Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,361–1,370
- Estimated end · in 339 days
BMS, Bureau Service and Planned Preventative Maintenance (PPM)
Renfrewshire Council · Local authority · Scotland
Incumbent: Affiniti Response Limited · Last contest: 3 bids (3 SME)
The Contract is for a Contractor to provide a Building Management System (BMS) and Bureau Service, condition surveys, integration of existing systems with the Councils IT network, creation of an energy dashboard, creation of floorplans, jan…
- Published value
- £1.6m
- Annual run-rate
- —start date not published
- Term
- Estimated end 1 Oct 2027 · start not published
- Reference
ocds-h6vhtk-044bbf
- Estimated end · in 339 days
Planned Preventative Maintenance, Servicing and Reactive (Un-Planned) Maintenance to Sheltered Housing Buildings Heating Systems
Renfrewshire Council · Local authority · Scotland
Incumbent: Alba Facilities Services Ltd · Last contest: 3 bids (3 SME) · awarded at the estimate
Renfrewshire Council has the requirement to appoint a suitably qualified Contractor to carry out the Planned Preventive Maintenance and Reactive Repairs to the communal heating systems within seven sheltered housing complexes.
- Published value
- £700k
- Annual run-rate
- —start date not published
- Term
- Estimated end 1 Oct 2027 · start not published
- Reference
ocds-h6vhtk-047027
- Estimated end · in 339 daysCall-off
Refurbishment of South East Coast Ambulance Service NHS Foundation Trust Headquarters at Nexus House, Crawley
South East Coast Ambulance Service NHS Foundation Trust · NHS & health · Nationwide (UK), South East England
Incumbent: RIDGE AND PARTNERS LLP · Last contest: 4 bids (2 SME)
Support the incumbent programme manager to deliver a Headquarters refurbishment programme in Crawley and running a further competition with those suppliers appointed to all 4 Lots of the Professional Services Construction Consultancy Framew…
- Published value
- £119kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 1 Oct 2027 · start not published
- Reference
ocds-h6vhtk-02b6bd
- Ends · in 339 daysFramework record
Built Environment Professional Services 2 Framework (BEPS2)
Cornwall Council · Local authority · South West England
Incumbent: Arcadis
- Published value
- £100mlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 1 Oct 2027 · start not published
- Reference
ocds-h6vhtk-03c559
- Ends · in 339 days
STDC-PROC-0576 - Park & Ride Inspection Fees
Tees Valley Combined Authority · Local authority · North East England
Incumbent: Redcar & Cleveland Borough Council
Section 38-278 Inspection Fees for Park & Ride Legal Costs for Section 38-278
- Published value
- £194k
- Annual run-rate
- £110kpublished value ÷ term, exc. VAT
- Term
- 23 Dec 2025 → 1 Oct 2027 · 1.8 yrs
- Reference
ocds-h6vhtk-05f2af
- Ends · in 339 daysExtension option · up to 31 Dec 2027
Architect Services - Millcross (721-AHL)
NSAH (Alliance Homes) Ltd · Other public body
Incumbent: Atkins Walters & Webster Limited
Procurement for the provision of Architect and Principal Designer services in relation to our Millcross development. All details are provided in the documents attached to this project. The tender return deadline is noon 30/03/2026. Please n…
- Published value
- £47kinc. VAT as published
- Annual run-rate
- £37kpublished value ÷ term, inc. VAT
- Term
- 1 Jul 2026 → 1 Oct 2027 · 1.3 yrs · up to 31 Dec 2027 with extensions
- Reference
ocds-h6vhtk-06bfba
- Ends · in 339 days
Woodbury Unit Alterations
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Freeman Ankerman Partnership Limited
Measured survey of the project area Development of the approved Stage 2 capacity-led option into a coordinated RIBA Stage 4 Technical Design. Preparation of architectural drawings and technical information suitable for Building Regulations …
- Published value
- £11k
- Annual run-rate
- £11kpublished value ÷ term, exc. VAT
- Term
- 2 Oct 2026 → 1 Oct 2027 · 1 yr
- Reference
ocds-h6vhtk-077f98
- Estimated end · in 340 daysFramework recordPanel · 37 suppliers
Carmarthenshire Construction Professional Services Framework
Carmarthenshire County Council · Local authority · Wales (Cymru)
Panel: AHR Architects Ltd, Asbri Planning, Austin-Smith:Lord Ltd +34 more
Re-procurement plannedCarmarthenshire Construction Professional Services Framework · tender expected
- Published value
- £15mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 2 Oct 2027 · start not published
- Reference
ocds-h6vhtk-038647
- Ends · in 342 daysExtension option · up to 4 Oct 2029
In-Service Support for Ultrasonic NDT Equipment
Defence Equipment and Support · Central government · Nationwide (UK)
Incumbent: Evident Europe GMBH
DE&S Deca, on behalf of the Air Commodities Delivery Team and part of the UK Ministry of Defence (The Authority) Intends to Direct award a contract to Evident Europe GMBH to provide In service Support (ISS) the Epoch 600 Ultrasonic Flaw Det…
- Published value
- £130k
- Annual run-rate
- £130kpublished value ÷ term, exc. VAT
- Term
- 5 Oct 2026 → 4 Oct 2027 · 1 yr · up to 4 Oct 2029 with extensions
- Reference
ocds-h6vhtk-06dcaf
- Estimated end · in 343 daysFramework recordPanel · 3 suppliers
Energy Efficiency and Carbon Reduction Services
West Yorkshire Combined Authority · Local authority · Yorkshire and the Humber
Panel: Cenergist Limited, Equans Regeneration Ltd, Yorkshire Energy Services CIC T/A YES Energy Solutions
- Published value
- £200mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 5 Oct 2027 · start not published
- Reference
ocds-h6vhtk-039223
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.