Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 851–900
- Estimated end · in 74 days
Award Notice - Planned Boiler Replacement Programme & Associated Works
London Borough of Hillingdon · Local authority · Nationwide (UK)
Incumbent: TSG Building Services plc · Last contest: 6 bids · awarded 22% over the estimate
Award Notice. The London Borough of Hillingdon is looking for a suitably qualified contractor to conduct a programme of planned boiler replacements with associated works across a variety of dwellings within the London Borough of Hillingdon.…
- Published value
- £11m
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Jan 2027 · start not published
- Reference
ocds-h6vhtk-034649
- Ends · in 74 days
PLA26055 Bay of Lights 2026 – Ice Rink Provider
Torbay Council · Local authority · South West England
Incumbent: Icescape
Ice rink to be delivered during Bay of Lights event 2026
- Published value
- £173k
- Annual run-rate
- —term under 6 months
- Term
- 9 Sept 2026 → 9 Jan 2027 · 4 months
- Reference
ocds-h6vhtk-077c36
- Ends · in 74 days
Gas Boiler Replacement to Audley & Queens Park Learning Centre
Blackburn With Darwen Borough Council · Local authority · North West England
Incumbent: LANCASHIRE GAS SERVICES LIMITED
Remove in their entirety, the two existing gas fired boilers and install two 120kw Ideal Evo max boilers, c/w shunt pumps and standard height mounting frames at Audley and Queens Park Neighbourhood Learning Centre, as indicated in the speci…
- Published value
- £66k
- Annual run-rate
- —term under 6 months
- Term
- 30 Nov 2026 → 9 Jan 2027 · 41 days
- Reference
ocds-h6vhtk-078fd9
- Ends · in 75 daysPanel · 2 suppliers
Energy Centre for new Leighton Hospital
Mid Cheshire Hospitals NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: SP Manweb, Scottish Power
Provision of an Energy Centre for the New Leighton Hospital in Crewe
- Published value
- £600k
- Annual run-rate
- —panel, not one supplier
- Term
- 24 Apr 2025 → 10 Jan 2027 · 1.8 yrs
- Reference
ocds-h6vhtk-050700
- Ends · in 75 days
Energy Centre for New Leighton Hospital
Mid Cheshire Hospitals NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Scottish Power
Provision of an Energy Centre for the New Leighton Hospital in Crewe
- Published value
- £600k
- Annual run-rate
- £325kpublished value ÷ term, exc. VAT
- Term
- 8 Mar 2025 → 10 Jan 2027 · 1.8 yrs
- Reference
ocds-h6vhtk-050700
- Ends · in 75 days
Kibble Bank - Roofing Package Works
RING STONES MAINTENANCE AND CONSTRUCTION LIMITED · Other public body · North West England
Incumbent: R.L.LOVATT LIMITED
Roofing package works comprising the re-roofing of 60 properties at Kibble Bank.
- Published value
- £306kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 10 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-078e7c
- Ends · in 75 days
Voids Refurbishment Works and Services
BD Group · Other public body · Greater London
Incumbent: T.E.B. (Builders) Limited
Voids Refurbishment Works and Services relating to a project at properties within the London Borough of Barking & Dagenham.
- Published value
- £200k
- Annual run-rate
- —term under 6 months
- Term
- 10 Oct 2026 → 10 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-077fa5
- Estimated end · in 76 daysFramework recordPanel · 6 suppliers
West Midlands Metro Framework Agreement relating to the provision of Diversionary Utilities Works for Metro extensions or any Major Highways Schemes
West Midlands Combined Authority · Local authority · West Midlands
Panel: Amelio Utilities Ltd, Barhale Ltd, CPC CIVILS LIMITED +3 more
- Published value
- £30mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 11 Jan 2027 · start not published
- Reference
ocds-h6vhtk-03293d
- Ends · in 76 days
RAWTENSTALL MARKET REFURBISHMENT
Rossendale Borough Council · Local authority · North West England
Incumbent: P Casey & Co. Limited
The scheme involves a comprehensive modernization and refurbishment of Rawtenstall Market Hall to create a vibrant, contemporary space for traders and the community. Key elements include: Installation of a new roof for structural integrity …
- Published value
- £4.0m
- Annual run-rate
- £4.0mpublished value ÷ term, exc. VAT
- Term
- 12 Jan 2026 → 11 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-05d621
- Ends · in 76 daysExtension option · up to 11 Jan 2029
London Chest Hospital Phase 0 - Demolition
Bonner Road LLP · Other public body
Incumbent: Erith Contractors Ltd
Demolition of ancillary buildings at former London Chest Hospital in North London.
- Published value
- £805kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 8 Aug 2026 → 11 Jan 2027 · 5 months · up to 11 Jan 2029 with extensions
- Reference
ocds-h6vhtk-06df5d
- Ends · in 76 daysExtension option
Adaptations for Disabled Access
London Borough of Bromley · Local authority · Greater London
Incumbent: Accessible Solutions Limited
Major adaptations for disabled access to a residential property within the London Borough of Bromley.
- Published value
- £110k
- Annual run-rate
- £110kpublished value ÷ term, exc. VAT
- Term
- 12 Jan 2026 → 11 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-060471
- Ends · in 76 days
Installation of Water Tank, London House
Berkshire Healthcare NHS Foundation Trust · Central government
Incumbent: Vectair Environmental
Install of new water tank in London House, Bracknell
- Published value
- £12k
- Annual run-rate
- —term under 6 months
- Term
- 2 Nov 2026 → 11 Jan 2027 · 2 months
- Reference
ocds-h6vhtk-078fd4
- Estimated end · in 77 daysFramework recordPanel · 16 suppliers
Rooftop Development Framework
Watford Community Housing · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: BPG Limited, Breyer Group Plc, Calfordseaden LLP +13 more
- Published value
- £200mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 12 Jan 2027 · start not published
- Reference
ocds-h6vhtk-035b2e
- Estimated end · in 77 days
Homes England York Central ICP/IDNO - York, North Yorkshire
Homes England (the name adopted by the Homes and Communities Agency) · Other public body · Yorkshire and the Humber
Incumbent: Harlaxton Engineering Services Ltd · Last contest: 1 bid (1 SME)
Homes England has appointed an Independent Connection Provider (ICP) and Independent Distribution Network Operator (IDNO) to provide, own and operate a new electrical network to provide power to the York Central Development.
- Published value
- £5.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 12 Jan 2027 · start not published
- Reference
ocds-h6vhtk-037ced
- Ends · in 77 days
WHHT - Asbestos Removal Works on Level 1 & 2, Moynihan, SACH
West Hertfordshire Teaching Hospitals NHS Trust · Central government
Incumbent: SCK GROUP LTD
Asbestos Removal Works on Level 1 & 2, Moynihan, St Albans City Hospital (SACH), a property of the West Hertfordshire Teaching Hospitals NHS Trust (WHHT). This contract was awarded in line with Trust Standing Financial Instructions (SFIs).
- Published value
- £251k
- Annual run-rate
- —term under 6 months
- Term
- 12 Oct 2026 → 12 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-0785aa
- Ends · in 77 days
AP25143 - Temporary Bridge - St Peters School
Scape Group Limited (trading as SCAPE) · Other public body · East Midlands
Incumbent: VP PLC
This Contract Details Notice is issued in compliance with the Procurement Act 2023 for a Below Threshold Procurement and is issued on behalf of Arc Property Services Partnership Limited ("Arc Partnership"). Temporary bridge installation, in…
- Published value
- £59k
- Annual run-rate
- £59kpublished value ÷ term, exc. VAT
- Term
- 12 Jan 2026 → 12 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-060652
- Estimated end · in 78 days
PLACE116 Supply and Installation of Bus Shelters
Derbyshire County Council · Local authority · East Midlands
Incumbent: Bus Shelters Ltd · Last contest: 1 bid (1 SME) · awarded at the estimate
The Economy, Transport and Environment Department of Derbyshire County Council manages the bus stop and bus shelter infrastructure throughout the county, excluding Derby City. This tender is to procure a provision for the supply, including …
- Published value
- £800k
- Annual run-rate
- —start date not published
- Term
- Estimated end 13 Jan 2027 · start not published
- Reference
ocds-h6vhtk-037f00
- Ends · in 78 days
Internal Adaptations
East Devon District Council · Local authority · Nationwide (UK)
Incumbent: BELL GROUP LTD
Internal Adaptations on Multiple EDDC properties
- Published value
- £297k
- Annual run-rate
- £531kpublished value ÷ term, exc. VAT
- Term
- 24 Jun 2026 → 13 Jan 2027 · 7 months
- Reference
ocds-h6vhtk-06be5d
- Ends · in 78 days
Voids Refurbishment Works and Services
BD Group · Other public body · Greater London
Incumbent: Seaxe Contract Services Ltd
Voids Refurbishment Works and Services relating to a project at properties within the London Borough of Barking & Dagenham.
- Published value
- £200k
- Annual run-rate
- —term under 6 months
- Term
- 13 Oct 2026 → 13 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-077faf
- Ends · in 78 days
Construction work
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: Pentaco Construction Ltd
956 - Construction works for capital theatre.
- Published value
- £88k
- Annual run-rate
- £88kpublished value ÷ term, exc. VAT
- Term
- 14 Jan 2026 → 13 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-060576
- Ends · in 78 days
Labour Works
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: Mechtronics Ltd
963 - labour - engineering works.
- Published value
- £68k
- Annual run-rate
- £68kpublished value ÷ term, exc. VAT
- Term
- 14 Jan 2026 → 13 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-0605aa
- Estimated end · in 79 days
Contract for Façade cladding remedial works at Northumbria Specialist Emergency Care Hospital
Northumbria Healthcare Facilities Management · North East England
Incumbent: Geoffrey Robinson Limited · Last contest: 2 bids (1 SME)
Contract for Façade cladding remedial works at Northumbria Specialist Emergency Care Hospital, Cramlington.
- Published value
- £12m
- Annual run-rate
- —start date not published
- Term
- Estimated end 14 Jan 2027 · start not published
- Reference
ocds-h6vhtk-049216
- Ends · in 79 days
Provision of Cladding Remediation at Blocks 1-38, Plas Y Mor, Glanmor Terrace, Burry Port
Codi Group Ltd · Other public body · Wales (Cymru)
Incumbent: Zeno Construction · Last contest: awarded 37% over the estimate
Codi Group conducted an Open Tender process to appoint a contractor for the Provision of Cladding Remediation at Blocks 1-38, Plas Y Mor, Glanmor Terrace, Burry Port, Carmarthenshire.
- Published value
- £972k
- Annual run-rate
- —term under 6 months
- Term
- 17 Aug 2026 → 14 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-06075e
- Ends · in 79 days
Pre Construction Services Agreement
JOHN INNES CENTRE · Other public body · East of England
Incumbent: MJS Projects (March) Ltd
This package of works forms part of the Next Generation Infrastructure (NGI) Programme, a funded development programme looking to develop the facilities across Norwich Research Park to transform the existing capabilities of John Innes Centr…
- Published value
- £143k
- Annual run-rate
- —term under 6 months
- Term
- 6 Aug 2026 → 14 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-06ded1
- Ends · in 79 days
Cantley Close Lift Modernisation
Metropolitan Housing Trust · Housing · East Midlands
Incumbent: MORRIS VERMAPORT LIMITED
Lift modernisation of domestic lift
- Published value
- £120kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 12 Aug 2026 → 14 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-06e28e
- Ends · in 79 days
Mechanical services
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: CPS Building Services Ltd
965 - Mechanical services cover for carrying out mechanical and planned maintenance.
- Published value
- £92k
- Annual run-rate
- £92kpublished value ÷ term, exc. VAT
- Term
- 15 Jan 2026 → 14 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-060662
- Ends · in 80 days
Baguley Blocks of Flats Roofing Refurbishment and Associated Works
Your Housing Group · Housing · North West England
Incumbent: RE:GEN GREEN LIMITED
Provision of various works at Baguley Blocks of Flats. Works required include the following: Baguley Flats (Roofing) • External roofing works o Strip out & preparation o Flat roof renewal o Insulation o Rainwater pipework/gutters • Baguley …
- Published value
- £2.0m
- Annual run-rate
- £2.3mpublished value ÷ term, exc. VAT
- Term
- 23 Feb 2026 → 15 Jan 2027 · 11 months
- Reference
ocds-h6vhtk-0671f7
- Ends · in 80 days
Window Renewal, Ext.& Comm Redes & Assoc. Repairs at Holborn Estate
London Borough of Wandsworth · Local authority · Greater London
Incumbent: HILTON ABBEY LTD
Window Renewal, Ext.& Comm Redes & Assoc. Repairs at Holborn Estate
- Published value
- £1.4m
- Annual run-rate
- £2.6mpublished value ÷ term, exc. VAT
- Term
- 6 Jul 2026 → 15 Jan 2027 · 6 months
- Reference
ocds-h6vhtk-06d0c6
- Ends · in 80 days
Refurb and replacement of the heating, hot water & associated mechanical and electrical systems at Yiewsley HC
NHS Property Services Limited · NHS & health
Incumbent: Rubon Mechanical Services Ltd
Refurb and replacement of the heating, hot water & associated mechanical and electrical systems at Yiewsley
- Published value
- £598k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 15 Jan 2027 · 4 months
- Reference
ocds-h6vhtk-06f70e
- Ends · in 80 days
Wilton Road
Herefordshire Council · Local authority · West Midlands
Incumbent: OWEN PELL LIMITED
Wilton Road -DN820907- Rocktrap and drainage installation
- Published value
- £500k
- Annual run-rate
- —term under 6 months
- Term
- 19 Oct 2026 → 15 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-078ed8
- Ends · in 80 days
66 Walcot Street - Refurbishment Works
Bath & North East Somerset Council · Local authority · South West England
Incumbent: STRINGER CONSTRUCT LTD
Provision of Refurbishment Works at 66A Walcott Street, Bath The total value of this contract's 3 month term is £ 207,349.59 (excl. VAT) The total value of this contract's 3 month term is £ 248,873.51 (incl. VAT)
- Published value
- £207k
- Annual run-rate
- —term under 6 months
- Term
- 2 Nov 2026 → 15 Jan 2027 · 2 months
- Reference
ocds-h6vhtk-078389
- Ends · in 80 days
Watford Town Centre Ice Rink 2026
Watford Borough Council · Local authority · East of England
Incumbent: ICE PARK LIMITED
Direct Award via exemption of Watford Town Centre Ice Rink 2026 to ICE PARK LIMITED
- Published value
- £157k
- Annual run-rate
- —term under 6 months
- Term
- 22 Sept 2026 → 15 Jan 2027 · 4 months
- Reference
ocds-h6vhtk-078b1e
- Ends · in 80 days
Major Adaptation Works
Peterborough City Council · Local authority · Nationwide (UK)
Incumbent: Aspire Adaptations Ltd
This is a one-off contract award relating to a single Disabled Facilities Grant (DFG) adaptation project. The contractor has already been appointed to the Care and Repair Framework for minor adaptations and has been approved through the Cou…
- Published value
- £124k
- Annual run-rate
- £245kpublished value ÷ term, exc. VAT
- Term
- 15 Jul 2026 → 15 Jan 2027 · 6 months
- Reference
ocds-h6vhtk-06cdc3
- Ends · in 80 days
West Carr Footpath Improvements
Kingston Upon Hull City Council · Local authority · Yorkshire and the Humber
Incumbent: RJR Group (Eng) Limited · Last contest: awarded 7% under the estimate
To provide footpath improvement works within West Carr, Kingston upon Hull.
- Published value
- £108k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 15 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-06d3cd
- Ends · in 80 days
Resurfacing Road Network at LTHT
Leeds Teaching Hospitals NHS Trust · Central government
Incumbent: Frank Tucker Limited
Resurfacing works to areas at the Leeds Teaching Hospitals - this includes any future incidental work that may need to be carried out during the next 12 months.
- Published value
- £101k
- Annual run-rate
- £101kpublished value ÷ term, exc. VAT
- Term
- 16 Jan 2026 → 15 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-0678c0
- Ends · in 80 days
Consultant Lead for Multidisciplinary Team – Hull City Hall Vision, Options Appraisal & RIBA Stage 1 Business Cases, mini competition via ERPS Framework Lot 6
Kingston Upon Hull City Council · Local authority
Incumbent: OVE ARUP & PARTNERS LIMITED
Hull City Council (The Authority) has appointed Ove Arup & Partners Limited (Company number: 01312453 ) to provide services for Consultancy Lead for Multidisciplinary Team – Hull City Hall Vision, Options Appraisal & RIBA Stage 1 Business C…
- Published value
- £67k
- Annual run-rate
- —term under 6 months
- Term
- 28 Oct 2026 → 15 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-078e6c
- Ends · in 80 days
National Centre for Child Health Technology - Discovery Den
Sheffield Children's NHS Foundation Trust · Central government · Yorkshire and the Humber
Incumbent: Kids Invent Stuff Ltd
Sheffield Children’s NHS Foundation Trust is commissioning a specialist Supplier to design, fabricate, install, and assist in the commissioning of a suite of interactive exhibits for the Discovery Den, located within the new National Centre…
- Published value
- £50k
- Annual run-rate
- £99kpublished value ÷ term, exc. VAT
- Term
- 15 Jul 2026 → 15 Jan 2027 · 6 months
- Reference
ocds-h6vhtk-068713
- Ends · in 80 days
Marine Drive Reinstatement Works
Denbighshire County Council · Central government · Wales (Cymru)
Incumbent: Pronin Limited
Works will consist of the following main items; site clearance, excavation, fill, kerbing, footway construction, fencing, plaining and topsoiling.
- Published value
- £44k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 15 Jan 2027 · 4 months
- Reference
ocds-h6vhtk-06d986
- Estimated end · in 82 daysFramework recordPanel · 29 suppliers
NHMF Frameworx Planned Maintenance, Net Zero Carbon and Passive Fire Safety Works Framework Agreements 2022
National Heritage Memorial Fund · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: Architectural Decorators Ltd, BELL GROUP LTD, CARDO (WALES & WEST) LIMITED +26 more
Re-procurement plannedPlanned Maintenance Framework - NI · tender expected
- Published value
- £850mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 17 Jan 2027 · start not published
- Reference
ocds-h6vhtk-03741f
- Estimated end · in 82 daysFramework recordPanel · 13 suppliers
Framework Agreement for Building and Associated Works 2022 - 2026 for works up to a value of £250,000
Wigan Council · Local authority · North West England
Panel: A Connolly Limited, BELL GROUP LTD, Brookhouse Contracting Ltd +10 more
- Published value
- £8.0mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 17 Jan 2027 · start not published
- Reference
ocds-h6vhtk-035f29
- Estimated end · in 82 days
Kitchen and Bathroom Replacement Programme 24_27
Barnet Homes Ltd · Greater London
Incumbent: Lura Constructions Ltd · Last contest: 16 bids · awarded 3% over the estimate
Kitchen and Bathroom replacement boroughwide is a 3-year Housing Capital Programme. Barnet Homes Ltd are looking to procure a three-year programme for Kitchen & Bathroom renewals with an option to extend for a further year. The aim of the K…
- Published value
- £3.6m
- Annual run-rate
- —start date not published
- Term
- Estimated end 17 Jan 2027 · start not published
- Reference
ocds-h6vhtk-042201
- Estimated end · in 82 daysPanel · 8 suppliers
All lots 1234
The Association of North East Councils Limited · Local authority · North East England
Panel: Clarke's Environmental Ltd, Enviraz (Scotland) Limited, Meta +5 more
NEPO is awarding a multi supplier procurement solution for stand-alone asbestos removal works to compliment the NEPO221 Demolition and Associated Services Framework Agreement.
- Published value
- £4.5m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 17 Jan 2027 · start not published
- Reference
ocds-h6vhtk-0422b1
- Ends · in 83 days
Construction phase of the Grove Park improvements
North Somerset Council · Local authority · South West England
Incumbent: John West (Contractors) Limited
Construction phase of the Government Funded improvements to Grove Park, W-s-M including new toilet, drainage and hard and soft landscaping.
- Published value
- £504k
- Annual run-rate
- £335kpublished value ÷ term, exc. VAT
- Term
- 18 Jul 2025 → 18 Jan 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-055e69
- Ends · in 83 days
Norwood Primary School - Window Replacement and Upgrade - North Block
Hampshire County Council · Local authority · South East England
Incumbent: HAZLEMERE WINDOW COMPANY LTD
Window and door replacement to North Block of Norwood Primary School.
- Published value
- £296k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 18 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-06e79a
- Ends · in 83 days
- replacement of emergency lighting systems Orchard MSU
West London NHS Trust · Central government
Incumbent: DC Emergency Systems
Full replacement of emergency lighting systems within Orchard MSU, including installation of a self-monitoring/testing system and anti-ligature fittings where required. The project is necessary to restore compliance with fire safety regulat…
- Published value
- £115k
- Annual run-rate
- —term under 6 months
- Term
- 8 Sept 2026 → 18 Jan 2027 · 4 months
- Reference
ocds-h6vhtk-06f371
- Ends · in 83 days
Gosport Re-roofing and associated works
South Central Ambulance Service NHS Foundation Trust · Central government · South East England
Incumbent: Salnor Roofing Services Ltd
Stripping and replacement of the existing roof finish and associated works
- Published value
- £111k
- Annual run-rate
- £121kpublished value ÷ term, exc. VAT
- Term
- 19 Feb 2026 → 18 Jan 2027 · 11 months
- Reference
ocds-h6vhtk-069062
- Ends · in 83 days
Andover Rewire
South Central Ambulance Service NHS Foundation Trust · Central government · South East England
Incumbent: VISION DESIGN LIMITED
Rewire and associated works
- Published value
- £80k
- Annual run-rate
- £87kpublished value ÷ term, exc. VAT
- Term
- 19 Feb 2026 → 18 Jan 2027 · 11 months
- Reference
ocds-h6vhtk-069064
- Estimated end · in 84 daysFramework recordPanel · 6 suppliers
Supply of Bus Shelters, Real Time Passenger Information Systems (RTPI) and Associated Services Y22030
Kent County Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Panel: Bus Shelters Ltd, Externiture Ltd, R2P UK SYSTEMS LIMITED +3 more
- Published value
- £50mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 19 Jan 2027 · start not published
- Reference
ocds-h6vhtk-037ec3
- Estimated end · in 85 daysFramework recordPanel · 9 suppliers
TC623 NORTH WEST CONSTRUSTION HUB – LOW VALUE CONSTRUCTION FRAMEWORK (2024 TO 2028)
Manchester City Council · Local authority · North West England
Panel: Conlon Construction Limited, Equans Regeneration Ltd, Eric Wright Construction +6 more
- Published value
- £400mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 20 Jan 2027 · start not published
- Reference
ocds-h6vhtk-0406c2
- Estimated end · in 85 days
The Provision of a measured Term Contract for Building Works – Planned, Reactive and Minor Works
Hertfordshire County Council · Local authority · East of England
Incumbent: Wates Property Services Ltd · Last contest: 5 bids (4 SME) · awarded at the estimate
Hertfordshire County Council went out to Procurement for the Provision of Measured Term Contract for Building Works. This is an Award Notice and this opportunity has now closed. Please see Section V (Award of Contract) for further details.
- Published value
- £7.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 20 Jan 2027 · start not published
- Reference
ocds-h6vhtk-040f04
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.