Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 221–230
- Ends · in 49 days
Bath Property Development - Feasibility Study
Bath & North East Somerset Council · Local authority · South West England
Incumbent: MILLIGAN LIMITED
The council have a number of complex economic and environmental goals and have identified existing development sites as well placed to deliver against these objectives. The requirement is for a holistic review across all sites, identifying …
- Published value
- £162k
- Annual run-rate
- £214kpublished value ÷ term, exc. VAT
- Term
- 16 Mar 2026 → 16 Dec 2026 · 9 months
- Reference
ocds-h6vhtk-066df2
- Ends · in 50 days
Clinical Coding Resource
Mersey and West Lancashire Teaching Hospital NHS Trust · Central government · North West England
Incumbent: CEC Healthcare Coding Ltd
Temporary Clinical Coding resource for a 4-month period, to ensure minimal uncoded records for contractual reporting purposes.
- Published value
- £108k
- Annual run-rate
- —term under 6 months
- Term
- 18 Aug 2026 → 17 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06ea7b
- Ends · in 50 daysExtension option · up to 17 Jun 2027
Upavon Way place shaping study
Oxfordshire County Council · Local authority · South East England
Incumbent: WSP UK Limited
The Upavon Way (Carterton) place shaping study seeks to explore ways to enhance Upavon Way for non-motorised users of the space (including those walking, wheeling and cycling east/west and north/south and accessing bus stops). The need for …
- Published value
- £35k
- Annual run-rate
- £69kpublished value ÷ term, exc. VAT
- Term
- 18 Jun 2026 → 17 Dec 2026 · 6 months · up to 17 Jun 2027 with extensions
- Reference
ocds-h6vhtk-06bb07
- Ends · in 50 days
M&E Design for Electrical Heating and Domestic Hot Water services to Great Arthur House.
The Mayor and Commonalty and Citizens of the City of London · Local authority
Incumbent: David Miles and Partners Ltd
Mechanical and Electrical Design service for Great Arthur House for Electrical heating and domestic hot water.
- Published value
- £30kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 17 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06c959
- Ends · in 51 days
SILWE Conveyor coupling remediation
Nuclear Restoration Services Limited · Other public body
Incumbent: James McGowan Engineering Limited
To Inspect and replace Jaw Coupling Spider Elements together with jaw coupling for lead screw drive on the SILWE Transfer / Lifter module C20016 identified as damaged during installation of the pipe spacers to existing guide brackets.
- Published value
- £63k
- Annual run-rate
- £112kpublished value ÷ term, exc. VAT
- Term
- 27 May 2026 → 18 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-06bc49
- Ends · in 51 days
Professional Services for Contract Admin and Quantity Surveying
London South Bank University · Education · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Kendall Kingscott Limited
Professional services required: • Quantity Surveying services: to provide cost advice, regular cost reporting including an initial budget review on appointment, cost planning, the management of a works tender exercise, the provision of a te…
- Published value
- £54kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 18 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06c42d
- Ends · in 51 days
Woodrow Court stage 3 designs (engineering services)
Wandle Housing Association Limited · Charity · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: FLOH Consulting Ltd
Stage 3 designs and follow up testing and monitoring. Woodrow Court stage 3 designs (engineering services) for riser services.
- Published value
- £48k
- Annual run-rate
- £48kpublished value ÷ term, exc. VAT
- Term
- 19 Dec 2025 → 18 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-06a0c1
- Ends · in 51 days
Civil Engineering for St Catherine's Wood
Surrey Heath Borough Council · Local authority · South East England
Incumbent: Flood & Civil Ltd · Last contest: awarded at the estimate
For the Provision of drainage and construction design plans and the removal of planning notice conditions for the construction of a new Suitable Alternative Natural Greenspace at St Catherine’s Wood in Frimley, Surrey.
- Published value
- £45k
- Annual run-rate
- —term under 6 months
- Term
- 21 Sept 2026 → 18 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06ad35
- Estimated end · in 52 days
UKRI-2264 Statutory Inspections for Lifting Equipment, Pressure Systems and Local Exhaust Ventilation Systems at STFC
UK Research and Innovation · North East England, North West England, South East England, Scotland
Incumbent: SPEEDY ASSET SERVICES LIMITED · Last contest: 3 bids · awarded at the estimate
UK Research and Innovation’s (UKRI) Science and Technology Facilities Council (STFC) operates a number of large research facilities covering many areas of new and developing science and technology which incorporate many bespoke in-house des…
- Published value
- £850k
- Annual run-rate
- —start date not published
- Term
- Estimated end 19 Dec 2026 · start not published
- Reference
ocds-h6vhtk-037233
- Estimated end · in 52 daysCall-off
Supply and Maintenance of Fusemates
SOUTHERN ELECTRIC POWER DISTRIBUTION PLC · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 19 Dec 2026 · start not published
- Reference
ocds-h6vhtk-02874c
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,296 contracts and agreements end within 24 months, 3,304 in total · £791m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.