Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 21–30
- Estimated end · in 147 days
Contract
Procurement and Logistics Service · Nationwide (UK), Northern Ireland
Incumbent: J P CORRY · Last contest: 2 bids (0 SME) · awarded 25% under the estimate
Supply of Oriented Strandboard Type 3 (OSB3)
- Published value
- £158k
- Annual run-rate
- —start date not published
- Term
- Estimated end 23 Mar 2027 · start not published
- Reference
ocds-h6vhtk-042e3c
- Estimated end · in 151 days
NAC/5110 Biomass Boiler Operation, Maintenance and Fuel Supply for North Ayrshire Sites
North Ayrshire Council · Local authority · Scotland
Incumbent: AMP Clean Energy Services Ltd · Last contest: 1 bid (1 SME) · awarded 13% over the estimate
This Framework Agreement is for the provision of services of operation including supply of fuel and maintenance of existing biomass boiler installations at 19 sites across North Ayrshire with the provision to add additional sites as require…
- Published value
- £4.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 27 Mar 2027 · start not published
- Reference
ocds-h6vhtk-038622
- Ends · in 155 days
Supply of Biomass Pellets
Aberdeenshire Council · Local authority · Scotland
Incumbent: Puffin Pellets Ltd · Last contest: 2 bids (2 SME)
the supply and delivery of biomass chips and pellets to various premises for a 3 year period with option to extend by 12 months.
- Published value
- £2.5m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04266c
- Ends · in 155 days
Fish Counter Systems on Rivers Laxford and Deveron
Scottish Government · Scotland
Incumbent: Fishtek · Last contest: 2 bids (2 SME)
The Scottish Ministers invite tenders for the purchase of two hydroacoustic (sonar) fish counting systems. Working with the Atlantic Salmon Trust and local stakeholders, these will subsequently be installed in the River Deveron and the Rive…
- Published value
- £367k
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02f7a3
- Ends · in 155 days
Supply of Biomass Chips & Associated Services
Aberdeenshire Council · Local authority · Scotland
Incumbent: Scot Heating Company Ltd · Last contest: 2 bids (2 SME)
The supply and delivery of biomass chips to Aberdeenshire Council premises. The contract includes the supply and delivery of the chips, the removal and disposal of ash and the cleaning of biomass hoppers, chip stores and boiler plant rooms.…
- Published value
- £269k
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04fa3f
- Ends · in 155 days
Catering - Greenworks Coffee
Liverpool University Hospitals NHS Foundation Trust · Central government
Incumbent: Greenworks Coffee
Greenworks Coffee spend - Catering
- Published value
- £250k
- Annual run-rate
- £250kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0699fa
- Ends · in 155 days
Tree Planting Sundries
South Gloucestershire Council · Local authority · South West England
Incumbent: Tudor (UK) Ltd t/a Tudor Environmental
South Gloucestershire Council have procured the supply of tree planting sundries such as biodegradable guards, untreated support stakes and biodegradable mulch mats for the new woodland creation at Leigh Farm.
- Published value
- £93k
- Annual run-rate
- £178kpublished value ÷ term, exc. VAT
- Term
- 22 Sept 2026 → 31 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-077ef2
- Ends · in 155 days
Grounds Maintenance
Dorchester Parish Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: BGG Garden and Tree Care LTd
Service of works to maintain the grounds for Dorchester parish council which inlcude, recreation ground, Cemetery, Closed Churchyard, War Memorial, footpaths and verges as specified in schedules of works.
- Published value
- £52k
- Annual run-rate
- £26kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2025 → 31 Mar 2027 · 2 yrs
- Reference
ocds-h6vhtk-0582b4
- Ends · in 155 days
Woodchip Supply
Mid Devon District Council · Local authority · South West England
Incumbent: CJ Parish & Sons
Supply of woodchip to property of Mid Devon District Council.
- Published value
- £40k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 1 Oct 2025 → 31 Mar 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-05d70f
- Estimated end · in 164 daysFramework recordPanel · 6 suppliers
HM/R030– Supply and Delivery of Timber Materials, Wetwall and Insulations
Hillcrest · Scotland
Panel: Joinery & Timber Creations (65) Limited, MGM TIMBER (SCOTLAND) LIMITED, MKM Building Supplies (DUNDEE) +3 more
- Published value
- Not publishedlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 9 Apr 2027 · start not published
- Reference
ocds-h6vhtk-043773
When contracts end · Agricultural, farming, fishing, forestry i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
93 contracts and agreements end within 24 months, 162 in total · £17m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.