Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 601–625
- Ends · in 48 days
2364 Spalding Active Travel
Lincolnshire County Council · Local authority · East Midlands
Incumbent: C R Reynolds Ltd
The project consists of improving the cycling and walking infrastructure along Pinchbeck Road between Kings Road and Enterprise Way in Spalding. The project also contains resurfacing along the full length of the works. There will be a signa…
- Published value
- £3.7minc. VAT as published
- Annual run-rate
- £7.3mpublished value ÷ term, inc. VAT
- Term
- 15 Jun 2026 → 15 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06cb89
- Ends · in 48 days
ENHT - Renal Home Therapies Refurbishment - Ventilation
East and North Hertfordshire Teaching NHS Trust · Central government
Incumbent: PARIAS CONSTRUCTIOPARIAS CONSTRUCTION & INTERIORS LIMITED
ENHT - Renal Home Therapies Refurbishment - Ventilation. procured via Tender.
- Published value
- £1.9m
- Annual run-rate
- —term under 6 months
- Term
- 16 Sept 2026 → 15 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-07744c
- Ends · in 48 days
Kilburn Library Re-Imagined Main Works
London Borough of Camden · Local authority · Greater London
Incumbent: Quinn (London) Limited
Works contract to undertake a full retrofit of the building across all floors, basement, ground and mezzanine level at Kilburn Library
- Published value
- £1.4m
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 15 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06b4f2
- Ends · in 48 days
East Locality - Berwick Hills Library - Conversion Works
Middlesbrough Council · Local authority · North East England
Incumbent: Tom Willoughby Ltd
Strip and full refurbishment of an existing unit previously used as a local library, adapting to provide new "Locality HUB for joint Council services" including all new finishes, new M & E installation and associated external works.
- Published value
- £986k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 15 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06eea4
- Ends · in 48 days
Garden Clearances & Fencing (short-term contract)
Rooftop Housing Group · Housing · West Midlands
Incumbent: APM TREES LIMITED
Rooftop Housing Association Limited have awarded a short-term contract to APM Trees Limited, instructing them to carry out garden clearance works and install approximately 187 metres of rear garden fencing. The works are necessary and urgen…
- Published value
- £43k
- Annual run-rate
- —term under 6 months
- Term
- 16 Sept 2026 → 15 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-07738f
- Ends · in 48 days
Guttering works at Charles Lister Court
Housing 21 · Central government · South East England
Incumbent: HGT Construction Ltd
Guttering works at Charles Lister Court (Housing 21).
- Published value
- £38k
- Annual run-rate
- —term under 6 months
- Term
- 15 Oct 2026 → 15 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-07891d
- Ends · in 48 days
Block 6 Refurb
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Sword Logistics
Extended to cover 2026 Months Prelims 1 Skips 1.25 H&S, F10 Coordinator 1 Toilet 1.25 Management 1.25 Labour & Cleaning 1 Consumble 1 Fencing
- Published value
- £17k
- Annual run-rate
- £17kpublished value ÷ term, exc. VAT
- Term
- 16 Dec 2025 → 15 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-05faa8
- Estimated end · in 49 daysFramework recordPanel · 9 suppliers
Building Fabric Maintenance and Minor Works Framework Agreement
University of Leicester · Education · East Midlands
Panel: Brown & Shaw (Builders) Ltd, Brown and Kirby Ltd, C. Henry & Sons Limited +6 more
- Published value
- £28mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 16 Dec 2026 · start not published
- Reference
ocds-h6vhtk-035414
- Ends · in 49 days
CAS-01050-L5L6H1 - Chawleigh CLT - Design and Build
Aster Group Limited · Other public body · South West England
Incumbent: Woofenden Construction Limited
Aster has a requirement for a ten dwellings development for social rent, at Chawleigh, Devon.
- Published value
- £2.7m
- Annual run-rate
- £2.1mpublished value ÷ term, exc. VAT
- Term
- 17 Sept 2025 → 16 Dec 2026 · 1.3 yrs
- Reference
ocds-h6vhtk-06b966
- Ends · in 49 days
Power Connection Costs - Erdington
West Midlands Combined Authority · Local authority · West Midlands
Incumbent: HIGH VOLTAGE SYSTEMS AND SERVICES LIMITED
Power connection costs for a site in Erdington, as part of the EV CATS project
- Published value
- £196k
- Annual run-rate
- —term under 6 months
- Term
- 14 Aug 2026 → 16 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06dd44
- Ends · in 49 days
009316 - Discovery Museum Gallery Refurbishment Works
Newcastle City Council · Local authority · North East England
Incumbent: RJL INTERIORS LTD
North-East Museum's requires a Principal Contractor to undertake refurbishment works within the Discovery Museum, Blandford House, Newcastle upon Tyne. The project involves the transformation of the existing "Working Lives Gallery" into a T…
- Published value
- £190k
- Annual run-rate
- £283kpublished value ÷ term, exc. VAT
- Term
- 16 Apr 2026 → 16 Dec 2026 · 8 months
- Reference
ocds-h6vhtk-065b9a
- Ends · in 49 days
Totton, Whitchurch and Basingstoke Rewire and Associated works
South Central Ambulance Service NHS Foundation Trust · Central government · South East England
Incumbent: VISION DESIGN LIMITED
Replacement of all existing wiring, circuit boards and RCD protection. Upgraded sockets,and emergency lighting systems. Installation of LED lighting,
- Published value
- £83k
- Annual run-rate
- £125kpublished value ÷ term, exc. VAT
- Term
- 17 Apr 2026 → 16 Dec 2026 · 8 months
- Reference
ocds-h6vhtk-069058
- Ends · in 49 days
BCU-STA-63383 - ACB's Electrical Systems Improvement at YGC
BETSI CADWALADR UNIVERSITY HEALTH BOARD · Central government · Wales (Cymru)
Incumbent: ABB Limited
Betsi Cadwaladr University Health Board requires a suitably qualified and experienced contractor to undertake the minimum requirements in order to provide replacement ACB’s in two Low Voltage (LV) substations.
- Published value
- £41k
- Annual run-rate
- —term under 6 months
- Term
- 27 Jul 2026 → 16 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-078a20
- Ends · in 50 days
Supply and fit of Communal Doors
Livv Maintenance Limited (part of Livv Housing Group) · Housing · North West England
Incumbent: Security Surveillance Systems Ltd (T/A SS Group Ltd)
Livv Housing Group sought bids from contractors for the supply and fit of communal doors following surveys.
- Published value
- £546k
- Annual run-rate
- £546kpublished value ÷ term, exc. VAT
- Term
- 18 Dec 2025 → 17 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-06595d
- Ends · in 50 days
The Provision of Clearance of 4 SLIP
Submarine Delivery Agency · Central government
Incumbent: Gilpin Demolition Ltd
Clearance of debris on 4SLIP within HMNB Devonport
- Published value
- £71k
- Annual run-rate
- £75kpublished value ÷ term, exc. VAT
- Term
- 8 Jan 2026 → 17 Dec 2026 · 11 months
- Reference
ocds-h6vhtk-0601cd
- Ends · in 50 days
Porth Community School Boiler Upgrade
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: Westlink Mechanical Services Ltd
Porth Community School Boiler Upgrade 2026
- Published value
- £49k
- Annual run-rate
- —term under 6 months
- Term
- 23 Sept 2026 → 17 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-077c29
- Estimated end · in 51 daysFramework recordPanel · 4 suppliers
Provision of Repairs & Voids Works Framework
ateb Housing Group Ltd · Housing · Wales (Cymru)
Panel: CARDO (WALES & WEST) LIMITED, PROPERTY BUILDING MAINTENANCE (WALES) LIMITED, W.B. Griffiths & Son Ltd. +1 more
- Published value
- £9.0mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 18 Dec 2026 · start not published
- Reference
ocds-h6vhtk-03ecc7
- Ends · in 51 days
Durham Bus Station - Cladding and Associated Works
Durham County Council · Local authority · North East England
Incumbent: Willmott Dixon Construction Limited
Durham Bus Station - Re-Cladding and Associated Works (002242)
- Published value
- £2.6m
- Annual run-rate
- £5.1mpublished value ÷ term, exc. VAT
- Term
- 15 Jun 2026 → 18 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-069230
- Ends · in 51 daysExtension option · up to 30 Jun 2027
The Brook Multi Storey Car Park Demolition Works
Medway Council · Local authority · South East England
Incumbent: M & M Demolition Co. Ltd · Last contest: awarded 14% under the estimate
Demolition of an existing 6 storey multi-storey Car parking with associated service removal/diversion and waterproofing/making good of remaining structures. The Contract will be for an initial period of 6 months with an option to extend for…
- Published value
- £1.3m
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 18 Dec 2026 · 5 months · up to 30 Jun 2027 with extensions
- Reference
ocds-h6vhtk-067198
- Ends · in 51 days
Adnewyddu Canolfan Ieuenctid Afon Taf Afon Taff Youth Centre Refurbishment
Merthyr Tydfil County Borough Council · Local authority · Wales (Cymru)
Incumbent: ACE BUILDING CONTRACTORS (WALES) LTD · Last contest: awarded 17% over the estimate
Mae Cyngor Bwrdeistref Sirol Merthyr Tudful wedi cwblhau contract ar gyfer adnewyddu Canolfan Ieuenctid Afon Taf. Merthyr Tydfil County Borough Council has concluded a contract for the refurbishment of Afon Taff Youth Centre.
- Published value
- £1.3m
- Annual run-rate
- £2.2mpublished value ÷ term, exc. VAT
- Term
- 19 May 2026 → 18 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-05f0d8
- Ends · in 51 days
Neptune Health Park, UCAP_260357 Ventilation Replacement
NHS Property Services Limited · NHS & health
Incumbent: William Gough & Sons Limited
Neptune Health Park, UCAP_260357 Ventilation Replacement
- Published value
- £810k
- Annual run-rate
- —term under 6 months
- Term
- 9 Nov 2026 → 18 Dec 2026 · 40 days
- Reference
ocds-h6vhtk-078374
- Ends · in 51 days
Boroughwide Replacement of Cold Water Communal Tanks (Ph.8)
London Borough of Wandsworth · Local authority
Incumbent: T Brown Group Ltd
Replacement of cold water storage cisterns in local authority residential blocks (Phase 8). Please refer to tender documents for full information.
- Published value
- £639k
- Annual run-rate
- —not computed
- Term
- 22 Jun 2026 → 18 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06af38
- Ends · in 51 days
C76 Durranhill Viaduct C1045 - Remedial Works (Phase 2)
Cumberland Council · Local authority · North West England
Incumbent: Metcalfe Plant Hire Limited
Cumberland Council are progressing a scheme to undertake the remedial works at Durranhill Viaduct. This project is to be let as a construction contract with Contractor designed elements.
- Published value
- £495k
- Annual run-rate
- —term under 6 months
- Term
- 17 Aug 2026 → 18 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06f6bf
- Ends · in 51 days
Ince Clinic Roof & Compartmentation at Ince Health and Community Centre
NHS Property Services Limited · NHS & health
Incumbent: Amspec Limited
Ince Clinic Roof & Compartmentation at Ince Health and Community Centre
- Published value
- £475k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 18 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-0779b2
- Ends · in 51 daysExtension option · up to 18 Dec 2027
Boatyard Bath Road - Fire Rated Cable Enclosure System
Clarion Housing Property Development Service Limited · Other public body
Incumbent: Kemwell Fire International Limited
Installation of Fire rated cable enclosure system at The Boatyard scheme at Bath Road in Bristol.
- Published value
- £393kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 8 Sept 2026 → 18 Dec 2026 · 3 months · up to 18 Dec 2027 with extensions
- Reference
ocds-h6vhtk-06f33d
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.