Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 12 months
Showing 351–360
- Ends · in 64 days
Tamar Bridge and Torpoint Ferry Technical Support Contract
Cornwall Council · Local authority · South West England
Incumbent: AECOM LIMITED · Last contest: 3 bids (1 SME)
Award of the Tamar Bridge and Torpoint Ferry Technical Support Contract
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 31 Dec 2026 · start not published
- Reference
ocds-h6vhtk-034132
- Ends · in 64 days
Appointment of a Construction Multi-Disciplinary Professional Services Team to transform National Museums Liverpool’s International Slavery Museum & Maritime Museum
National Museums Liverpool · North West England
Incumbent: RIDGE AND PARTNERS LLP · Last contest: 8 bids (0 SME)
National Museums Liverpool (NML) is seeking to appoint a Construction Multi-Disciplinary Professional Services Team, who can provide External Project Manager services, Quantity Surveyor services, BIM Manager services and CDM Advisor service…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 31 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0365fb
- Ends · in 65 days
EHDC 1125 THE PROVISION OF STRATEGIC FLOOD RISK ASSESSMENT
East Hertfordshire District Council · Local authority · East of England
Incumbent: Jeremy Benn Associates Ltd
AWARD East Herts District Council are currently seeking quotes for the provision of a strategic flood risk assessment. The quotation documents can be accessed from the "My Tenders" area of the Supply Hertfordshire website and selecting the …
- Published value
- £26k
- Annual run-rate
- £25kpublished value ÷ term, exc. VAT
- Term
- 16 Dec 2025 → 1 Jan 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-05f7c5
- Ends · in 65 days
Strategic Planning - Water Cycle Study 2025
Southend-on-Sea City Council · Local authority · East of England
Incumbent: Wallingford Hydrosolutions Ltd
Southend-on-Sea City Council requires a concise and user-friendly Water Cycle Study with clear outputs and recommendations. The study area is the local authority administrative area. The study will test the potential impact of Southend loca…
- Published value
- £23k
- Annual run-rate
- £25kpublished value ÷ term, exc. VAT
- Term
- 4 Feb 2026 → 1 Jan 2027 · 11 months
- Reference
ocds-h6vhtk-064d20
- Ends · in 65 days
Nestuda Way and Eastwoodbury Lane Feasibility Study
Southend-on-Sea City Council · Local authority · East of England
Incumbent: Pell Frischmann Consultants Ltd
Southend-on-Sea City Council sought a contractor for a feasibility study that will identify, assess and promote deliverable options for network capacity enhancements on Nestuda Way and Eastwoodbury Lane. The study will support funding appli…
- Published value
- £18k
- Annual run-rate
- £21kpublished value ÷ term, exc. VAT
- Term
- 17 Feb 2026 → 1 Jan 2027 · 10 months
- Reference
ocds-h6vhtk-0654a2
- Estimated end · in 66 daysCall-off
RWM703 Site Characterisation Interpretation Support Framework
Radioactive Waste Management Limited · Nationwide (UK)
Incumbent: British Geological Survey · Last contest: 10 bids
RWM703 Site Characterisation Interpretation Support Framework
- Published value
- £5.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 2 Jan 2027 · start not published
- Reference
ocds-h6vhtk-03638a
- Estimated end · in 66 daysCall-offPanel · 3 suppliers
Lot 1: The design, manufacture, testing and delivery of outdoor single phase and three phase pole mounted distribution transformers in the range 16kVA to 315kVA
Northern Ireland Electricity Networks Limited · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: Hitachi Energy Ireland Limited, Kyte Powertech Limited, Toshiba International (Europe) Ltd · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 2 Jan 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Ends · in 66 days
In-Building Services Agreement at 3 Copper Square
Sheffield Hallam University · Education · Greater London
Incumbent: SAVILLS MANAGEMENT RESOURCES LIMITED
Savills has been requested by Sheffield Hallam University to provide certain in-building M&E and Security services on a short-term basis at 3 Copper Square, Brent Cross, London NW2 1BY for a term of 6-months. Services include (per annum bas…
- Published value
- £176kinc. VAT as published
- Annual run-rate
- £350kpublished value ÷ term, inc. VAT
- Term
- 3 Jul 2026 → 2 Jan 2027 · 6 months
- Reference
ocds-h6vhtk-0780d2
- Ends · in 66 days
Architect & Design Works at Little Hay Golf Course
Dacorum Borough Council · Local authority · East of England
Incumbent: Kyle Smart Associates Limited
Architect & Design Works at Little Hay Golf Course following a fire
- Published value
- £83k
- Annual run-rate
- £105kpublished value ÷ term, exc. VAT
- Term
- 23 Mar 2026 → 2 Jan 2027 · 9 months
- Reference
ocds-h6vhtk-067a0f
- Ends · in 68 days
Structural Surveys
Greensquareaccord · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: J D L CONSULTANTS LIMITED
Required to carry out Structural Surveys to properties identified by Project Surveyors, DLO Surveyors and other areas of the business as required. Produce clear reports on findings and scope works as required following the survey across loc…
- Published value
- £21k
- Annual run-rate
- £30kpublished value ÷ term, exc. VAT
- Term
- 23 Apr 2026 → 4 Jan 2027 · 8 months
- Reference
ocds-h6vhtk-0690d3
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,297 contracts and agreements end within 24 months, 3,306 in total · £791m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,66945Construction work2,10872IT services: consulting, software, internet1,62760Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.