Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 11–20

  1. Ends · in 3 daysExtension option · up to 30 Oct 2027

    Harrogate Junction Improvement Options and Detailed Design

    The North Yorkshire Council · Local authority · Yorkshire and the Humber

    Incumbent: WSP UK Limited

    Harrogate Junction Improvement Options & Detailed Design. Feasibility and design for further Harrogate TCF work

    Published value
    £77k
    Annual run-rate
    —term under 6 months
    Term
    30 Jun 2026 → 30 Oct 2026 · 4 months · up to 30 Oct 2027 with extensions
    Reference
    ocds-h6vhtk-06f4e7
  2. Ends · in 3 days

    Measured surveys - Low Rise FRA Actions - Area V Somerstown

    Portsmouth City Council · Local authority · South East England

    Incumbent: THE RUXTON GROUP LTD

    Measured surveys to produce floor plans and construction drawings for 53Nr low rise blocks of flats within Somerstown, Portsmouth.

    Published value
    £69kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    30 Jul 2026 → 30 Oct 2026 · 3 months
    Reference
    ocds-h6vhtk-06dc93
  3. Ends · in 3 days

    Plymouth Heat Network Delivery Partner - Technical Consultancy

    Plymouth City Council · Local authority · South West England

    Incumbent: Buro Happold Ltd

    Technical consultancy support in relation to the Plymouth Heat Network project including: - continued technical support for the current Heat Network Development Partner procurement and commercialisation (including completion of evaluations)…

    Published value
    £60k
    Annual run-rate
    £93kpublished value ÷ term, exc. VAT
    Term
    9 Mar 2026 → 30 Oct 2026 · 8 months
    Reference
    ocds-h6vhtk-06646c
  4. Ends · in 3 days

    RIBA Stage 3 for Transforming Fleet Street Project

    The Mayor and Commonalty and Citizens of the City of London · Local authority · Greater London

    Incumbent: Bradley-Hole Schoenaich Landscape Architects Limited

    The Provision of RIBA Stage 3 Services for Transforming Fleet Street Project.

    Published value
    £58k
    Annual run-rate
    £80kpublished value ÷ term, exc. VAT
    Term
    9 Feb 2026 → 30 Oct 2026 · 9 months
    Reference
    ocds-h6vhtk-067a06
  5. Ends · in 3 days

    Monsal Trail - Scaling to Rock Cuttings PM03511/25/05

    Peak District National Park Authority · Other public body · East Midlands

    Incumbent: High Peak Access Ltd · Last contest: awarded 15% over the estimate

    The Monsal Trail has a number of structures, embankments and cuttings along its 8 mile length. Following inspections of the cuttings, the Peak District National Park Authority as owners of the trail has decided to undertake regular rock sca…

    Published value
    £58k
    Annual run-rate
    £71kpublished value ÷ term, exc. VAT
    Term
    6 Jan 2026 → 30 Oct 2026 · 10 months
    Reference
    ocds-h6vhtk-05abd7
  6. Ends · in 3 days

    Car Park Segregation Fencing and Demarcation Fencing - Doncaster Sheffield

    City of Doncaster Council · Local authority · Yorkshire and the Humber

    Incumbent: Airport Utilities Ltd

    Car park segregation and demarcation fencing at Doncaster Sheffield Airport, comprising the design, supply and installation of robust fencing and associated infrastructure to clearly separate and control different operational areas within t…

    Published value
    £50k
    Annual run-rate
    £97kpublished value ÷ term, exc. VAT
    Term
    27 Apr 2026 → 30 Oct 2026 · 6 months
    Reference
    ocds-h6vhtk-069018
  7. Ends · in 3 days

    City Centre North Regeneration - Site Surveys

    Portsmouth City Council · Local authority · South East England

    Incumbent: Waterman Aspen

    New and refreshed desktop & walk-over site surveys of the CCN site

    Published value
    £46kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    7 Jul 2026 → 30 Oct 2026 · 4 months
    Reference
    ocds-h6vhtk-06cbe2
  8. Ends · in 3 days

    Appointment of BB7 Consulting Limited to undertake fire risk assessment and external wall appraisal services across the residential and commercial areas of Crescent House as part of the Golden Lane Estate Investment Programme, as more parti

    The Mayor and Commonalty and Citizens of the City of London · Local authority

    Incumbent: BB7 Consulting Limited

    Description of the purchase Appointment of BB7 to undertake the following fire safety and risk assessment services (Crescent House) : • FRAEW site visit • Fire Risk Appraisal of External Walls (FRAEW) • Residential Fire Risk Assessment (Typ…

    Published value
    £32kinc. VAT as published
    Annual run-rate
    £30kpublished value ÷ term, inc. VAT
    Term
    1 Oct 2025 → 30 Oct 2026 · 1.1 yrs
    Reference
    ocds-h6vhtk-066d4a
  9. Ends · in 3 days

    Warrington Local Housing Needs Assessment (LHNA)

    Warrington Borough Council · Local authority · North West England

    Incumbent: ARC4 LIMITED

    A contract for suitably qualified consultants for the provision of consultancy services to undertake a detailed and robust Local Housing Needs Assessment (LHNA) to support the Council's updated Local Plan

    Published value
    £28k
    Annual run-rate
    —term under 6 months
    Term
    25 Aug 2026 → 30 Oct 2026 · 2 months
    Reference
    ocds-h6vhtk-06edbf
  10. Ends · in 3 days

    Expert report - UCL - Marmot

    Cabinet Office · Central government · Nationwide (UK)

    Incumbent: UCL Consultants Limited

    Expert Witness Reports to UK Covid-19 Public Inquiry

    Published value
    £20k
    Annual run-rate
    £23kpublished value ÷ term, exc. VAT
    Term
    19 Dec 2025 → 30 Oct 2026 · 10 months
    Reference
    ocds-h6vhtk-05ffd8

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months395
  2. 3–6 months489
  3. 6–12 months529
  4. 12–24 months872

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.