Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,361–1,370

  1. Estimated end · in 339 days

    BMS, Bureau Service and Planned Preventative Maintenance (PPM)

    Renfrewshire Council · Local authority · Scotland

    Incumbent: Affiniti Response Limited · Last contest: 3 bids (3 SME)

    The Contract is for a Contractor to provide a Building Management System (BMS) and Bureau Service, condition surveys, integration of existing systems with the Councils IT network, creation of an energy dashboard, creation of floorplans, jan…

    • Architectural, construction, engineering and inspection services
    Published value
    £1.6m
    Annual run-rate
    —start date not published
    Term
    Estimated end 1 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-044bbf
  2. Estimated end · in 339 days

    Planned Preventative Maintenance, Servicing and Reactive (Un-Planned) Maintenance to Sheltered Housing Buildings Heating Systems

    Renfrewshire Council · Local authority · Scotland

    Incumbent: Alba Facilities Services Ltd · Last contest: 3 bids (3 SME) · awarded at the estimate

    Renfrewshire Council has the requirement to appoint a suitably qualified Contractor to carry out the Planned Preventive Maintenance and Reactive Repairs to the communal heating systems within seven sheltered housing complexes.

    • Heating engineering services for buildings
    Published value
    £700k
    Annual run-rate
    —start date not published
    Term
    Estimated end 1 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-047027
  3. Estimated end · in 339 daysCall-off

    Refurbishment of South East Coast Ambulance Service NHS Foundation Trust Headquarters at Nexus House, Crawley

    South East Coast Ambulance Service NHS Foundation Trust · NHS & health · Nationwide (UK), South East England

    Incumbent: RIDGE AND PARTNERS LLP · Last contest: 4 bids (2 SME)

    Support the incumbent programme manager to deliver a Headquarters refurbishment programme in Crawley and running a further competition with those suppliers appointed to all 4 Lots of the Professional Services Construction Consultancy Framew…

    • Construction consultancy services
    Published value
    £119kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 1 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-02b6bd
  4. Ends · in 339 daysFramework record

    Built Environment Professional Services 2 Framework (BEPS2)

    Cornwall Council · Local authority · South West England

    Incumbent: Arcadis

    • Architectural, construction, engineering and inspection services
    Published value
    £100mlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 1 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03c559
  5. Ends · in 339 days

    STDC-PROC-0576 - Park & Ride Inspection Fees

    Tees Valley Combined Authority · Local authority · North East England

    Incumbent: Redcar & Cleveland Borough Council

    Section 38-278 Inspection Fees for Park & Ride Legal Costs for Section 38-278

    Published value
    £194k
    Annual run-rate
    £110kpublished value ÷ term, exc. VAT
    Term
    23 Dec 2025 → 1 Oct 2027 · 1.8 yrs
    Reference
    ocds-h6vhtk-05f2af
  6. Ends · in 339 daysExtension option · up to 31 Dec 2027

    Architect Services - Millcross (721-AHL)

    NSAH (Alliance Homes) Ltd · Other public body

    Incumbent: Atkins Walters & Webster Limited

    Procurement for the provision of Architect and Principal Designer services in relation to our Millcross development. All details are provided in the documents attached to this project. The tender return deadline is noon 30/03/2026. Please n…

    Published value
    £47kinc. VAT as published
    Annual run-rate
    £37kpublished value ÷ term, inc. VAT
    Term
    1 Jul 2026 → 1 Oct 2027 · 1.3 yrs · up to 31 Dec 2027 with extensions
    Reference
    ocds-h6vhtk-06bfba
  7. Ends · in 339 days

    Woodbury Unit Alterations

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: Freeman Ankerman Partnership Limited

    Measured survey of the project area Development of the approved Stage 2 capacity-led option into a coordinated RIBA Stage 4 Technical Design. Preparation of architectural drawings and technical information suitable for Building Regulations …

    Published value
    £11k
    Annual run-rate
    £11kpublished value ÷ term, exc. VAT
    Term
    2 Oct 2026 → 1 Oct 2027 · 1 yr
    Reference
    ocds-h6vhtk-077f98
  8. Estimated end · in 340 daysFramework recordPanel · 37 suppliers

    Carmarthenshire Construction Professional Services Framework

    Carmarthenshire County Council · Local authority · Wales (Cymru)

    Panel: AHR Architects Ltd, Asbri Planning, Austin-Smith:Lord Ltd +34 more

    • Architectural, construction, engineering and inspection services

    Re-procurement plannedCarmarthenshire Construction Professional Services Framework · tender expected

    Published value
    £15mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 2 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-038647
  9. Ends · in 342 daysExtension option · up to 4 Oct 2029

    In-Service Support for Ultrasonic NDT Equipment

    Defence Equipment and Support · Central government · Nationwide (UK)

    Incumbent: Evident Europe GMBH

    DE&S Deca, on behalf of the Air Commodities Delivery Team and part of the UK Ministry of Defence (The Authority) Intends to Direct award a contract to Evident Europe GMBH to provide In service Support (ISS) the Epoch 600 Ultrasonic Flaw Det…

    Published value
    £130k
    Annual run-rate
    £130kpublished value ÷ term, exc. VAT
    Term
    5 Oct 2026 → 4 Oct 2027 · 1 yr · up to 4 Oct 2029 with extensions
    Reference
    ocds-h6vhtk-06dcaf
  10. Estimated end · in 343 daysFramework recordPanel · 3 suppliers

    Energy Efficiency and Carbon Reduction Services

    West Yorkshire Combined Authority · Local authority · Yorkshire and the Humber

    Panel: Cenergist Limited, Equans Regeneration Ltd, Yorkshire Energy Services CIC T/A YES Energy Solutions

    • Architectural, construction, engineering and inspection services
    Published value
    £200mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 5 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-039223

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months395
  2. 3–6 months489
  3. 6–12 months529
  4. 12–24 months872

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.