Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,391–1,400

  1. Ends · in 353 days

    Technical approval authority services related to the assessment of the concrete arches

    Kingston Upon Hull City Council · Local authority

    Incumbent: Waterman Infrastructure & Environment Ltd

    Kingston upon Hull City Council has appointed Waterman Infrastructure & Environment Limited to provide the professional services for the concrete arches assessments. The opportunity was advertised from YORConsult3 Framework using mini-compe…

    Published value
    £22k
    Annual run-rate
    £11kpublished value ÷ term, exc. VAT
    Term
    15 Oct 2025 → 15 Oct 2027 · 2 yrs
    Reference
    ocds-h6vhtk-05a2b8
  2. Ends · in 353 daysExtension option · up to 14 Apr 2028

    TTDC3064B - Expert Panel Member

    Department for Transport · Central government

    Incumbent: UCL Consultants Limited

    Provide expert review throughout the drafting process of the contract terms and conditions ahead of publication.  To support / assure the work of the delivery partner in delivery of any RCM contract allocation rounds.  Key requirements will…

    Published value
    £96k
    Annual run-rate
    £101kpublished value ÷ term, exc. VAT
    Term
    2 Nov 2026 → 15 Oct 2027 · 11 months · up to 14 Apr 2028 with extensions
    Reference
    ocds-h6vhtk-078bf0
  3. Estimated end · in 354 daysCall-off

    Temporary Agency Workers

    NORTHUMBRIAN WATER LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 16 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-02874b
  4. Estimated end · in 355 daysCall-off

    Framework Contact for the provision of Non Operated Plant

    NORTHERN GAS NETWORKS LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-02874b
  5. Estimated end · in 355 daysCall-off

    Onsite Assembly, Commissioning-36kV Indoor Switchgear

    SSE PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 6 bids (2 SME)

    • Engineering design services
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-02874c
  6. Estimated end · in 355 daysCall-off

    Onsite Assembly, Commissioning-36kV Indoor Switchgear

    SSE PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 6 bids (2 SME)

    • Engineering design services
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-02874c
  7. Estimated end · in 355 daysCall-off

    Supply of Lot 1 Smooth Walled Plastic Ducting to NGED 2024

    NATIONAL GRID ELECTRICITY DISTRIBUTION PLC · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Emtelle UK Ltd · Last contest: 6 bids (2 SME)

    • Engineering design services
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-02874c
  8. Ends · in 356 days

    Barrier Safety Improvement Scheme

    Humber Bridge Board · Other public body · Nationwide (UK), Yorkshire and the Humber

    Incumbent: Beaver Bridges Ltd · Last contest: awarded 17% under the estimate

    The Authority is looking for suitably qualified contractor to undertake a design and build contract (NEC4 ECC) for safety improvement works on the Humber Bridge, comprising: Item 1 - Barrier Safety Improvement Scheme (BSIS): Design and inst…

    Published value
    £4.2m
    Annual run-rate
    £3.4mpublished value ÷ term, exc. VAT
    Term
    27 Jul 2026 → 18 Oct 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-068c1e
  9. Ends · in 356 daysLinked to a framework or DPS

    Humber Bridge Board - Barrier Safety Improvement Scheme (BSIS) Client Support Services, ERPS framework Lot 1c, Kingston upon Hull

    Kingston Upon Hull City Council · Local authority · Yorkshire and the Humber

    Incumbent: Roughan & O'Donovan UK Ltd

    Hull City Council on behalf of the Humber Bridge Board (HBB) has appointed Roughan and O'donovan UK Limited (Company number 11545723) to provide consultancy services for Barrier Safety Improvement Scheme (BSIS) Client Support Services at Ki…

    Published value
    £70kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    28 Jul 2026 → 18 Oct 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-06d4a4
  10. Ends · in 357 daysExtension option · up to 19 Oct 2028

    Architectural Consultant Services

    Stockport NHS Foundation Trust · Central government

    Incumbent: Gilling Dod Limited · Last contest: awarded 39% under the estimate

    Architectural Consultant Services tender

    Published value
    £451k
    Annual run-rate
    £450kpublished value ÷ term, exc. VAT
    Term
    19 Oct 2026 → 19 Oct 2027 · 1 yr · up to 19 Oct 2028 with extensions
    Reference
    ocds-h6vhtk-06a04a

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months395
  2. 3–6 months489
  3. 6–12 months529
  4. 12–24 months872

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.