Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 171–180
- Ends · in 33 days
HSC Heat Mapping Study
London Borough of Hackney · Local authority · Greater London
Incumbent: HP ARCHITECTS LIMITED
To provide a heat mapping modelling study of the HSC. Provide heat gains/loss, air quality and CO2 levels, occupancy and temperature profiles across the year in order to improve the HSC environment. Issue a report of all findings and recomm…
- Published value
- £25k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 30 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06e508
- Ends · in 34 days
Provision of Mechanical & Electrical (M&E) Engineering Services for RIBA Stages 0–3
The Mayor and Commonalty and Citizens of the City of London · Local authority
Incumbent: Frankham Consultancy Group Ltd
Provision of Mechanical & Electrical (M&E) Engineering Consultancy Services for RIBA Stages 0–3 in respect of Bowater House Stanley Cohen House Services form part of Phase 2C of the Golden Lane Estate Investment Programme and include M&E su…
- Published value
- £196kinc. VAT as published
- Annual run-rate
- £171kpublished value ÷ term, inc. VAT
- Term
- 10 Oct 2025 → 1 Dec 2026 · 1.2 yrs
- Reference
ocds-h6vhtk-066b77
- Ends · in 34 days
Appointment and Management of the Multi-Disciplinary Design Team for GYBC Cremator Plant Replacement and Site Expansion
Great Yarmouth Borough Council · Local authority · East of England
Incumbent: Gentoo Project Management Limited
Great Yarmouth Borough Council (GYBC) is seeking a supplier to appoint and manage the multidisciplinary Design Team required for the Cremator Plant Replacement & Site Expansion project at Great Yarmouth Crematorium. The selected supplier wi…
- Published value
- £134k
- Annual run-rate
- £222kpublished value ÷ term, exc. VAT
- Term
- 25 Apr 2026 → 1 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-0669ef
- Ends · in 34 days
Abbey Consols Mine Remediation Project – CE35 Design Review
Natural Resources Wales · Other public body · Wales (Cymru)
Incumbent: WSP UK Limited
Contract Details Notice for Abbey Consols Mine Remediation Project
- Published value
- £69k
- Annual run-rate
- £69kpublished value ÷ term, exc. VAT
- Term
- 1 Dec 2025 → 1 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-065d83
- Ends · in 34 days
Design of Phase 1 of the managed retreat at Cowbar Cottages
Redcar and Cleveland Borough Council · Local authority · North East England
Incumbent: Faithful+Gould
Contract award for the Design of Phase 1 of the managed retreat at Cowbar Cottages Contract procured via a Direct Award via NEPO 212 Support Services for the Built Environment Framework, under Lot 2 - Multi Disciplinary - Highways, Transpor…
- Published value
- £60k
- Annual run-rate
- £48kpublished value ÷ term, exc. VAT
- Term
- 1 Sept 2025 → 1 Dec 2026 · 1.3 yrs
- Reference
ocds-h6vhtk-05f12b
- Ends · in 34 days
Consultancy Services
NPL Management Limited · Other public body · Nationwide (UK)
Incumbent: John Parfitt Nuclear Consultancy Ltd
To provide technical consultancy and expert advice.
- Published value
- £53k
- Annual run-rate
- —term under 6 months
- Term
- 18 Jun 2026 → 1 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06c499
- Ends · in 34 days
St Paul's Court - Consultant Services
Aster Group Limited · Other public body
Incumbent: Kendall Kingscott Limited
1-41 St Paul’s Court is a block of flats comprised of the following address, Torridge Way in Efford, Plymouth, PL3 6JG. As part of Aster group’s ongoing commitment to investing in its properties, St Paul’s Court has been identified as requi…
- Published value
- £50k
- Annual run-rate
- £93kpublished value ÷ term, exc. VAT
- Term
- 20 May 2026 → 1 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06bd07
- Ends · in 34 days
Ground Penetrating Radar for Stockton Town Centre Cycleway
Stockton on Tees Borough Council · Local authority · North East England
Incumbent: THREE60 MAPPING LTD
Stockton Borough Council has been successful in obtaining funding from Tees Valley Combined Authority's Levelling Up Fund, which included an allocation for improvements to the Cycle Network linking areas of Stockton to Stockton Town Centre.…
- Published value
- £46k
- Annual run-rate
- £35kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2025 → 1 Dec 2026 · 1.3 yrs
- Reference
ocds-h6vhtk-056978
- Ends · in 34 days
RDC Bexhill Leisure Centre Architectural Design Services
Rother District Council · Local authority · South East England
Incumbent: A & M Architectural Partnership LLP
RIBA Stage 1 - 4 Architectural design service for landlord improvement works.
- Published value
- £38kinc. VAT as published
- Annual run-rate
- £37kpublished value ÷ term, inc. VAT
- Term
- 19 Nov 2025 → 1 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-05ebf2
- Ends · in 34 days
– SMH Lindo Wing Roof Replacement MEP Design Services
Imperial College Healthcare NHS Trust · Central government
Incumbent: Eta Projects Limited
Provision of MEP design services to support the SMH Lindo Wing roof replacement project, including identification and planning for relocation of pipework, cabling, and pneumatic systems required to enable installation of a new roof membrane…
- Published value
- £38k
- Annual run-rate
- £75kpublished value ÷ term, exc. VAT
- Term
- 1 Jun 2026 → 1 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06b1bb
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,296 contracts and agreements end within 24 months, 3,304 in total · £791m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.