition for Lift maintenance services to Accent Housing Ltd providing national coverage to its schemes and homes. Accent Housing Ltd (Accent) are seeking the services of one Contractor to support deliver…
- Published value
- £306k
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02c318
- Estimated end · in 9 days
Contract
The Education Authority · Education · Northern Ireland
Incumbent: Bell Contracts · Last contest: 17 bids (1 SME) · awarded 7% over the estimate
Appointment of Integrated Supply Team for the construction of new 8 class primary school on existing extended site. The project will include full construction works, mechanical and electrical services, external and site development works.
Re-procurement plannedAppointment of Integrated Supply Team for Iveagh Primary School · tender expected
- Published value
- £5.6m
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Nov 2026 · start not published
- Reference
ocds-h6vhtk-047933
- Ends · in 9 days
RBC Empty Acquisitions Phase 3
Rochdale Borough Council · Local authority · North West England
Incumbent: F.S.Moult & Son
Rochdale Borough Council are seeking to procure a contractor to carry out the refurbishment of 3 residential properties based throughout the Borough of Rochdale. The procurement will award the contract for all properties as one. Each proper…
- Published value
- £260k
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 5 Nov 2026 · 4 months
- Reference
ocds-h6vhtk-06d3e6
- Ends · in 9 days
The Orchard External Play Area
St Helens Council · Local authority · North West England
Incumbent: JOHN WADE GROUNDWORKS LIMITED
For the refurbishment of the outdoor play area at The Orchard (Burnage Avenue)
- Published value
- £148k
- Annual run-rate
- —term under 6 months
- Term
- 11 Oct 2026 → 5 Nov 2026 · 26 days
- Reference
ocds-h6vhtk-078431
- Ends · in 9 days
Roofing
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: James Roofing & Construction Ltd
Supply and install a pitched roof to the museum, including an allowance for scaffolding. Although the windows are to be supplied by others, you are responsible for coordinating the associated works. Supply and install Flat roof above the de…
- Published value
- £140k
- Annual run-rate
- £140kpublished value ÷ term, exc. VAT
- Term
- 6 Nov 2025 → 5 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-05dd43
- Ends · in 9 days
Multi Use Games Area ( MUGA) Improvement Project
Mere Town Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Axo Leisure Ltd
Proposals that will improve the quality durability and accessibility and flexibility of the existing facility whilst ensuring the space continues to meet the recreational needs of the community
- Published value
- £100k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 5 Nov 2026 · 32 days
- Reference
ocds-h6vhtk-06f4c2
- Ends · in 9 days
Walls & Ceilings
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Mosaic Property Management Ltd
Wall & Ceiling to be primed and rubbed down in preparation for painting. All rooms are to be painted with two coats of white emulsion.
- Published value
- £68k
- Annual run-rate
- £68kpublished value ÷ term, exc. VAT
- Term
- 6 Nov 2025 → 5 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-05dd41
- Ends · in 9 days
Ceilings
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Mosaic Property Management Ltd
The supply and installation of 10 mm plywood to ceilings along with 4" x 2" brackets to a cloud design, is required for all offices on the Gr. Floor The installation of covers, strips and two coats of paint is also necessary. Finally, 200 m…
- Published value
- £68k
- Annual run-rate
- £68kpublished value ÷ term, exc. VAT
- Term
- 6 Nov 2025 → 5 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-05dd44
- Ends · in 9 days
Leadenhall Market Drainage Survey and Climate Resilience
The Mayor and Commonalty and Citizens of the City of London · Local authority
Incumbent: Aquaflow Drainage Services Limited
Leadenhall Market Drainage Survey and Climate Resilience - Direct Award
- Published value
- £44kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 13 Oct 2026 → 5 Nov 2026 · 24 days
- Reference
ocds-h6vhtk-07909f
- Ends · in 9 days
Steel Fabrication
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: MS Metal Fabrications Ltd
Steel Fabrication for lift support
- Published value
- £18k
- Annual run-rate
- £19kpublished value ÷ term, exc. VAT
- Term
- 6 Nov 2025 → 5 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-05dd62
- Estimated end · in 10 days
Lift and Lay of Floor Coverings
East Ayrshire Council · Local authority · Scotland
Incumbent: Ian Logan Carpets Ltd · Last contest: 2 bids (1 SME)
Lift and Lay of Floor Coverings
- Published value
- £300k
- Annual run-rate
- —start date not published
- Term
- Estimated end 6 Nov 2026 · start not published
- Reference
ocds-h6vhtk-03fc8a
- Ends · in 10 days
Roof Renewal & External Decorations Ph.1 at Nightingale Square
London Borough of Wandsworth · Local authority
Incumbent: Accurate Roofing Ltd
Roof Renewal & External Decoration at Nightingale Square, Wandsworth
- Published value
- £993k
- Annual run-rate
- —term under 6 months
- Term
- 22 Jun 2026 → 6 Nov 2026 · 5 months
- Reference
ocds-h6vhtk-06987f
- Ends · in 10 days
Roof Renewal & External Decorations Ph.1 at Nightingale Square
London Borough of Wandsworth · Local authority
Incumbent: Accurate Roofing Ltd
Roof Renewal & External Decoration at Nightingale Square, Wandsworth
- Published value
- £993k
- Annual run-rate
- —term under 6 months
- Term
- 22 Jun 2026 → 6 Nov 2026 · 5 months
- Reference
ocds-h6vhtk-069880
- Ends · in 10 days
Old North Pier Repair Works
Sunderland City Council · Local authority · North East England
Incumbent: ARM Pipetek Ltd,
Repairs to storm damage pier including: Filling of voids Concrete Repair of Steps and step access Relocation of Rock Armour Construction of sea wall Repointing works:
- Published value
- £519k
- Annual run-rate
- —term under 6 months
- Term
- 1 Jun 2026 → 6 Nov 2026 · 5 months
- Reference
ocds-h6vhtk-06a233
- Ends · in 10 days
Hamble Primary School - SEND RP
Hampshire County Council · Local authority · South East England
Incumbent: Spetisbury Construction
The project is to create a new Resource Provision for SEND pupils. The project is to carry out internal alterations of an existing double modular classroom. Internally, there will be new stud walls, new doors, new floor finishes, new suspen…
- Published value
- £366k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 6 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06e774
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.