Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 21–30

  1. Estimated end · in 29 days

    Supply of Vessel

    Shetland Islands Council · Local authority · Scotland

    Incumbent: Parkol Marine Engineering Ltd. · Last contest: 2 bids (2 SME) · awarded 1% under the estimate

    Tenders were sought from interested parties to supply to Shetland Islands Council a new vessel in accordance with the Specification of Requirements and in the timescale detailed in the Invitation to Tender documents. The requirement was for…

    • Ships and boats
    Published value
    £5.6m
    Annual run-rate
    —start date not published
    Term
    Estimated end 25 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-0497d7
  2. Ends · in 29 days

    Volvo Vehicle Parts

    Tyne and Wear Fire and Rescue Authority · Police & fire · North East England

    Incumbent: Volvo Group UK Limited T/A Renault Trucks UK

    Supply of genuine Volvo vehicle parts.

    Published value
    £79k
    Annual run-rate
    £79kpublished value ÷ term, exc. VAT
    Term
    25 Nov 2025 → 25 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-05e731
  3. Estimated end · in 30 days

    Supply of One Pre-Owned Aircraft

    Orkney Islands Council · Local authority · Scotland

    Incumbent: Cormack Aircraft Services Ltd · Last contest: 4 bids (4 SME) · awarded 38% over the estimate

    Orkney Islands Council has a requirement for the acquisition of a pre-owned Britten Norman BN2B-26 aircraft to extend the existing network to enhance services to the north isles communities inter-island air services.

    • Piloted aircraft
    Published value
    £550k
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-05e606
  4. Estimated end · in 30 days

    Brize Norton Passenger Baggage Handling

    Ministry of Defence · Central government · South East England

    Incumbent: Robson Handling Technology Ltd · Last contest: 2 bids (2 SME)

    The Authority has awarded a contract for a one off requirement for modernisation of the baggage handling hall in the terminal at RAF Brize Norton. The requirement includes provision of technical design services, supply, management and insta…

    • Baggage-handling equipment
    Published value
    £229k
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-04ad08
  5. Ends · in 30 days

    Barometer Upgrade for Drifting Buoys

    Met Office · Central government · Nationwide (UK)

    Incumbent: Scripps Institution of Oceanography (UC San Diego)

    A three-quote procurement process was undertaken for the acquisition of barometer upgrades for SIO Iridium-SVP drifting buoys, to support Surface Observations Operations. Of the 3 known suppliers in the market only one supplier was able to …

    Published value
    £31k
    Annual run-rate
    —term under 6 months
    Term
    4 Sept 2026 → 26 Nov 2026 · 3 months
    Reference
    ocds-h6vhtk-06f9f3
  6. Estimated end · in 32 days

    838 - e-Powertrain Test Cell Equipment Supply and Installation

    ASTON UNIVERSITY · Education · West Midlands

    Incumbent: Horiba UK Limited · Last contest: 4 bids · awarded at the estimate

    The College of Engineering and Physical Sciences (EPS) at Aston University is seeking to acquire an e-motor test system for durability and functionality testing of electric motors for electric vehicles (EVs) following standard and no-standa…

    • Electric vehicles
    Published value
    £500k
    Annual run-rate
    —start date not published
    Term
    Estimated end 28 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-04071c
  7. Ends · in 34 days

    Cadw Interpretive Signage Contract

    Llywodraeth Cymru / Welsh Government · Wales (Cymru)

    Incumbent: Fielder Green Associates · Last contest: 1 bid (1 SME)

    • Signage
    Published value
    £349k
    Annual run-rate
    £91kpublished value ÷ term, exc. VAT
    Term
    30 Jan 2023 → 30 Nov 2026 · 3.8 yrs
    Reference
    ocds-h6vhtk-038a69
  8. Ends · in 34 days

    Cadw Interpretive Signage Contract

    Llywodraeth Cymru / Welsh Government · Wales (Cymru)

    Incumbent: Fielder Green Associates · Last contest: 1 bid (1 SME)

    This is a contract award notice following the publication of a Voluntary ex-ante Transparency Notice on 02/12/2022 which received no formal interest. The contract will cover the design, manufacture and installation of interpretive signage a…

    • Signage
    Published value
    £349k
    Annual run-rate
    £91kpublished value ÷ term, exc. VAT
    Term
    30 Jan 2023 → 30 Nov 2026 · 3.8 yrs
    Reference
    ocds-h6vhtk-038a69
  9. Ends · in 34 days

    Cadw Interpretive Signage Contract

    Llywodraeth Cymru / Welsh Government · Wales (Cymru)

    Incumbent: Fielder Green Associates · Last contest: 1 bid (1 SME)

    • Signage
    Published value
    £200k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-038a69
  10. Ends · in 34 days

    Cadw Interpretive Signage Contract

    Llywodraeth Cymru / Welsh Government · Wales (Cymru)

    Incumbent: Fielder Green Associates · Last contest: 1 bid (1 SME)

    • Signage
    Published value
    £200k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-038a69

When contracts end · Transport equipment and products
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

576 contracts and agreements end within 24 months, 944 in total · £200m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months69
  2. 3–6 months122
  3. 6–12 months198
  4. 12–24 months187

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.