Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 311–320

  1. Ends · in 64 days

    Principal Bridge Inspections 2026-27 - South Lakes and Barrow Area

    Westmorland and Furness Council · Local authority · North West England

    Incumbent: WSP UK Limited

    Westmorland and Furness Council has procured a contract for Consultancy services to undertake the Principal Bridge Inspections of 10 bridges in the South Lakes and Barrow area and complete a Principal Bridge Inspection report for each bridg…

    Published value
    £39kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    21 Oct 2026 → 31 Dec 2026 · 2 months
    Reference
    ocds-h6vhtk-078a95
  2. Ends · in 64 daysExtension option · up to 31 Mar 2027

    Thetford Campus Project Design Team & Architectural Services

    Breckland District Council · Local authority · East of England

    Incumbent: LSI Architects (Design) Limited

    Appointment of a suitably qualified design team and architectural services

    Published value
    £38k
    Annual run-rate
    £75kpublished value ÷ term, exc. VAT
    Term
    1 Jul 2026 → 31 Dec 2026 · 6 months · up to 31 Mar 2027 with extensions
    Reference
    ocds-h6vhtk-06b4a1
  3. Ends · in 64 days

    Waste Services Option Evaluation

    Dover District Council · Local authority · South East England

    Incumbent: Eunomia Research & Consulting Ltd.

    Award of contract for a Consultant to undertake a Waste Services Options Evaluation on behalf of Dover District Council (DDC) and Folkestone & Hythe District (FHDC)

    Published value
    £37kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    18 Jul 2026 → 31 Dec 2026 · 5 months
    Reference
    ocds-h6vhtk-06cdaa
  4. Ends · in 64 days

    Architect Design Services Phase 3 Training Block

    The Police and Crime Commissioner for Warwickshire · Police & fire · West Midlands

    Incumbent: Sutton Cox Architects Limited

    The Police & Crime Commissioner for Warwickshire has awarded a contract for architect design services for Phase 3 project at Warwickshire Police's Leek Wootton site. This is a below threshold direct award following an internal exemption pro…

    Published value
    £37k
    Annual run-rate
    £32kpublished value ÷ term, exc. VAT
    Term
    5 Nov 2025 → 31 Dec 2026 · 1.2 yrs
    Reference
    ocds-h6vhtk-05daca
  5. Ends · in 64 daysExtension option · up to 31 Dec 2027

    Infrastructure Delivery Plan Support

    Swindon Borough Council · Local authority · South West England

    Incumbent: Troy Hayes Planning Limited

    The Planning Policy team are in the process of preparing a new Local Plan which will replace the current Local Plan 2026. The Infrastructure Delivery Plan (IDP) will serve an important part of the emerging Swindon Local Plan 2043's evidence…

    Published value
    £37k
    Annual run-rate
    —not computed
    Term
    14 Jul 2026 → 31 Dec 2026 · 6 months · up to 31 Dec 2027 with extensions
    Reference
    ocds-h6vhtk-06ce35
  6. Ends · in 64 days

    Planning Consultancy

    Basingstoke and Deane Borough Council · Local authority · South East England

    Incumbent: Gillings Planning

    Town planning input into the preparation and management of a planning application.

    Published value
    £36k
    Annual run-rate
    £21kpublished value ÷ term, exc. VAT
    Term
    10 Apr 2025 → 31 Dec 2026 · 1.8 yrs
    Reference
    ocds-h6vhtk-050067
  7. Ends · in 64 days

    GSHP system design at Arclid Court, Congleton

    Plus Dane Housing Limited · Other public body · North West England

    Incumbent: Kensa Contracting Limited

    Designer to confirm viability and cost of installation of GSHP system at Arclid Court, Congleton.

    Published value
    £35kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    3 Aug 2026 → 31 Dec 2026 · 5 months
    Reference
    ocds-h6vhtk-06d9d6
  8. Ends · in 64 days

    Local Plan Review - Further Water Cycle Study

    Braintree District Council · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: ARCADIS CONSULTING (UK) LIMITED

    Further Water Cycle Study work to support Local Plan

    Published value
    £35k
    Annual run-rate
    —term under 6 months
    Term
    1 Sept 2026 → 31 Dec 2026 · 4 months
    Reference
    ocds-h6vhtk-06ee28
  9. Ends · in 64 days

    Principal Bridge Inspections 2026-27 -Eden Area

    Westmorland and Furness Council · Local authority · North West England

    Incumbent: WSP UK Limited

    Westmorland and Furness Council has procured a contract for Consultancy services to undertake the Principal Bridge Inspections of 12 bridges in the Eden area and complete a Principal Bridge Inspection report for each bridge

    Published value
    £34kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    21 Oct 2026 → 31 Dec 2026 · 2 months
    Reference
    ocds-h6vhtk-078a8d
  10. Ends · in 64 days

    Alaw Primary School PV

    Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)

    Incumbent: EFS Systems (UK) LTD

    Alaw Primary School PV 2026

    Published value
    £34k
    Annual run-rate
    —term under 6 months
    Term
    22 Jul 2026 → 31 Dec 2026 · 5 months
    Reference
    ocds-h6vhtk-06dd89

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,296 contracts and agreements end within 24 months, 3,304 in total · £791m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months396
  2. 3–6 months495
  3. 6–12 months530
  4. 12–24 months875

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.