Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,241–1,250

  1. Ends · in 294 daysExtension option · up to 18 Aug 2028

    Services

    Swindon Borough Council · Local authority · South West England

    Incumbent: GLEEDS LLP

    Contract award for the provision of quantity surveying and contract management services related to a Community Sports Hub in Wichelstowe, Swindon. Project Description The services will include cost plan, value engineering, quantity survey a…

    Published value
    £44k
    Annual run-rate
    £29kpublished value ÷ term, exc. VAT
    Term
    9 Feb 2026 → 18 Aug 2027 · 1.5 yrs · up to 18 Aug 2028 with extensions
    Reference
    ocds-h6vhtk-0659d2
  2. Ends · in 295 daysExtension option · up to 19 Aug 2028

    CONTRACT FOR THE PROVISION OF BUILDING SURVEY SERVICES

    South Oxfordshire District Council · Local authority · South East England

    Incumbent: VERULAM PROPERTY SURVEYORS LLP · Last contest: awarded at the estimate

    South Oxfordshire District Council is looking to acquire up to 30 properties ranging from 1, 2, 3 and 4 bedrooms. Vale of White Horse District Council is looking to acquire up to 8 properties ranging from 1 and 2 bedrooms. This is to includ…

    Published value
    £61k
    Annual run-rate
    £31kpublished value ÷ term, exc. VAT
    Term
    27 Aug 2025 → 19 Aug 2027 · 2 yrs · up to 19 Aug 2028 with extensions
    Reference
    ocds-h6vhtk-0544ea
  3. Estimated end · in 296 daysCall-off

    FW Repair & Maintain - 11kV Switchgear and Automation - Multi Site 0926

    SOUTHERN ELECTRIC POWER DISTRIBUTION PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: PSS Power Engineering Ltd · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 20 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-02874b
  4. Estimated end · in 297 days

    Highway Winter Service Weather Forecast for South West Consortium

    Devon County Council · Local authority · South West England

    Incumbent: MetDesk Ltd · Last contest: 2 bids (1 SME)

    A South West Consortium has been formed for the purposes of procuring and Weather Forecasting Service. The road weather forecast service is required so that they can deliver an effective and efficient Winter Service and Highway Maintenance …

    • Weather-forecasting services
    Published value
    £800k
    Annual run-rate
    —start date not published
    Term
    Estimated end 21 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03d839
  5. Estimated end · in 298 daysCall-off

    Design Services, RIBA Stage 3 Call Off

    Scottish Hydro Electric Transmission Plc · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 22 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-02874b
  6. Ends · in 299 daysExtension option · up to 22 Jan 2028

    Stadium Island Wider Development Opportunity LS086 - Architect Led Design Team

    London Legacy Development Corporation · Other public body

    Incumbent: Populous Limited

    London Stadium is commissioning an Architect-led Design Team to develop spatial proposals to create a leisure-led, mixed-use destination on Stadium Island, drawing on an existing feasibility study. The Lead Consultant and their Design Team …

    Published value
    £248kinc. VAT as published
    Annual run-rate
    £249kpublished value ÷ term, inc. VAT
    Term
    25 Aug 2026 → 23 Aug 2027 · 1 yr · up to 22 Jan 2028 with extensions
    Reference
    ocds-h6vhtk-0775cb
  7. Ends · in 299 daysExtension option · up to 23 Aug 2031

    Tree Surveying and Data Capture Services

    Connexus Homes Limited · Other public body · West Midlands

    Incumbent: Glendale Countryside Limited

    The aim of this tender is to appoint a single tree surveying company to inspect all of Connexus’ Trees across Shropshire and Herefordshire including trees in our tenant’s gardens. The rationale of the tree survey is to not only to maintain …

    Published value
    £42kinc. VAT as published
    Annual run-rate
    £42kpublished value ÷ term, inc. VAT
    Term
    24 Aug 2026 → 23 Aug 2027 · 1 yr · up to 23 Aug 2031 with extensions
    Reference
    ocds-h6vhtk-06b675
  8. Estimated end · in 300 daysFramework record

    Football Foundation PlayZones Framework (Framework Managing Consultant)

    Football Foundation · North East England, North West England, East Midlands, West Midlands, East of England, South East England

    Incumbent: EDGEPS LIMITED

    • Construction consultancy services
    Published value
    £5.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 24 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03ac90
  9. Ends · in 300 daysExtension option · up to 24 Aug 2029

    Tree Surveying & Assessment Services for Karbon Homes

    Karbon Homes · Charity · Nationwide (UK), North East England, Yorkshire and the Humber

    Incumbent: Dryad Tree Specialists Ltd

    Contractor to deliver an Estate Wide Tree Survey and Arboricultural Inspections and Assessments.

    Published value
    £215kinc. VAT as published
    Annual run-rate
    £107kpublished value ÷ term, inc. VAT
    Term
    25 Aug 2025 → 24 Aug 2027 · 2 yrs · up to 24 Aug 2029 with extensions
    Reference
    ocds-h6vhtk-050ebb
  10. Ends · in 300 days

    Livesey Hall Footbridge PTSI Post Tensioned Inspection

    Blackburn With Darwen Borough Council · Local authority · North West England

    Incumbent: Pell Frischmann Consultants Ltd

    Livesey Hall Rail Bridge is a council owned footbridge comprising a post tensioned concrete main beam structure spanning the railway near Cherry Tree, Pleasington. Livesey Hall Rail Bridge is regularly inspected visually from the surface ho…

    Published value
    £61k
    Annual run-rate
    £61kpublished value ÷ term, exc. VAT
    Term
    25 Aug 2026 → 24 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-06eb90

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,296 contracts and agreements end within 24 months, 3,304 in total · £791m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months396
  2. 3–6 months495
  3. 6–12 months530
  4. 12–24 months875

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.