Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 171–180

  1. Ends · in 33 days

    HSC Heat Mapping Study

    London Borough of Hackney · Local authority · Greater London

    Incumbent: HP ARCHITECTS LIMITED

    To provide a heat mapping modelling study of the HSC. Provide heat gains/loss, air quality and CO2 levels, occupancy and temperature profiles across the year in order to improve the HSC environment. Issue a report of all findings and recomm…

    Published value
    £25k
    Annual run-rate
    —term under 6 months
    Term
    1 Sept 2026 → 30 Nov 2026 · 3 months
    Reference
    ocds-h6vhtk-06e508
  2. Ends · in 34 days

    Provision of Mechanical & Electrical (M&E) Engineering Services for RIBA Stages 0–3

    The Mayor and Commonalty and Citizens of the City of London · Local authority

    Incumbent: Frankham Consultancy Group Ltd

    Provision of Mechanical & Electrical (M&E) Engineering Consultancy Services for RIBA Stages 0–3 in respect of Bowater House Stanley Cohen House Services form part of Phase 2C of the Golden Lane Estate Investment Programme and include M&E su…

    Published value
    £196kinc. VAT as published
    Annual run-rate
    £171kpublished value ÷ term, inc. VAT
    Term
    10 Oct 2025 → 1 Dec 2026 · 1.2 yrs
    Reference
    ocds-h6vhtk-066b77
  3. Ends · in 34 days

    Appointment and Management of the Multi-Disciplinary Design Team for GYBC Cremator Plant Replacement and Site Expansion

    Great Yarmouth Borough Council · Local authority · East of England

    Incumbent: Gentoo Project Management Limited

    Great Yarmouth Borough Council (GYBC) is seeking a supplier to appoint and manage the multidisciplinary Design Team required for the Cremator Plant Replacement & Site Expansion project at Great Yarmouth Crematorium. The selected supplier wi…

    Published value
    £134k
    Annual run-rate
    £222kpublished value ÷ term, exc. VAT
    Term
    25 Apr 2026 → 1 Dec 2026 · 7 months
    Reference
    ocds-h6vhtk-0669ef
  4. Ends · in 34 days

    Abbey Consols Mine Remediation Project – CE35 Design Review

    Natural Resources Wales · Other public body · Wales (Cymru)

    Incumbent: WSP UK Limited

    Contract Details Notice for Abbey Consols Mine Remediation Project

    Published value
    £69k
    Annual run-rate
    £69kpublished value ÷ term, exc. VAT
    Term
    1 Dec 2025 → 1 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-065d83
  5. Ends · in 34 days

    Design of Phase 1 of the managed retreat at Cowbar Cottages

    Redcar and Cleveland Borough Council · Local authority · North East England

    Incumbent: Faithful+Gould

    Contract award for the Design of Phase 1 of the managed retreat at Cowbar Cottages Contract procured via a Direct Award via NEPO 212 Support Services for the Built Environment Framework, under Lot 2 - Multi Disciplinary - Highways, Transpor…

    Published value
    £60k
    Annual run-rate
    £48kpublished value ÷ term, exc. VAT
    Term
    1 Sept 2025 → 1 Dec 2026 · 1.3 yrs
    Reference
    ocds-h6vhtk-05f12b
  6. Ends · in 34 days

    Consultancy Services

    NPL Management Limited · Other public body · Nationwide (UK)

    Incumbent: John Parfitt Nuclear Consultancy Ltd

    To provide technical consultancy and expert advice.

    Published value
    £53k
    Annual run-rate
    —term under 6 months
    Term
    18 Jun 2026 → 1 Dec 2026 · 5 months
    Reference
    ocds-h6vhtk-06c499
  7. Ends · in 34 days

    St Paul's Court - Consultant Services

    Aster Group Limited · Other public body

    Incumbent: Kendall Kingscott Limited

    1-41 St Paul’s Court is a block of flats comprised of the following address, Torridge Way in Efford, Plymouth, PL3 6JG. As part of Aster group’s ongoing commitment to investing in its properties, St Paul’s Court has been identified as requi…

    Published value
    £50k
    Annual run-rate
    £93kpublished value ÷ term, exc. VAT
    Term
    20 May 2026 → 1 Dec 2026 · 6 months
    Reference
    ocds-h6vhtk-06bd07
  8. Ends · in 34 days

    Ground Penetrating Radar for Stockton Town Centre Cycleway

    Stockton on Tees Borough Council · Local authority · North East England

    Incumbent: THREE60 MAPPING LTD

    Stockton Borough Council has been successful in obtaining funding from Tees Valley Combined Authority's Levelling Up Fund, which included an allocation for improvements to the Cycle Network linking areas of Stockton to Stockton Town Centre.…

    Published value
    £46k
    Annual run-rate
    £35kpublished value ÷ term, exc. VAT
    Term
    1 Aug 2025 → 1 Dec 2026 · 1.3 yrs
    Reference
    ocds-h6vhtk-056978
  9. Ends · in 34 days

    RDC Bexhill Leisure Centre Architectural Design Services

    Rother District Council · Local authority · South East England

    Incumbent: A & M Architectural Partnership LLP

    RIBA Stage 1 - 4 Architectural design service for landlord improvement works.

    Published value
    £38kinc. VAT as published
    Annual run-rate
    £37kpublished value ÷ term, inc. VAT
    Term
    19 Nov 2025 → 1 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-05ebf2
  10. Ends · in 34 days

    – SMH Lindo Wing Roof Replacement MEP Design Services

    Imperial College Healthcare NHS Trust · Central government

    Incumbent: Eta Projects Limited

    Provision of MEP design services to support the SMH Lindo Wing roof replacement project, including identification and planning for relocation of pipework, cabling, and pneumatic systems required to enable installation of a new roof membrane…

    Published value
    £38k
    Annual run-rate
    £75kpublished value ÷ term, exc. VAT
    Term
    1 Jun 2026 → 1 Dec 2026 · 6 months
    Reference
    ocds-h6vhtk-06b1bb

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,296 contracts and agreements end within 24 months, 3,304 in total · £791m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months396
  2. 3–6 months495
  3. 6–12 months530
  4. 12–24 months875

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.