Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 241–250
- Ends · in 58 days
CSP25689
UK Space Agency · Central government · Nationwide (UK)
Incumbent: SAMCO Aircraft Maintenance BV
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition, this is due to the on going maintenance the supplier is doing.
- Published value
- £22k
- Annual run-rate
- —term under 6 months
- Term
- 25 Jul 2026 → 25 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-065b05
- Estimated end · in 59 daysCall-off
Contract Lifting Services
YORKSHIRE WATER SERVICES LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 26 Dec 2026 · start not published
- Reference
ocds-h6vhtk-02874b
- Ends · in 61 days
Structural Intrusive Survey at the Tropicana
North Somerset Council · Local authority · South West England
Incumbent: CRL SURVEYS LIMITED
The survey is to determine the strength, condition and material properties of existing structures, including the building, sea walls and plant room. The results are to support the design of the Tropicana refurbishment project and future mai…
- Published value
- £67k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 28 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-07915e
- Ends · in 61 daysExtension option · up to 27 Dec 2027
Lark Hill to Crab Hill Feasibility Study
Oxfordshire County Council · Local authority · South East England
Incumbent: Urban Movement LIMITED
Lark Hill to Crab Hill Pedestrian and Cycle Improvements Feasibility Study
- Published value
- £19k
- Annual run-rate
- —term under 6 months
- Term
- 22 Jul 2026 → 28 Dec 2026 · 5 months · up to 27 Dec 2027 with extensions
- Reference
ocds-h6vhtk-06dea8
- Estimated end · in 62 daysLinked to a framework or DPS
Built Environment
Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Perfect Circle JV Ltd · Last contest: 2 bids (0 SME)
- Published value
- £350mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0290e8
- Estimated end · in 62 daysLinked to a framework or DPS
Scape Built Environment Consultancy
Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Perfect Circle JV Ltd · Last contest: 2 bids (0 SME)
- Published value
- £350mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0290e8
- Estimated end · in 62 daysLinked to a framework or DPS
Infrastructure Consultancy
Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Perfect Circle JV Ltd · Last contest: 2 bids (0 SME)
- Published value
- £250mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0290e8
- Estimated end · in 62 daysLinked to a framework or DPS
Infrastructure Consultancy
Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Perfect Circle JV Ltd · Last contest: 2 bids (0 SME)
- Published value
- £250mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0290e8
- Estimated end · in 62 daysLinked to a framework or DPSPanel · 2 suppliers
Place Shaping
Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: MACE LTD, Perfect Circle JV Ltd · Last contest: 3 bids (0 SME)
Scape Procure Limited (Scape) wishes to establish a framework agreement for a four-year duration with an option to extend for a further two years. Experienced suppliers are invited to apply for three Lots covering built environment, infrast…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 29 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0290e8
- Estimated end · in 63 daysCall-off
Oil Testing and Analysis
UK POWER NETWORKS (OPERATIONS) LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 30 Dec 2026 · start not published
- Reference
ocds-h6vhtk-02874b
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,296 contracts and agreements end within 24 months, 3,304 in total · £791m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.