Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 101–200
- Ends · in 3 days
Replacement Rainwater Goods
Somerset Council · Local authority · South West England
Incumbent: D R Jones Yeovil Ltd
Replace existing defective rainwater goods
- Published value
- £35k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 30 Oct 2026 · 5 days
- Reference
ocds-h6vhtk-077591
- Ends · in 3 days
Electric Vehicle Charging Installation - Off Site East Car Park
Nuclear Restoration Services Limited · Other public body
Incumbent: G G Mackay Limited
A below threshold contract has been awarded by Nuclear Restoration Services Limited - Dounreay for the installation of electrical vehicle charging points in the East off site car park
- Published value
- £34k
- Annual run-rate
- —term under 6 months
- Term
- 17 Jul 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06cf7c
- Ends · in 3 days
Swanwick Lodge Secure Unit - Lakeside Quiet Area Roof Refurbishment
Hampshire County Council · Local authority · South East England
Incumbent: Salnor Roofing Services Ltd
Alteration to the front section of a flat roof (approx. 1.5m) which currently back falls into a box gutter with internal drainage. The falls to the front 1.5m will be changed so that all rainwater drains to the perimeter. This will involve …
- Published value
- £31k
- Annual run-rate
- —term under 6 months
- Term
- 12 Oct 2026 → 30 Oct 2026 · 19 days
- Reference
ocds-h6vhtk-0789b8
- Ends · in 3 days
YG Rhydywaun - Fire Alarm Upgrade Phase 1
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: Ambassador Fire & Security Ltd
YG Rhydywaun - Fire Alarm Upgrade Phase 1 2026
- Published value
- £28k
- Annual run-rate
- —term under 6 months
- Term
- 17 Jul 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06d4d3
- Ends · in 3 days
Belmont Rd signals
Herefordshire Council · Local authority · West Midlands
Incumbent: Telent Technology Services Limited
Belmont Rd signals-DN823683
- Published value
- £28k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 30 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-077581
- Ends · in 3 days
Ashtead Commons Bridge Repairs
The Mayor and Commonalty and Citizens of the City of London · Local authority · Greater London
Incumbent: Dendale Construction Ltd
The Provision of Various Bridge Repairs at Ashtead Common.
- Published value
- £25k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 30 Oct 2026 · 30 days
- Reference
ocds-h6vhtk-077f38
- Ends · in 3 days
Audleys Resource Centre - Changing Room Alterations
Hampshire County Council · Local authority · South East England
Incumbent: Tew Brothers Ltd
Alteration of an existing toilet to add in a dropped floor shower beneath the toilet pan to enable a douche shower to be added for use with the toilet. Associated works will include localised alteration of underfloor heating beneath chipboa…
- Published value
- £23k
- Annual run-rate
- —term under 6 months
- Term
- 15 Oct 2026 → 30 Oct 2026 · 16 days
- Reference
ocds-h6vhtk-0789dd
- Ends · in 3 days
Harwich Police Office Shuttering
The Police, Fire and Crime Commissioner for Essex · Police & fire
Incumbent: J W Steele and Sons Ltd
Due to site closure shuttering will be erected to secure premises
- Published value
- £22k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 30 Oct 2026 · 30 days
- Reference
ocds-h6vhtk-06abf6
- Ends · in 3 days
Electrical Works
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Cloakes Limited
Supply and install High Integrity Earthing& Containment between new sub station and existing using 120mm CPC Supply and install temporary2 x 70mm 4C SWA cable from the old sub station to the new 400A Panel board (due to late delivery by UKP…
- Published value
- £21k
- Annual run-rate
- £21kpublished value ÷ term, exc. VAT
- Term
- 29 Oct 2025 → 30 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-05d986
- Ends · in 3 days
Removal of Partition Walls
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Mosaic Property Management Ltd
Remove partition walls to reception area at the entrance of the building and discard of Remove partition walls beside the boardroom and discard of
- Published value
- £17k
- Annual run-rate
- £17kpublished value ÷ term, exc. VAT
- Term
- 31 Oct 2025 → 30 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-05dd69
- Ends · in 3 days
Wallop Primary School - External Door Replacement
Hampshire County Council · Local authority · South East England
Incumbent: HAZLEMERE WINDOW COMPANY LTD
Replacement of double doors, glazed side panels and 5 no. glazed panels above double doors with new aluminium doors and glazed units. Please see attached image of double doors and surrounding glazed units to be replaced.
- Published value
- £15k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 30 Oct 2026 · 5 days
- Reference
ocds-h6vhtk-0789f6
- Ends · in 3 days
Replacement of the damaged Essential Distribution Board
Met Office · Central government · Northern Ireland
Incumbent: GRS Building Services
Replacement of the damaged Essential Distribution Board in Met Office Castor Bay, Lurgan, Craigavon, Northern Ireland.
- Published value
- £13k
- Annual run-rate
- —term under 6 months
- Term
- 19 Oct 2026 → 30 Oct 2026 · 12 days
- Reference
ocds-h6vhtk-07909a
- Ends · in 3 days
Willow Court Nursing Care Home, Forest Court Nursing Care Home, Hawthorne Court Nursing Care Home - Access Control
Hampshire County Council · Local authority · South East England
Incumbent: A.J. TAYLOR ELECTRICAL CONTRACTORS LIMITED
Anticipated Five pairs of corridor doors across three sites are currently held open by door retaining devices linked to the fire alarm system. In the event of a fire alarm activation, the doors are released by the door closers and the exist…
- Published value
- £12k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 30 Oct 2026 · 26 days
- Reference
ocds-h6vhtk-0789c1
- Ends · in 3 days
Gordano Valley NNR Culvert construction
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · South West England
Incumbent: Pcknowles Agricultural Contractors · Last contest: awarded 2% under the estimate
Construction of culvert on viewed rhyne at Gordano Valley NNR
- Published value
- £12k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06ac1c
- Ends · in 3 days
25/0394/H
Borough of Telford & Wrekin · Local authority · Nationwide (UK)
Incumbent: Broad Oak Properties Limited
Specialist ramp, WC alteration
- Published value
- £11k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 30 Oct 2026 · 33 days
- Reference
ocds-h6vhtk-07829b
- Ends · in 3 days
FWKORD0050 - P12111 Alphington Street, Willeys Avenue, Exeter-1
Devon County Council · Local authority · South West England
Incumbent: Cormac Contracting Ltd
Highways Work Orders under or equal to 200,000. This will be for six suppliers.
- Published value
- £9k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 30 Oct 2026 · 30 days
- Reference
ocds-h6vhtk-077c25
- Ends · in 3 days
25/0370/H
Borough of Telford & Wrekin · Local authority · Nationwide (UK)
Incumbent: WB BUILDING SERVICES LIMITED
level access shower
- Published value
- £7k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 30 Oct 2026 · 33 days
- Reference
ocds-h6vhtk-07828c
- Ends · in 4 daysExtension option · up to 31 Dec 2026
Northwich Market Fit out
Cheshire west and Chester Borough Council · Local authority · North West England
Incumbent: MEDLOCK FRB LIMITED
Creating a new market for traders moving from the old location in Northwich.
- Published value
- £2.0minc. VAT as published
- Annual run-rate
- £2.7mpublished value ÷ term, inc. VAT
- Term
- 2 Feb 2026 → 31 Oct 2026 · 9 months · up to 31 Dec 2026 with extensions
- Reference
ocds-h6vhtk-060740
- Ends · in 4 daysExtension option · up to 31 Dec 2026
Tushingham school extensions
Cheshire west and Chester Borough Council · Local authority · North West England
Incumbent: PAVE AWAYS LTD
extensions at Tushingham Primary school
- Published value
- £1.4minc. VAT as published
- Annual run-rate
- £2.1mpublished value ÷ term, inc. VAT
- Term
- 2 Mar 2026 → 31 Oct 2026 · 8 months · up to 31 Dec 2026 with extensions
- Reference
ocds-h6vhtk-06130e
- Ends · in 4 days
Fairfield School SEND Phase 1 Extension
West Northamptonshire Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: PGR Group Limited
The initial works comprise the removal of the existing temporary classroom and associated elements, then the construction of a new two classroom teaching blocks at Fairfield Primary School, Trinity Avenue, Northampton. See linked notice, Th…
- Published value
- £1.3m
- Annual run-rate
- £2.1mpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Oct 2026 · 7 months
- Reference
ocds-h6vhtk-068e36
- Ends · in 4 days
Window Replacement programme for Leasehold properties in West London
Southern Housing · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: NATIONCARE WINDOWS LIMITED
Provision of Window Replacement programme for Leasehold properties in West London
- Published value
- £713kinc. VAT as published
- Annual run-rate
- £1.0mpublished value ÷ term, inc. VAT
- Term
- 23 Feb 2026 → 31 Oct 2026 · 8 months
- Reference
ocds-h6vhtk-0679c1
- Ends · in 4 days
Fairfield School SEND Phase 1 Extension
West Northamptonshire Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: PGR Group Limited
- Published value
- £690k
- Annual run-rate
- £1.2mpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Oct 2026 · 7 months
- Reference
ocds-h6vhtk-068e36
- Ends · in 4 days
AAU Ward Expansion
Isle of Wight NHS Trust · Central government · South East England
Incumbent: STONEHAM CONSTRUCTION LIMITED
Construction services linked to the conversion of existing offices into clinical accommodation comprising of 7 additional beds within the existing Acute Assessment Unit at St Marys Hospital, Newport, Isle of Wight
- Published value
- £669k
- Annual run-rate
- £998kpublished value ÷ term, exc. VAT
- Term
- 1 Mar 2026 → 31 Oct 2026 · 8 months
- Reference
ocds-h6vhtk-065bb1
- Ends · in 4 days
Blyth Remedial Works
ORE Catapult · Other public body · North East England
Incumbent: Southbay Civil Engineering Ltd
This project consists of the following work packages. It is ORE Catapult intention to appoint one contractor to carry out the works of both work packages, however it is possible that the work packages may be split if this provides a clear b…
- Published value
- £649k
- Annual run-rate
- —term under 6 months
- Term
- 27 Jul 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-0663f9
- Ends · in 4 daysExtension option
ESCC- Heathfield Community College SEN expansion
East Sussex County Council · Local authority
Incumbent: BMR CONSTRUCTION LIMITED
SEN expansion works at Heathfield Community College
- Published value
- £594k
- Annual run-rate
- —term under 6 months
- Term
- 23 Jul 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-077517
- Ends · in 4 days
RDC CN DLWP Roofing Package ESPH758
Rother District Council · Local authority · South East England
Incumbent: RTB Roofing Ltd
Rother District Council are seeking to appoint a suitable qualified and experienced contractor for an Advance Works package comprising of a roof repair, waterproofing, and safety improvements to the De La Warr Pavilion. The scope includes r…
- Published value
- £500k
- Annual run-rate
- —term under 6 months
- Term
- 1 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06e03a
- Ends · in 4 days
Sutton Beeches and Mulberry Demolitions
Cheshire west and Chester Borough Council · Local authority · North West England
Incumbent: J. FREELEY LIMITED
Demolition of Sutton Beeches Ellesmere Port and one building on the Mulberry site Chester
- Published value
- £500kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 1 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06789c
- Ends · in 4 days
Higher Clough Culvert Strengthening
Rochdale Borough Council · Local authority · North West England
Incumbent: F.W. SHERRATT LIMITED
The contract is to undertake civils works to strengthen the existing Higher Clough Culvert which supports School Lane, Norden above Naden Brook.
- Published value
- £498k
- Annual run-rate
- —term under 6 months
- Term
- 7 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06c2c1
- Ends · in 4 days
ITT - Shrewsbury Flaxmill Maltings - 4th Floor Office Fitout - UID 231
Historic England · Central government · Nationwide (UK)
Incumbent: Icon Projects Ltd
The project comprises the appointment of a main contractor to undertake the fit-out of office accommodation located on the fourth floor of Shrewsbury Flaxmill Maltings (SFM) to a Category A (Cat A) standard. The scope of works includes, but…
- Published value
- £491k
- Annual run-rate
- —term under 6 months
- Term
- 12 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06e106
- Ends · in 4 days
Vacant Property Repairs (Voids) - GB Group (Corporate Ltd)
Swindon Borough Council · Local authority · South West England
Incumbent: GB GROUP (CORPORATE) LIMITED
Swindon Borough Council is seeking up to 3 contractors to carry out minor refurbishments to council properties vacated by tenants. The works provided under this contract will ensure that all Council housing stock is of a suitable, lettable …
- Published value
- £490klist or panel total repeated on every provider; not this contract's value
- Annual run-rate
- —list or panel total, not a run-rate
- Term
- 1 May 2026 → 31 Oct 2026 · 6 months
- Reference
ocds-h6vhtk-06c08f
- Ends · in 4 days
Vacant Property Repairs (Voids) - Snape Contracting Services Ltd
Swindon Borough Council · Local authority · South West England
Incumbent: Snape Contracting Services Ltd
Swindon Borough Council is seeking up to 3 contractors to carry out minor refurbishments to council properties vacated by tenants. The works provided under this contract will ensure that all Council housing stock is of a suitable, lettable …
- Published value
- £490klist or panel total repeated on every provider; not this contract's value
- Annual run-rate
- —list or panel total, not a run-rate
- Term
- 1 May 2026 → 31 Oct 2026 · 6 months
- Reference
ocds-h6vhtk-06c08f
- Ends · in 4 days
Vacant Property Repairs (Voids) - Cantillon Group Ltd
Swindon Borough Council · Local authority · South West England
Incumbent: Cantillon Group Limited
Swindon Borough Council is seeking up to 3 contractors to carry out minor refurbishments to council properties vacated by tenants. The works provided under this contract will ensure that all Council housing stock is of a suitable, lettable …
- Published value
- £490klist or panel total repeated on every provider; not this contract's value
- Annual run-rate
- —list or panel total, not a run-rate
- Term
- 1 May 2026 → 31 Oct 2026 · 6 months
- Reference
ocds-h6vhtk-06c08f
- Ends · in 4 days
Emergency sand dredging at Burry Port Harbour
Carmarthenshire County Council · Local authority · Wales (Cymru)
Incumbent: Kaymac Marine & Civil Engineering Ltd
The Council requires a contractor to carry out sand dredging at Burry Port Harbour including both the outer harbour and approach channel. These works will involve movement to deposition site on East Beach.
- Published value
- £425k
- Annual run-rate
- —term under 6 months
- Term
- 13 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06cc40
- Ends · in 4 days
New Bridge Court
Cheshire west and Chester Borough Council · Local authority · North West England
Incumbent: Gareth Morris Construction
Works at New Bridge Court - Ellesmere Port
- Published value
- £400kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06c1ef
- Ends · in 4 days
Provision of 3G Carpet Replacements at Chirk Leisure & Activity Centre, Clywedog Sports Centre, Morgan Llwyd Sports Centre & Queensway Stadium
Wrexham County Borough Council · Local authority · Wales (Cymru)
Incumbent: Blakedown Sport & Play Limited · Last contest: awarded 37% under the estimate
Provision of 3G Carpet Replacement at Chirk Leisure & Activity Centre, Clywedog Sports Centre, Morgan Llwyd Sports Centre & Queensway Stadium Proc-25-40 Notice of contract signature & commencement
- Published value
- £379k
- Annual run-rate
- £605kpublished value ÷ term, exc. VAT
- Term
- 17 Mar 2026 → 31 Oct 2026 · 8 months
- Reference
ocds-h6vhtk-059eea
- Ends · in 4 days
PLD26131 Demolition 62 - 70 Victoria Street,
Torbay Council · Local authority · South West England
Incumbent: Sam Gilpin Demolition Ltd
Demolition Activities 62 - 70 Victoria Street, Paignton
- Published value
- £350k
- Annual run-rate
- —term under 6 months
- Term
- 24 May 2026 → 31 Oct 2026 · 5 months
- Reference
ocds-h6vhtk-06c277
- Ends · in 4 days
Provision of Welfare Facilities at Wootton Hall
The Police, Fire and Crime Commissioner for Northamptonshire · Police & fire · East Midlands
Incumbent: J.E.T Construction (Milton Keynes) Limited
Provision of Welfare Facilities at Wootton Hall (Northamptonshire Police Headquarters), to include showers, WCs, locker/ changing room.
- Published value
- £313k
- Annual run-rate
- £419kpublished value ÷ term, exc. VAT
- Term
- 1 Feb 2026 → 31 Oct 2026 · 9 months
- Reference
ocds-h6vhtk-065a1d
- Ends · in 4 days
Westvale Primary School Main Entrance Refurbishment & Window Replacement
Knowsley Council · Local authority · North West England
Incumbent: Frank Rogers Building Contractor Ltd
This contract is for a contractor to carry out refurbishment and remodelling works to the main entrance (reception of the school) and works to a classroom and Window Replacement Programme.
- Published value
- £309k
- Annual run-rate
- —term under 6 months
- Term
- 19 Jul 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06e441
- Ends · in 4 daysExtension option · up to 1 Oct 2027
Rodbourne Cheney Play Area
Central Swindon North Parish Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Wicksteed Leisure Ltd · Last contest: awarded at the estimate
Design, supply and installation of an inclusive play area at Rodbourne Cheney, Swindon, including play equipment, safety surfacing, associated groundworks, fencing, seating and related installation works. The contract also includes options,…
- Published value
- £290k
- Annual run-rate
- —term under 6 months
- Term
- 1 Jul 2026 → 31 Oct 2026 · 4 months · up to 1 Oct 2027 with extensions
- Reference
ocds-h6vhtk-04f978
- Ends · in 4 days
Delapre Annexe - Roof Replacement/Repairs and Refurbishment
West Northamptonshire Council · Local authority · East Midlands
Incumbent: Semilong Services Ltd
The project involves general building fabric repair and refurbishment throughout, which includes but is not limited to roofing works, brickwork repairs, general exterior maintenance, internal decorations and finishes, internal refurbishment…
- Published value
- £283k
- Annual run-rate
- £496kpublished value ÷ term, exc. VAT
- Term
- 7 Apr 2026 → 31 Oct 2026 · 7 months
- Reference
ocds-h6vhtk-067ca9
- Ends · in 4 days
Ise Valley Greenway
North Northamptonshire Council · Local authority · East Midlands
Incumbent: Phoenix Surfacing Limited · Last contest: awarded 7% under the estimate
Installation of new cycleway to deliver improved pedestrian / cycle access along the River Ise, connected with Hanwood Park Garden Community. The section located to the north and south of Deeble Road is an important connecter in the IVG whi…
- Published value
- £279k
- Annual run-rate
- —term under 6 months
- Term
- 17 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-059856
- Ends · in 4 days
Delivery of Pre Construction Services in relation to Holyrood Primary School Chard
Somerset Council · Local authority · South West England
Incumbent: Kier Construction Ltd
Provision of Pre Construction Services for construction of a primary school- Holyrood Primary School Chard
- Published value
- £261k
- Annual run-rate
- £366kpublished value ÷ term, exc. VAT
- Term
- 13 Feb 2026 → 31 Oct 2026 · 9 months
- Reference
ocds-h6vhtk-065e79
- Ends · in 4 daysExtension option · up to 31 Dec 2026
Northwich Station Refurbishment 2026
Cheshire west and Chester Borough Council · Local authority · North West England
Incumbent: MPH CONSTRUCTION LIMITED
Refurbishment of Northwich Rail station RIBA stage 5-7
- Published value
- £240kinc. VAT as published
- Annual run-rate
- £410kpublished value ÷ term, inc. VAT
- Term
- 1 Apr 2026 → 31 Oct 2026 · 7 months · up to 31 Dec 2026 with extensions
- Reference
ocds-h6vhtk-05ec6b
- Ends · in 4 days
St Paul's CE Primary School - SEN Studio Classroom Works within playground area & Library Mezzanine and Roofing Works.
City of York Council · Local authority · Yorkshire and the Humber
Incumbent: The Together Group Construction Ltd · Last contest: awarded 30% under the estimate
The City of York Council has an opportunity for St Paul's CE Primary School - SEN Studio Classroom Works within playground area & Library Mezzanine and Roofing Works.
- Published value
- £211k
- Annual run-rate
- —term under 6 months
- Term
- 20 Jul 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-065636
- Ends · in 4 days
Scaffolding and Oversailing Licenses
National Highways Limited · Central government
Incumbent: Bupa Insurance Limted
Scaffolding and Oversailing Licenses for M5 St Georges Overbridge.
- Published value
- £210k
- Annual run-rate
- —term under 6 months
- Term
- 18 Aug 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06ea87
- Ends · in 4 days
Interim Replacement Kitchen Contract
The North Yorkshire Council · Local authority · Yorkshire and the Humber
Incumbent: HOME UTILITY GROUP LIMITED
In the absence of a permanent contractor appointment, an interim contract is being put in place as an interim measure to deal with priority cases.
- Published value
- £208k
- Annual run-rate
- —term under 6 months
- Term
- 1 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06d0f2
- Ends · in 4 days
Replacement of timber windows and doors identifed at FLATS 1-10, NORMANDY HOUSE, ST MARYS, ISLES OF SCILLY, TR21 0NY
LiveWest Homes Limited · Other public body · South West England
Incumbent: CAMBORNE JOINERY LIMITED
Includes all required transportation, accommodation, scaffolding etc necessary to carry out and complete the works, including all necessary disposal and building control sign off
- Published value
- £204k
- Annual run-rate
- —term under 6 months
- Term
- 20 May 2026 → 31 Oct 2026 · 5 months
- Reference
ocds-h6vhtk-06b103
- Ends · in 4 days
Saughall All Saints Boiler
Cheshire west and Chester Borough Council · Local authority · North West England
Incumbent: MPH CONSTRUCTION LIMITED
new heating system for All Saints School
- Published value
- £180kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 7 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06d4d4
- Ends · in 4 days
Refurbishment, Design & Build of Admers Crescent GU30 7HP and The Lyndons GU30 7SD Play Areas in the parish of Bramshott and Liphook
East Hampshire District Council · Local authority · South East England
Incumbent: Proludic
Refurbishment, Design & Build of Admers Crescent GU30 7HP and The Lyndons GU30 7SD Play Areas in the parish of Bramshott and Liphook. EHDC
- Published value
- £164k
- Annual run-rate
- —term under 6 months
- Term
- 22 May 2026 → 31 Oct 2026 · 5 months
- Reference
ocds-h6vhtk-06aa65
- Ends · in 4 days
Waterfront Connectivity Walkway
Hartlepool Borough Council · Local authority · North East England
Incumbent: BCE Northern Limited
Waterfront Connectivity Walkway works, including steel frame and foundations to the dry side of Jackson Dock western slipway.
- Published value
- £161k
- Annual run-rate
- —term under 6 months
- Term
- 27 Sept 2026 → 31 Oct 2026 · 35 days
- Reference
ocds-h6vhtk-06f8ec
- Ends · in 4 days
St Leonards Electrical Panel Board Replacement Works
Dorset HealthCare University NHS Foundation Trust · Central government
Incumbent: SineWave Electrical Contractors Ltd
Backlog life cycle replacement works to replace the mains electrical panel board serving St Leonards Hospital and the wheelchair centre
- Published value
- £159k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-077742
- Ends · in 4 days
Seaforth Bus Stop and Accessibility
Merseytravel · Other public body · North West England
Incumbent: Huyton Asphalt Ltd
Merseytravel is looking to procure a Civil Engineering Contractor to undertake minor civil engineering works associated with the upgrade of 8 existing bus stops and pedestrian accessibility works. These works form part of the Seaforth Bus a…
- Published value
- £127k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-077d96
- Ends · in 4 days
South Derbyshire Growth Zone - Cadent Gas
Derbyshire County Council · Local authority · East Midlands
Incumbent: Cadent Gas Limited
At the request of DCC, Cadent Gas need to carry out investigatory work on their own assets to ensure the asset is robust enough given the increased loading from the SDGZ scheme. The work is essentially to expose the medium/high pressure gas…
- Published value
- £118k
- Annual run-rate
- —term under 6 months
- Term
- 27 Aug 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-0783b9
- Ends · in 4 days
Dingle Centre Demolition
Cheshire west and Chester Borough Council · Local authority · North West England
Incumbent: CONNELL BROTHERS LIMITED
demolition of dingle centre Winsford
- Published value
- £114kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 19 Aug 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06d9e8
- Ends · in 4 days
Major Voids Refurbishment - 1a Betworthy, Coaley, Dursley, Gloucestershire, GL11 5EF
Stroud District Council · Local authority · South West England
Incumbent: NKS Contracts (Central) Ltd · Last contest: awarded 59% over the estimate
This tender relates to the refurbishment, remodelling and adaptation of a vacant Council-owned dwelling. The property is a single-storey bungalow currently configured as a two-bedroom dwelling. The proposed scheme involves the conversion an…
- Published value
- £111k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 31 Oct 2026 · 27 days
- Reference
ocds-h6vhtk-06bde5
- Ends · in 4 days
Provision of Dibden Golf Centre Club House re-development
New Forest District Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: MAIN FIX INTERIORS LTD · Last contest: awarded at the estimate
Provision of Dibden Golf Centre Club House re-development New Forest District Council's (NFDC) owned Dibden Golf Centre Club House is ageing and its current internal and external appearance has become visibly worn and outdated. The building…
- Published value
- £100k
- Annual run-rate
- —term under 6 months
- Term
- 20 Jul 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-068504
- Ends · in 4 days
009555 - Supply and Installation of Communal Steel Doorsets at Whitbeck Road
Newcastle City Council · Local authority · North East England
Incumbent: MARTEC ENGINEERING GROUP LIMITED
Newcastle City Council is seeking to appoint a suitably qualified and experienced contractor to undertake the replacement of communal entrance doors at Whitbeck Road.
- Published value
- £91k
- Annual run-rate
- —term under 6 months
- Term
- 20 Jul 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06ccd2
- Ends · in 4 days
HE0915 M4 Junction 17 Improvement Works
Wiltshire Council · Local authority · South West England
Incumbent: MJ Church (Plant) Limited (a6 a9 a11)
Wiltshire Council are procuring a contract for the delivery of the M4 Junction 17 improvement works, with a view to awarding the contract in early spring 2026. Scope of Works The proposed scheme includes: • Installation of traffic signals o…
- Published value
- £90k
- Annual run-rate
- —term under 6 months
- Term
- 7 Jun 2026 → 31 Oct 2026 · 5 months
- Reference
ocds-h6vhtk-051a6b
- Ends · in 4 daysExtension option · up to 30 Apr 2027
Balcony Walkway Replacement at Sandgate High Street Flats, Folkestone
The District Council of Folkestone and Hythe · Local authority · South East England
Incumbent: Ensigna Construction ltd · Last contest: awarded 11% under the estimate
Replacement of the rear access balcony to second-floor maisonettes, with the following key components: • Removal and replacement of existing balcony deck. • Remedial works to cantilevered support beams as per structural engineer recommendat…
- Published value
- £89k
- Annual run-rate
- £89kpublished value ÷ term, exc. VAT
- Term
- 3 Nov 2025 → 31 Oct 2026 · 1 yr · up to 30 Apr 2027 with extensions
- Reference
ocds-h6vhtk-0566be
- Ends · in 4 daysExtension option · up to 30 Jun 2027
HCC2617573 Saffron Green Grazing Infrastructure
Hertfordshire County Council · Local authority
Incumbent: FARM & COUNTRY SUPPLIES LIMITED
To create a livestock proof barrier: 1. Removal of approx. 1140m old barbed-wire fencing and appropriate disposal off site. 2. Supply and installation of approximately 4400m of post and wire stock-proof fencing, incorporating 9 no. new fiel…
- Published value
- £88kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 31 Oct 2026 · 2 months · up to 30 Jun 2027 with extensions
- Reference
ocds-h6vhtk-06ef3b
- Ends · in 4 daysExtension option · up to 31 Dec 2026
294 Mount Pleasant Road, London N17 6HA - Underpinning and Structural repairs
London Borough of Haringey · Local authority · Nationwide (UK)
Incumbent: Arlington Builders LTD
[REPAIR OF MOVENT RELATED DAMAGES] as detailed in the Tender Documents. The works include (but are not limited to) [INTERNAL/EXTERNAL REPAIR WORKS].
- Published value
- £83k
- Annual run-rate
- £156kpublished value ÷ term, exc. VAT
- Term
- 20 Apr 2026 → 31 Oct 2026 · 6 months · up to 31 Dec 2026 with extensions
- Reference
ocds-h6vhtk-0655d2
- Ends · in 4 days
Baker Lane - Stanley
Wakefield Council · Local authority · Yorkshire and the Humber
Incumbent: Derek Lewis Ltd
Baker Lane - Stanley- Carriageway Re-Surfacing
- Published value
- £81kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 31 Oct 2026 · 6 days
- Reference
ocds-h6vhtk-06f554
- Ends · in 4 days
Service Level Agreement to provide 12 months reactive defects cover
NHS Property Services Limited · NHS & health · North West England
Incumbent: Meel Group (projects) Limited
Service Level Agreement to provide 12 months reactive defects cover for Willowbank Lodge
- Published value
- £80k
- Annual run-rate
- £80kpublished value ÷ term, exc. VAT
- Term
- 1 Nov 2025 → 31 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-064e64
- Ends · in 4 days
Broad Oak Primary School Structural
St Helens Council · Local authority · North West England
Incumbent: EFT Construction Ltd
Broad Oak Primary School Structural Procurement.
- Published value
- £75k
- Annual run-rate
- —term under 6 months
- Term
- 1 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06e98b
- Ends · in 4 days
Provision for Lee Valley Caravan Park (Dobbs Weir) Play Area
Lee Valley Regional Park Authority · Other public body · East of England
Incumbent: ESP Play Ltd · Last contest: awarded 27% under the estimate
Lee Valley Regional Park Authority has a requirement for a new play area at Lee Valley Caravan Park (Dobbs Weir), Charlton Meadows, Essex Road, Hoddesdon, EN11 0AS. The play area will incorporate swings and activities for children up to the…
- Published value
- £73k
- Annual run-rate
- —term under 6 months
- Term
- 29 Sept 2026 → 31 Oct 2026 · 33 days
- Reference
ocds-h6vhtk-06911c
- Ends · in 4 days
Flood Defense Works
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: GKR MAINTENANCE & BUILDING CO. LTD
Contruction of Flood defenses at Willowford House
- Published value
- £71k
- Annual run-rate
- —term under 6 months
- Term
- 21 Sept 2026 → 31 Oct 2026 · 41 days
- Reference
ocds-h6vhtk-077c3f
- Ends · in 4 days
Replacement of Boardwalk
Spelthorne Borough Council · Local authority · Nationwide (UK)
Incumbent: Aquamaintain
This route is the main access to Dawsons Hall and is used daily by Cygnet Nursery, 1st Shepperton Girl Guides, and members of the public accessing Manor Park. The existing timber boardwalk forming the primary pedestrian access route to Daws…
- Published value
- £70k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06d15e
- Ends · in 4 days
Mill Street Footbridge Replacement
Devon County Council · Local authority · South West England
Incumbent: Polydeck Ltd
Mill Street Footbridge is a timber pedestrian footbridge located in Sidmouth, Devon. It has a clear width of 1.5 m and a span of approximately 12 m. A principal inspection of the structure has identified that the structure and ramp parapets…
- Published value
- £70k
- Annual run-rate
- £122kpublished value ÷ term, exc. VAT
- Term
- 7 Apr 2026 → 31 Oct 2026 · 7 months
- Reference
ocds-h6vhtk-0681ce
- Ends · in 4 days
Minor Aids & Adaptations
Chorley Council · Local authority · North West England
Incumbent: Preston Care and Repair Ltd
This tender is for the interim provision of Minor Adaptations (small-scale modifications made to a home) across the Chorley and South Ribble Council areas, which are crucial in enabling timely discharge from hospital, supporting post-discha…
- Published value
- £67kinc. VAT as published
- Annual run-rate
- £114kpublished value ÷ term, inc. VAT
- Term
- 1 Apr 2026 → 31 Oct 2026 · 7 months
- Reference
ocds-h6vhtk-0695ee
- Ends · in 4 days
Non-fire Door Supply & Installation
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Sword Logistics
Fit doors to offices with a Paxton wireless door handle (access control),as per the door schedule. The kitchen and toilets will be fitted with standard door handles. The contractor shall repair all damaged frames and paint the doors and fra…
- Published value
- £58k
- Annual run-rate
- £58kpublished value ÷ term, exc. VAT
- Term
- 30 Oct 2025 → 31 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-05d96f
- Ends · in 4 days
Kingfisher Roof Repairs and Scaffolding Removal
Babergh District Council · Local authority · East of England
Incumbent: T.H. MOSS AND SONS LIMITED
Removal of scaffolding and associated roof repairs to the Kingfisher building.
- Published value
- £55k
- Annual run-rate
- —term under 6 months
- Term
- 19 Oct 2026 → 31 Oct 2026 · 13 days
- Reference
ocds-h6vhtk-078aec
- Ends · in 4 days
Alma Street Culvert Replacement
Blaenau Gwent County Borough Council · Local authority · Wales (Cymru)
Incumbent: HORAN CONSTRUCTION LTD
Contract award to replace a damaged culvert at Alma Street
- Published value
- £55k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-07780f
- Ends · in 4 days
Collapsable Guardrail Installation
NHS Property Services Limited · NHS & health
Incumbent: SafeSite Limited
Collapsable Guardrail Installation at Altrincham Health and Wellbeing Centre
- Published value
- £51k
- Annual run-rate
- —term under 6 months
- Term
- 1 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06d13c
- Ends · in 4 days
Aberdare Park Tennis Court Resurfacing
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: Courtsall Services Ltd
Resurfacing of tarmacadam tennis courts, installation of 3no new nets, posts and sockets including painting of 3no new courts.
- Published value
- £50k
- Annual run-rate
- —term under 6 months
- Term
- 1 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-069207
- Ends · in 4 days
North Moor Water Feed
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · South West England
Incumbent: KEN MARSH LIMITED · Last contest: awarded at the estimate
Key Natural England Contact Philip Thorpe, Somerset Senior Reserve Manager, Tel - 07979119406 Email - philip.thorpe@naturalengland.org.uk Location of works: Wisteria Farm, Middlemoor Drove, Northmoor Corner, North Newton, Somerset. TA70BT. …
- Published value
- £50k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06ca87
- Ends · in 4 days
Canada Farm Meadows Rewetting
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · South West England
Incumbent: John porter · Last contest: awarded 2% under the estimate
Canada Farm Meadows are part of Shapwick Heath SSSI. They are an area of species-rich floodplain meadows on deep peat. It is designated for its species-rich grassland, breeding waders, and ditch fauna and flora. The ditches are in Unfavoura…
- Published value
- £48k
- Annual run-rate
- —term under 6 months
- Term
- 1 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06a809
- Ends · in 4 days
Vale House Extension Roof Works
Newcastle City Council · Local authority · North East England
Incumbent: Springs Roofing Ltd.
Newcastle City Council has appointed Springs Roofing Ltd to prepare, supply and install a new roof to the community room extension at Vale House, Lansdowne Gardens, Newcastle upon Tyne.
- Published value
- £44k
- Annual run-rate
- —term under 6 months
- Term
- 7 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06ed49
- Ends · in 4 days
MOT Station Steelwork extension
Newcastle City Council · Local authority · North East England
Incumbent: NORTHERN STRUCTURES LTD
Create a steel frame extension and allow for the installation of 4 new MOT inspection bays.
- Published value
- £41k
- Annual run-rate
- —term under 6 months
- Term
- 23 May 2026 → 31 Oct 2026 · 5 months
- Reference
ocds-h6vhtk-06ab71
- Ends · in 4 days
Council Chamber AV Works
London Borough of Waltham Forest · Local authority · Nationwide (UK)
Incumbent: CIVICO LTD
The Council is seeking to upgrade and enhance the existing audio-visual system within the Council Chamber. The works will build on the current system and infrastructure, improving its functionality, performance and resilience to better supp…
- Published value
- £40k
- Annual run-rate
- —term under 6 months
- Term
- 24 Sept 2026 → 31 Oct 2026 · 38 days
- Reference
ocds-h6vhtk-078ede
- Ends · in 4 days
Mon and Brecon Canal Vegetation Clearance Autumn 2026 Winter 2027
Newport City Council · Central government · Wales (Cymru)
Incumbent: Thomas Brothers Group Ltd
These works will form part of the restoration of the Monmouth and Brecon canal and will stretch from the canal in close proximity to the M4 bridge near Brickyard Lane (Allt Yr Yn) to the M4 Bridge at Malpas Junction 26 (Shaftesbury) and fro…
- Published value
- £40k
- Annual run-rate
- —term under 6 months
- Term
- 31 Aug 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06ec2c
- Ends · in 4 days
GRH Tower Block L1 Gap Analysis
GLOUCESTERSHIRE HOSPITALS SUBSIDIARY COMPANY LIMITED · Central government
Incumbent: STATIC SYSTEMS GROUP LTD
Fire Enforcement action point . L1 Alarm upgrade required – full system capacity not available but interim risk mitigation to incorporate ward bin stores & Tower stairwells agreed.
- Published value
- £39k
- Annual run-rate
- —term under 6 months
- Term
- 13 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06e30d
- Ends · in 4 days
North Baddesley Junior School - Drainage and Flooding Upgrade - Internal
Hampshire County Council · Local authority · South East England
Incumbent: T Coleborn & Son Ltd
Install new 150mm foul drainage line and inspection chambers (approx length 40lm) across school playing field to replace existing failing pitch fibre line. Invert level approx. 2.1m. Works to be commenced late October and completed during O…
- Published value
- £37k
- Annual run-rate
- —term under 6 months
- Term
- 12 Oct 2026 → 31 Oct 2026 · 20 days
- Reference
ocds-h6vhtk-0789c3
- Ends · in 4 days
Byker District Heating - replacement of heaters
Newcastle City Council · Local authority · North East England
Incumbent: SCHNEIDER ELECTRIC LIMITED
Replace 15 Heat meters to substation within the Byker District heat network.
- Published value
- £37k
- Annual run-rate
- £32kpublished value ÷ term, exc. VAT
- Term
- 1 Sept 2025 → 31 Oct 2026 · 1.2 yrs
- Reference
ocds-h6vhtk-055c8d
- Ends · in 4 days
THE PROVISION OF AIR CONDITIONING SYSTEM REPLACEMENT - THE KING CENTRE SERVICES IN RUTLAND
Rutland County Council · Local authority · East Midlands
Incumbent: ENVTEC SERVICES LIMITED
To provide a design, installation, and commissioning of a replacement air conditioning system for the existing system. The existing system is a VRV system, at the end of life and beyond economical repair.
- Published value
- £34k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06f732
- Ends · in 4 days
Fountain Square, Staple Hill - Refurbishment Project
South Gloucestershire Council · Local authority · South West England
Incumbent: Parsons Landscapes Limited
South Gloucestershire Council have arranged for a contractor to carry out hard and soft landscape construction works to refurbish Fountain Square, Staple Hill. To include removal of current street furniture and ground surface, supply and in…
- Published value
- £34k
- Annual run-rate
- —term under 6 months
- Term
- 17 Sept 2026 → 31 Oct 2026 · 1 month
- Reference
ocds-h6vhtk-077eed
- Ends · in 4 days
Resurfacing works
Lancaster City Council · Local authority
Incumbent: Abacus Playgrounds Ltd
Repairs to the surface at Regent Park
- Published value
- £33kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06d295
- Ends · in 4 daysExtension option · up to 31 Dec 2026
MDP Enabling Works 1 - Cable identification and heating pipes
The Royal Air Force Museum · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: McPhillips (Wellington) Limited
Investigation and enabling works to identify, expose, trace and remove redundant underground services within the Hangar 1 compound, including excavation, duct clearance, pipework and cable removal, gas main exposure and capping, and ground …
- Published value
- £32k
- Annual run-rate
- —term under 6 months
- Term
- 17 Aug 2026 → 31 Oct 2026 · 2 months · up to 31 Dec 2026 with extensions
- Reference
ocds-h6vhtk-0783d8
- Ends · in 4 days
Fencing Repair Works
Chesterfield Borough Council · Local authority · East Midlands
Incumbent: SDS Metalworks Ltd
Fencing repair works within chesterfield
- Published value
- £31k
- Annual run-rate
- —term under 6 months
- Term
- 13 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06ebff
- Ends · in 4 days
Enabling Works - Kettering General Hospital
West Northamptonshire Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Semilong Services Ltd
Enabling works at Kettering General Hospital, NN16 8UZ. The works are to be delivered by Semilong Services Limited under a contract with a recorded value of £28,999.22. The contract starts on 23 September 2026 and has a recorded end date of…
- Published value
- £29k
- Annual run-rate
- —term under 6 months
- Term
- 23 Sept 2026 → 31 Oct 2026 · 39 days
- Reference
ocds-h6vhtk-078c51
- Ends · in 4 days
OFAS - Flood Plain Meadows Partnership - Form C STA
Environment Agency · Central government
Incumbent: Flood Plain Meadows Partnership
Floodplain Meadows Partnership of The Open University to undertake survey, monitoring and analysis work relating to the MG4 (Lowland Meadow) Mitigation Strategy for the Oxford Flood Alleviation Scheme.
- Published value
- £29k
- Annual run-rate
- £49kpublished value ÷ term, exc. VAT
- Term
- 31 Mar 2026 → 31 Oct 2026 · 7 months
- Reference
ocds-h6vhtk-06d7a9
- Ends · in 4 days
Ventnor Youth Centre - Structural Repairs
Isle of Wight NHS Trust · Local authority · South East England
Incumbent: STONEHAM CONSTRUCTION LIMITED
Requirement of a substantial selection of masonry / stonework repairs to the buildings façade at the earliest opportunity (being an old brick and stone church)
- Published value
- £28k
- Annual run-rate
- —term under 6 months
- Term
- 17 Sept 2026 → 31 Oct 2026 · 1 month
- Reference
ocds-h6vhtk-078706
- Ends · in 4 days
CBC-2158-W-26261-SM Priory View Air Conditioning Repairs
Central Bedfordshire Council · Local authority
Incumbent: TSG Building Services plc
Award to remove, supply and install air conditioning to communal area of Priory View
- Published value
- £28k
- Annual run-rate
- —term under 6 months
- Term
- 20 Jul 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-077b09
- Ends · in 4 days
ESCC-TO-Herstmonceux Consultant Appointment
East Sussex County Council · Local authority
Incumbent: Frankham Consultancy Group Ltd
Herstmonceux section 106 works Consultant Appointment
- Published value
- £28k
- Annual run-rate
- £44kpublished value ÷ term, exc. VAT
- Term
- 16 Mar 2026 → 31 Oct 2026 · 8 months
- Reference
ocds-h6vhtk-067471
- Ends · in 4 days
Demolition
NOTTING HILL GENESIS · Other public body · Greater London
Incumbent: S.D. Installations Ltd
Demolition works
- Published value
- £27k
- Annual run-rate
- —term under 6 months
- Term
- 12 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-078208
- Ends · in 4 days
Walls & Ceilings
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Mosaic Property Management Ltd
Make good walls and ceilings paint with two coats of emulsion Paint all woodwork with undercoat and topcoat eggshell
- Published value
- £22k
- Annual run-rate
- £22kpublished value ÷ term, exc. VAT
- Term
- 30 Oct 2025 → 31 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-05d97c
- Ends · in 4 days
Jubilee Garden External Lighting Upgrade
Somerset NHS Foundation Trust · Central government · South West England
Incumbent: PURPLELUX LIGHTING SOLUTIONS LTD
Supply, installation, testing and commissioning of external and internal lighting equipment at the Jubilee Garden and adjacent areas, including bollard luminaires, wall-mounted fittings, recessed lighting, LED strip lighting, control gear, …
- Published value
- £21k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06ea5b
- Ends · in 4 days
Resurfacing works Pensby Clinic
Cheshire and Wirral Partnership NHS Foundation Trust · NHS & health · Nationwide (UK)
Incumbent: JAMES CALLAGHAN SONS & CO. LIMITED
RESURFACING WORKS & LINEMARKING AT PENSBY CLIINIC INCLUDING REBUILDING FRONT WALL PENSBY CLINIC
- Published value
- £16k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 31 Oct 2026 · 31 days
- Reference
ocds-h6vhtk-078586
- Ends · in 4 days
CP2842-26 [FWKORD0054] Kingsteignton Bridge Scaffolding
Devon County Council · Local authority · South West England
Incumbent: Marine & Civil Solutions Ltd
Devon County Council (DCC) has procured a Work Order under its Minor Engineering Works Framework 2026-30 under Lot 2 using the quotation procedure, in accordance with Section 10 of the Framework Information (Volume 2). The proposed project …
- Published value
- £15k
- Annual run-rate
- —term under 6 months
- Term
- 4 Sept 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06f319
- Ends · in 4 days
Test and Treatment of Water
CITY HOSPITALS INDEPENDENT COMMERCIAL ENTERPRISES LIMITED · Central government · North East England
Incumbent: Nalco Ltd
Envirox service proposal for chlorine dioxide treatment
- Published value
- £13k
- Annual run-rate
- £14kpublished value ÷ term, exc. VAT
- Term
- 12 Nov 2025 → 31 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-06597b
- Ends · in 4 days
Swanwick Lodge Secure Unit Replacement Ventilation Grilles & Vanity Unit Base
Hampshire County Council · Local authority · South East England
Incumbent: T Coleborn & Son Ltd
Swanwick Lodge is a secure children's home for extremely vulnerable children. The work required at the home includes replacement of corroded and blocked ventilation grilles in ensuites and other areas of the home; this isn't straight forwar…
- Published value
- £5k
- Annual run-rate
- —term under 6 months
- Term
- 12 Oct 2026 → 31 Oct 2026 · 20 days
- Reference
ocds-h6vhtk-0789b7
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.