Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 331–340

  1. Estimated end · in 280 days

    EV Charging Point and Back-Office Infrastructure

    Platform Housing Limited · West Midlands

    Incumbent: AMP EV Limited · Last contest: 14 bids · awarded 17% under the estimate

    We are seeking the supply and fit of Electric Charging Point Hardware in our two Offices (Worcester and Solihull), a number of Home Chargers in our Staff Homes, and a back-office software to support. In addition to this we also require an O…

    • Electric vehicles
    Published value
    £500k
    Annual run-rate
    —start date not published
    Term
    Estimated end 3 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03dbe2
  2. Estimated end · in 282 days

    Contract

    Translink · Northern Ireland

    Incumbent: CONNSWATER GRAPHICS LIMITED · Last contest: 6 bids (1 SME) · awarded 29% over the estimate

    Translink have a requirement for a company to provide a service to supply a range of transfers and vinyls primarily for the bus and train fleets and also have the capability to produce design options. Your response must be submitted via the…

    • Signage
    Published value
    £450k
    Annual run-rate
    —start date not published
    Term
    Estimated end 5 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-034740
  3. Ends · in 283 daysExtension option · up to 5 Aug 2028

    Appliance Graphics

    Kent and Medway Towns Fire Authority · Police & fire · South East England

    Incumbent: Bluelite Graphics Ltd · Last contest: awarded 20% over the estimate

    Kent Fire and Rescue have awarded a contract for the installation of graphics across its fleet of vehicles. The contract period is for 2 years with an option to extend for a further 12 months. The contract will allow for initial installatio…

    Published value
    £30k
    Annual run-rate
    £15kpublished value ÷ term, exc. VAT
    Term
    7 Aug 2025 → 6 Aug 2027 · 2 yrs · up to 5 Aug 2028 with extensions
    Reference
    ocds-h6vhtk-0505b4
  4. Ends · in 284 daysExtension option · up to 7 Aug 2028

    CLIP Electronic Communication Network(ECN) Harnesses

    Transport for London · Other public body · Nationwide (UK)

    Incumbent: HARTING LIMITED

    CLIP Electronic Communication Network(ECN) Harnesses (assembly of cables) for 12 train sets

    Published value
    £549k
    Annual run-rate
    £275kpublished value ÷ term, exc. VAT
    Term
    8 Aug 2025 → 7 Aug 2027 · 2 yrs · up to 7 Aug 2028 with extensions
    Reference
    ocds-h6vhtk-055e9a
  5. Ends · in 286 days

    PAN3534 - Supply of 2 x Mini Diggers

    Leicester City Council · Local authority · East Midlands

    Incumbent: Ben Burgess & Co LTD · Last contest: awarded 11% over the estimate

    This project is to replace existing vehicle currently used by the Bereavement Services Team of the Council with vehicle more specific to the needs of the service. The vehicle will have exceeded the scheduled replacement date by the time of …

    Published value
    £71k
    Annual run-rate
    £71kpublished value ÷ term, exc. VAT
    Term
    10 Aug 2026 → 9 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-06738a
  6. Ends · in 288 days

    Cl172/0/1 C10 Overhaul Job - Brake Raft Overhaul

    WM TRAINS LIMITED · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Wabtec UK Limited

    The C10 Overhaul Heavy Maintenance programme is due in 2026 to be performed on the Angel Class 172/0/1 fleet currently on a dry lease with WM Trains. As such, heavy maintenance arrangements are the responsibility of WM Trains and some of th…

    Published value
    £619k
    Annual run-rate
    £619kpublished value ÷ term, exc. VAT
    Term
    12 Aug 2026 → 11 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-06d811
  7. Estimated end · in 289 daysPanel · 2 suppliers

    Flying Scotsman Immersive Experience

    Science Museum Group · Yorkshire and the Humber

    Panel: Figment Productions, SARNER INTERNATIONAL LIMITED · Last contest: 8 bids (8 SME)

    Immersive experiences have been at the core of the Science Museum Group's (SMG) commercial offer for many years. We currently operate a suite of simulators, motion theatres and virtual reality lounges in our museums. The purpose of these ex…

    • Simulators
    Published value
    £530k
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 12 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-02ed8a
  8. Ends · in 297 daysExtension option · up to 20 Aug 2031Buyer plans to re-tender 3 Mar 2031

    Lot 6. Metal Decorative Bollards

    DfI Transport and Road Asset Management (TRAM) · Central government

    Incumbent: PWS Ireland Ltd

    Supply and Delivery of Traffic Cones, Barrier Boards, Bollards and Associated Traffic (6 Lots) Management Equipment

    Published value
    £185k
    Annual run-rate
    £185kpublished value ÷ term, exc. VAT
    Term
    21 Aug 2026 → 20 Aug 2027 · 1 yr · up to 20 Aug 2031 with extensions
    Reference
    ocds-h6vhtk-067200
  9. Ends · in 297 daysExtension option · up to 20 Aug 2031Buyer plans to re-tender 3 Mar 2031

    Lot 3 - Delineator Posts and Retro Reflectors

    DfI Transport and Road Asset Management (TRAM) · Central government

    Incumbent: PWS Ireland Ltd

    Supply and Delivery of Traffic Cones, Barrier Boards, Bollards and Associated Traffic (6 Lots) Management Equipment

    Published value
    £155k
    Annual run-rate
    £156kpublished value ÷ term, exc. VAT
    Term
    21 Aug 2026 → 20 Aug 2027 · 1 yr · up to 20 Aug 2031 with extensions
    Reference
    ocds-h6vhtk-067200
  10. Ends · in 297 daysExtension option · up to 20 Aug 2031Buyer plans to re-tender 3 Mar 2031

    Lot 1 - Traffic Cones and Cylinders, Linked Pedestrian Barrier Board System and Hazard Warning Tape

    DfI Transport and Road Asset Management (TRAM) · Central government

    Incumbent: CID Trading Limited

    Supply and Delivery of Traffic Cones, Barrier Boards, Bollards and Associated Traffic (6 Lots) Management Equipment

    Published value
    £130k
    Annual run-rate
    £130kpublished value ÷ term, exc. VAT
    Term
    21 Aug 2026 → 20 Aug 2027 · 1 yr · up to 20 Aug 2031 with extensions
    Reference
    ocds-h6vhtk-067200

When contracts end · Transport equipment and products
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

576 contracts and agreements end within 24 months, 944 in total · £200m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months69
  2. 3–6 months122
  3. 6–12 months198
  4. 12–24 months187

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.