Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 241–250

  1. Ends · in 58 days

    CSP25689

    UK Space Agency · Central government · Nationwide (UK)

    Incumbent: SAMCO Aircraft Maintenance BV

    ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition, this is due to the on going maintenance the supplier is doing.

    Published value
    £22k
    Annual run-rate
    —term under 6 months
    Term
    25 Jul 2026 → 25 Dec 2026 · 5 months
    Reference
    ocds-h6vhtk-065b05
  2. Estimated end · in 59 daysCall-off

    Contract Lifting Services

    YORKSHIRE WATER SERVICES LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 26 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-02874b
  3. Ends · in 61 days

    Structural Intrusive Survey at the Tropicana

    North Somerset Council · Local authority · South West England

    Incumbent: CRL SURVEYS LIMITED

    The survey is to determine the strength, condition and material properties of existing structures, including the building, sea walls and plant room. The results are to support the design of the Tropicana refurbishment project and future mai…

    Published value
    £67k
    Annual run-rate
    —term under 6 months
    Term
    28 Sept 2026 → 28 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-07915e
  4. Ends · in 61 daysExtension option · up to 27 Dec 2027

    Lark Hill to Crab Hill Feasibility Study

    Oxfordshire County Council · Local authority · South East England

    Incumbent: Urban Movement LIMITED

    Lark Hill to Crab Hill Pedestrian and Cycle Improvements Feasibility Study

    Published value
    £19k
    Annual run-rate
    —term under 6 months
    Term
    22 Jul 2026 → 28 Dec 2026 · 5 months · up to 27 Dec 2027 with extensions
    Reference
    ocds-h6vhtk-06dea8
  5. Estimated end · in 62 daysLinked to a framework or DPS

    Built Environment

    Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Perfect Circle JV Ltd · Last contest: 2 bids (0 SME)

    • Architectural, construction, engineering and inspection services
    Published value
    £350mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 29 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-0290e8
  6. Estimated end · in 62 daysLinked to a framework or DPS

    Scape Built Environment Consultancy

    Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Perfect Circle JV Ltd · Last contest: 2 bids (0 SME)

    • Architectural, construction, engineering and inspection services
    Published value
    £350mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 29 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-0290e8
  7. Estimated end · in 62 daysLinked to a framework or DPS

    Infrastructure Consultancy

    Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Perfect Circle JV Ltd · Last contest: 2 bids (0 SME)

    • Architectural, construction, engineering and inspection services
    Published value
    £250mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 29 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-0290e8
  8. Estimated end · in 62 daysLinked to a framework or DPS

    Infrastructure Consultancy

    Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Perfect Circle JV Ltd · Last contest: 2 bids (0 SME)

    • Architectural, construction, engineering and inspection services
    Published value
    £250mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 29 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-0290e8
  9. Estimated end · in 62 daysLinked to a framework or DPSPanel · 2 suppliers

    Place Shaping

    Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: MACE LTD, Perfect Circle JV Ltd · Last contest: 3 bids (0 SME)

    Scape Procure Limited (Scape) wishes to establish a framework agreement for a four-year duration with an option to extend for a further two years. Experienced suppliers are invited to apply for three Lots covering built environment, infrast…

    • Architectural, construction, engineering and inspection services
    Published value
    £100mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 29 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-0290e8
  10. Estimated end · in 63 daysCall-off

    Oil Testing and Analysis

    UK POWER NETWORKS (OPERATIONS) LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 30 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-02874b

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,296 contracts and agreements end within 24 months, 3,304 in total · £791m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months396
  2. 3–6 months495
  3. 6–12 months530
  4. 12–24 months875

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.