- Ends · in 262 days
Middleham Bridge Arch Repair
The North Yorkshire Council · Local authority · Yorkshire and the Humber
Incumbent: Wilf Noble Construction & Plant Hire Limited
NEC4 contract Direct award to Wilf Noble Construction Ltd for the emergency repair of the damaged arch at Middleham Bridge, Middleham, North Yorkshire. The works comprise temporary support and scaffolding, dismantling and removal of unstabl…
- Published value
- £90k
- Annual run-rate
- £107kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 16 Jul 2027 · 10 months
- Reference
ocds-h6vhtk-077fe6
- Estimated end · in 263 daysFramework recordPanel · 8 suppliers
HV Maintenance, Cable Faults & Protection
SSE PLC · Nationwide (UK), Scotland, Northern Ireland
Panel: Enerveo Limited, H&MV Engineering Ltd, Lagan Power Engineering Ltd +5 more
- Published value
- £8.0mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 17 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03a31e
- Ends · in 263 daysExtension option · up to 17 Oct 2027
INVITATION TO TENDER (ITT) for the provision of Replacement Lift at the Town Hall Hereford
Herefordshire Council · Local authority · West Midlands
Incumbent: MORRIS VERMAPORT LIMITED · Last contest: awarded 18% under the estimate
Herefordshire Council is seeking to appoint a contractor to carry out the design and build for a replacement lift at the Town Hall, St. Owens Street, Hereford
- Published value
- £98k
- Annual run-rate
- £98kpublished value ÷ term, exc. VAT
- Term
- 18 Jul 2026 → 17 Jul 2027 · 1 yr · up to 17 Oct 2027 with extensions
- Reference
ocds-h6vhtk-06a7f4
- Estimated end · in 264 daysFramework recordPanel · 87 suppliers
National Contractor Framework
Alder Hey Children's NHS Foundation Trust · NHS & health · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: A.BUCKLER HAULAGE LIMITED, AR Demolition Ltd, Aptus Construction Ltd +84 more
- Published value
- £8.0bnpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 18 Jul 2027 · start not published
- Reference
ocds-h6vhtk-038daf
- Ends · in 264 days
Homes England - Broad Marsh - Demolition of College & NCP
Homes England (the name adopted by the Homes and Communities Agency) · Other public body · East Midlands
Incumbent: DSM Demolition
Appointment of a demolition contractor for the demolition of the College (site 1) and NCP (site 2) at Broadmarsh. This was procured via lot 5 of the Pagabo demolition and land remediation framework.
- Published value
- £3.2m
- Annual run-rate
- £3.6mpublished value ÷ term, exc. VAT
- Term
- 2 Sept 2026 → 18 Jul 2027 · 11 months
- Reference
ocds-h6vhtk-07798e
- Ends · in 265 days
MD26028 - Renewal of Septic Tank Plant - Courtenay Cottages, Washfield
Mid Devon District Council · Local authority · South West England
Incumbent: WCI Group Ltd · Last contest: awarded 8% over the estimate
Removal and disposal of old treatment plant / Supply & install new treatment plant in new location.
- Published value
- £59k
- Annual run-rate
- £59kpublished value ÷ term, exc. VAT
- Term
- 20 Jul 2026 → 19 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-067fad
- Ends · in 268 days
Relocation of Modular Units to Weobley High School
Herefordshire Council · Local authority · West Midlands
Incumbent: S C Joseph Ltd · Last contest: awarded 6% under the estimate
Herefordshire Council invites tenders for the removal of an existing single-storey mobile building and the relocation, installation, and associated reconfiguration of a two-storey modular building at Weobley High School. The works include d…
- Published value
- £236k
- Annual run-rate
- £235kpublished value ÷ term, exc. VAT
- Term
- 22 Jul 2026 → 22 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06aea3
- Ends · in 269 days
Honilands School Main Water Pipe Works
London Borough of Enfield · Local authority · Greater London
Incumbent: Thames Water Utilities Ltd
To relocate the main water supply of Honilands school to new location as school request, including ground works, supplying pipes, new meter installation and making good and dispose of waste.
- Published value
- £16k
- Annual run-rate
- £16kpublished value ÷ term, exc. VAT
- Term
- 24 Jul 2026 → 23 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06d9d1
- Estimated end · in 271 daysPanel · 4 suppliers
BBU2 (Banff and Buchan 2)
Aberdeenshire Council · Local authority · Scotland
Panel: Dennis Gordon Electrical, Heatcare Oil & Gas Ltd, NSB Contracting Ltd +1 more · Last contest: 4 bids (4 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Electrical Work. The project will involve working to a strict priority timeline and ensuring excellent communication skill…
- Published value
- £3.9m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Jul 2027 · start not published
- Reference
ocds-h6vhtk-050cc0
- Estimated end · in 271 daysPanel · 4 suppliers
BCHN (Buchan)
Aberdeenshire Council · Local authority · Scotland
Panel: Dennis Gordon Electrical, Heatcare Oil & Gas Ltd, NSB Contracting Ltd +1 more · Last contest: 4 bids (4 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Electrical Work. The project will involve working to a strict priority timeline and ensuring excellent communication skill…
- Published value
- £3.3m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Jul 2027 · start not published
- Reference
ocds-h6vhtk-050cc0
- Estimated end · in 271 daysPanel · 4 suppliers
GRCH (Garioch)
Aberdeenshire Council · Local authority · Scotland
Panel: Heatcare Oil & Gas Ltd, Hosie Electrical Contracting Limited, NUCORE GROUP LTD +1 more · Last contest: 4 bids (4 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Electrical Work. The project will involve working to a strict priority timeline and ensuring excellent communication skill…
- Published value
- £2.2m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Jul 2027 · start not published
- Reference
ocds-h6vhtk-050cc0
- Estimated end · in 271 daysPanel · 4 suppliers
MAR 1 (Marr North)
Aberdeenshire Council · Local authority · Scotland
Panel: Heatcare Oil & Gas Ltd, Hosie Electrical Contracting Limited, NUCORE GROUP LTD +1 more · Last contest: 4 bids (4 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Electrical Work. The project will involve working to a strict priority timeline and ensuring excellent communication skill…
- Published value
- £1.8m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Jul 2027 · start not published
- Reference
ocds-h6vhtk-050cc0
- Estimated end · in 271 daysPanel · 4 suppliers
KMRN ( Kincardine and Mearns)
Aberdeenshire Council · Local authority · Scotland
Panel: Heatcare Oil & Gas Ltd, Hosie Electrical Contracting Limited, NUCORE GROUP LTD +1 more · Last contest: 5 bids (5 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Electrical Work. The project will involve working to a strict priority timeline and ensuring excellent communication skill…
- Published value
- £1.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Jul 2027 · start not published
- Reference
ocds-h6vhtk-050cc0
- Estimated end · in 271 daysPanel · 4 suppliers
FOR 2 (Formartine South)
Aberdeenshire Council · Local authority · Scotland
Panel: Heatcare Oil & Gas Ltd, Hosie Electrical Contracting Limited, NUCORE GROUP LTD +1 more · Last contest: 4 bids (4 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Electrical Work. The project will involve working to a strict priority timeline and ensuring excellent communication skill…
- Published value
- £1.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Jul 2027 · start not published
- Reference
ocds-h6vhtk-050cc0
- Estimated end · in 271 daysPanel · 4 suppliers
MAR 2 ( Marr South )
Aberdeenshire Council · Local authority · Scotland
Panel: Heatcare Oil & Gas Ltd, Hosie Electrical Contracting Limited, NUCORE GROUP LTD +1 more · Last contest: 4 bids (4 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Electrical Work. The project will involve working to a strict priority timeline and ensuring excellent communication skill…
- Published value
- £985k
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Jul 2027 · start not published
- Reference
ocds-h6vhtk-050cc0
- Estimated end · in 271 daysPanel · 3 suppliers
FOR 1 (Formartine North)
Aberdeenshire Council · Local authority · Scotland
Panel: Heatcare Oil & Gas Ltd, NSB Contracting Ltd, Procast Building Contractors Ltd. · Last contest: 3 bids (3 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Electrical Work. The project will involve working to a strict priority timeline and ensuring excellent communication skill…
- Published value
- £754k
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Jul 2027 · start not published
- Reference
ocds-h6vhtk-050cc0
- Ends · in 271 days
A feasibility study on achieving passive environments for document storage within the Norfolk Record Office - S510849
Norfolk County Council · Local authority
Incumbent: Hoare Lea LLP
A feasibility study on achieving passive environments for document storage within the Norfolk Record Office - S510849 £40000.00
- Published value
- £40k
- Annual run-rate
- £20kpublished value ÷ term, exc. VAT
- Term
- 9 Jul 2025 → 25 Jul 2027 · 2.1 yrs
- Reference
ocds-h6vhtk-0562d0
- Ends · in 272 days
Cleator Moor Community Hub and Town Square Public Realm Works
Cumberland Council · Local authority · North West England
Incumbent: Story Contracting Limited
A new Community Hub is to be created by the construction of a new-build annexe to join the existing Library and Council offices on Cleator Moor Town Square. The new-build annexe will house a café / restaurant area with a new, commercial kit…
- Published value
- £4.2m
- Annual run-rate
- £4.2mpublished value ÷ term, exc. VAT
- Term
- 28 Jul 2026 → 26 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06e3bc
- Ends · in 272 days
Hanger Testing and Replacement Scheme
Humber Bridge Board · Other public body · Nationwide (UK), Yorkshire and the Humber
Incumbent: Spencer
The Scheme is to ascertain the remaining service life of the existing Humber Bridge cable hangers. It involves the supply of two new hangers to replace two existing hangers; and to subsequently conduct destructive testing on the removed han…
- Published value
- £846k
- Annual run-rate
- £847kpublished value ÷ term, exc. VAT
- Term
- 27 Jul 2026 → 26 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-0687c5
- Estimated end · in 273 daysFramework recordPanel · 8 suppliers
Minor Works Contractor Framework 2025 to 2027
Leeds City Council · Local authority · Yorkshire and the Humber
Panel: Bethell Construction Ltd, Britcon (UK) Limited, C R Reynolds Ltd +5 more
Re-procurement plannedYORbuild4 Minor Works Contractors Framework Agreement West Area · tender expected
- Published value
- £100mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 27 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04d4fb
- Estimated end · in 273 daysPanel · 4 suppliers
BBU (Banff and Buchan 1)
Aberdeenshire Council · Local authority · Scotland
Panel: Dennis Gordon Electrical, Heatcare Oil & Gas Ltd, NSB Contracting Ltd +1 more · Last contest: 4 bids (4 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Electrical Work. The project will involve working to a strict priority timeline and ensuring excellent communication skill…
- Published value
- £1.9m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 27 Jul 2027 · start not published
- Reference
ocds-h6vhtk-050cc0
- Ends · in 274 daysExtension option · up to 28 Jul 2028
UKRI-6109 1894 Building Strip Out and Fabric Enabling Works 1
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Navigate Scaffolding Ltd · Last contest: awarded at the estimate
UKRI STFC appointed a supplier to provide 1894 building strip out and fabric enabling works at the Royal Observatory in Edinburgh.
- Published value
- £1.2m
- Annual run-rate
- £1.2mpublished value ÷ term, exc. VAT
- Term
- 29 Jul 2026 → 28 Jul 2027 · 1 yr · up to 28 Jul 2028 with extensions
- Reference
ocds-h6vhtk-06c828
- Estimated end · in 275 daysFramework recordPanel · 50 suppliers
Carmarthenshire Property Works Framework
Carmarthenshire County Council · Local authority · Wales (Cymru)
Panel: A and J Landscapes & Property Maintenance, ASW Property Services Limited, Alyn Bowen Limited +47 more
**THIS IS A FRAMEWORK AWARD NOTICE, NOT A CONTRACT OPPORTUNITY** Carmarthenshire County Council has appointed suitably qualified Contractors to deliver responsive maintenance (including emergency works ordered during normal working hours an…
Re-procurement plannedCarmarthenshire Construction Professional Services Framework · tender expected
- Published value
- £160mlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 29 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03e3ee
- Ends · in 275 days
Gun Wharf Refurbishment Works
Medway Council · Local authority · South East England
Incumbent: Apex Contractors Ltd · Last contest: awarded at the estimate
Refurbishment of Medway Council offices at Gun Wharf, comprising new offices, meeting spaces, a council chamber, canteen and reception areas, toilets, windows/doors and inner courtyards together with associated mechanical and electrical wor…
- Published value
- £15m
- Annual run-rate
- £13mpublished value ÷ term, exc. VAT
- Term
- 18 May 2026 → 29 Jul 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-05ec3e
- Ends · in 275 days
Burial Contract
London Borough of Enfield · Local authority · Greater London
Incumbent: Neil curtis & sons funeral contractors limited
The service requirement includes excavation of new graves, re-opening of existing graves, grave preparation and dressing prior to funeral arrival, shoring, soil management, backfilling/closing graves, grave top-ups and ashes interments.
- Published value
- £200kinc. VAT as published
- Annual run-rate
- £200kpublished value ÷ term, inc. VAT
- Term
- 30 Jul 2026 → 29 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06de2f
- Ends · in 275 days
construction costs
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: The Barnes Group Limited
1582 - Ward C8: Abortive construction costs following scheme postponement
- Published value
- £37k
- Annual run-rate
- £37kpublished value ÷ term, exc. VAT
- Term
- 30 Jul 2026 → 29 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06d751
- Estimated end · in 276 daysLinked to a framework or DPS
Lot 1 - Lower 0 - 10m GBP
Scape Procure Scotland Ltd · Scotland
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 30 Jul 2027 · start not published
- Reference
ocds-h6vhtk-0444fe
- Estimated end · in 276 daysLinked to a framework or DPS
Lot 2 - Lower 0 - 10m GBP
Scape Procure Scotland Ltd · Scotland
Incumbent: Kier Construction Ltd
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 30 Jul 2027 · start not published
- Reference
ocds-h6vhtk-0444ff
- Estimated end · in 276 daysLinked to a framework or DPS
Lot 3 - Upper 7.5m GBP plus
Scape Procure Scotland Ltd · Scotland
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 30 Jul 2027 · start not published
- Reference
ocds-h6vhtk-044500
- Estimated end · in 276 daysLinked to a framework or DPS
Lot 4 - Upper 7.5m GBP plus
Scape Procure Scotland Ltd · Scotland
Incumbent: McLaughlin & Harvey Construction Limited
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 30 Jul 2027 · start not published
- Reference
ocds-h6vhtk-044501
- Ends · in 276 days
Hope School Relocation Main Works
Wigan Council · Local authority · North West England
Incumbent: Conlon Construction Limited · Last contest: awarded at the estimate
Wigan Council are seeking to procure the main construction works for the relocation of Hope School and College to the Central Park Site, Montrose Avenue, Wigan. The school is a SEND school for severe learning difficulties and profound and c…
- Published value
- £18m
- Annual run-rate
- £20mpublished value ÷ term, exc. VAT
- Term
- 7 Sept 2026 → 30 Jul 2027 · 11 months
- Reference
ocds-h6vhtk-056700
- Ends · in 276 days
Milford Haven Public Transport Interchange
Pembrokeshire County Council · Local authority · Wales (Cymru)
Incumbent: Balfour Beatty Rail Ltd (a1 a4 a5 a6 a7 a9 a10 a11 a12 b1 b2 b3 b4 b5 b6 b7 c1 c2 c3 c4 c5 c6 c7 d1 d2 d3 d4) · Last contest: awarded 42% under the estimate
The scheme involves improvement works to the existing Milford Haven train station to create a new public transport interchange. This involves the relocation of the existing rail platform to allow for the provision of a new bus interchange, …
- Published value
- £7.8m
- Annual run-rate
- £6.6mpublished value ÷ term, exc. VAT
- Term
- 27 May 2026 → 30 Jul 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-052147
- Ends · in 276 days
Gassiot House 1st Floor Refurbishment
Guy's and St Thomas' NHS Foundation Trust · Central government · Nationwide (UK), Greater London
Incumbent: T&B Contractors Limited
Gassiot House 1st Floor Refurbishment works (D&B).
- Published value
- £3.0m
- Annual run-rate
- £2.8mpublished value ÷ term, exc. VAT
- Term
- 10 Jul 2026 → 30 Jul 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-06e8e4
- Ends · in 276 days
Stepaside
COASTLINE DESIGN AND BUILD LIMITED · Other public body · South West England
Incumbent: Restormel Building Contractors Ltd
Construction of 9 Affordable homes and associated infrastructure.
- Published value
- £1.9minc. VAT as published
- Annual run-rate
- £1.5mpublished value ÷ term, inc. VAT
- Term
- 23 Apr 2026 → 30 Jul 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-05f02b
- Ends · in 276 days
NKDC 25B Southgate
North Kesteven District Council · Local authority · East Midlands
Incumbent: BuildManager Construction
Building and landscaping renovations to 25B Southgate, Sleaford
- Published value
- £385k
- Annual run-rate
- £386kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 30 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06bf7c
- Estimated end · in 277 daysFramework recordPanel · 5 suppliers
Scape Regional Construction Framework
Scape Procure Limited (trading as SCAPE) · Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: G F Tomlinson Building Limited, Jeakins Weir Limited, LINDUM GROUP LIMITED +2 more
- Published value
- £750mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-02b929
- Estimated end · in 277 daysCall-off
Lot 6 - South West £0 - £10m
Scape Procure Limited (trading as SCAPE) · Nationwide (UK), East of England
Incumbent: Conamar Building Services Limited
- Published value
- £38mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-02ea2a
- Estimated end · in 277 daysCall-off
Lot 7 - South East £0 - £10m
Scape Procure Limited (trading as SCAPE) · Nationwide (UK), East of England
Incumbent: Clegg Construction Limited
- Published value
- £38mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-02ea2a
- Estimated end · in 277 daysCall-off
South East; Projects from 0 Up to a value of £10,000,000.
Scape Procure Limited (trading as SCAPE) · Nationwide (UK), East of England
Incumbent: R.G. Carter Cambridge Limited
- Published value
- £38mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-02ea2a
- Estimated end · in 277 daysCall-off
South West; Projects from 0 Up to a value of £10,000,000.
Scape Procure Limited (trading as SCAPE) · Nationwide (UK), East of England
Incumbent: Ashe Construction Limited
The BBC uses social publishing to help inform, educate and entertain our audiences across BBC News, Sport, iPlayer, Sounds and a range of other areas. In total, the BBC has hundreds of social media accounts to promote services, engage and e…
- Published value
- £38mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-02ea2a
- Ends · in 277 days
Housing Maintenance - Project 1
Welwyn Hatfield Borough Council · Local authority · East of England
Incumbent: Gracelands Complete Maintenance Services Limited · Last contest: 19 bids (19 SME)
Welwyn Hatfield Borough Council is seeking tenders for planned works on the inside of council properties. Including Kitchens, Bathroom and Electrics
- Published value
- £28m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-0486d5
- Ends · in 277 daysFramework record
Framework for the Survey, Design, Supply, Install, Remove, Recondition and/ or Store of Stairlifts and Associated Works in the Community.
Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Active Solutions - Sports Physio Limited
- Published value
- £3.2mlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04d083
- Ends · in 277 days
PRN25043 (PF23-044) Killynure Green
Choice Housing Ireland Limited · Other public body · Northern Ireland
Incumbent: Michael Donaghy (Painting & Decorating Contractor) Limited · Last contest: awarded at the estimate
Choice wish to appoint a suitably experienced contractor to complete works to stop water ingress and condensation along with extensive redecoration works. Please read tender documents for full description of the works.
- Published value
- £1.1minc. VAT as published
- Annual run-rate
- £1.3mpublished value ÷ term, inc. VAT
- Term
- 21 Sept 2026 → 31 Jul 2027 · 10 months
- Reference
ocds-h6vhtk-05d342
- Ends · in 277 days
Shaft Headworks Concrete Cutting & Removal
Nuclear Restoration Services Limited · Other public body
Incumbent: Core Cut Ltd
The scope of the Shaft Headworks, also referred to as the ‘Works’ is to cut and remove all sections of the cover and capping slabs that overhang and thereby reduce the clear opening of the Shaft, including the overhanging permanent formwork…
- Published value
- £853k
- Annual run-rate
- £1.0mpublished value ÷ term, exc. VAT
- Term
- 1 Oct 2026 → 31 Jul 2027 · 10 months
- Reference
ocds-h6vhtk-0774c4
- Ends · in 277 daysFramework recordPanel · 2 suppliers
Framework for Vertical Through-Floor Lifts
Durham County Council · Local authority · North East England
Panel: GLC PROJECTS LTD, Sirius Demolition
- Published value
- £800klargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04d3f1
- Ends · in 277 days
Rose Meadow, Dane Valley Urban Woodland
Cheshire west and Chester Borough Council · Local authority · North West England
Incumbent: Dunkil Developments limited
Rose Meadow, Dane Valley Urban Woodland-Landscaping works.
- Published value
- £696k
- Annual run-rate
- £348kpublished value ÷ term, exc. VAT
- Term
- 31 Jul 2025 → 31 Jul 2027 · 2 yrs
- Reference
ocds-h6vhtk-0565b3
- Ends · in 277 days
Lift Replacement Works
Delta Housing Limited · Other public body · Nationwide (UK)
Incumbent: Apex Lift & Escalator Engineers Limited
Replacement of three existing hydraulic passenger lifts with electric traction MRL lifts
- Published value
- £421k
- Annual run-rate
- £391kpublished value ÷ term, exc. VAT
- Term
- 3 Jul 2026 → 31 Jul 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-06c308
- Ends · in 277 daysPanel · 2 suppliers
Proposed Car Park and Culvert Construction, George Street, Teignmouth
Teignbridge District Council · Local authority · South West England
Panel: PRIME BUILD SOUTH WEST LTD, Weaver Demolition Ltd
• Replacement of existing stone culvert with new piped culvert. • Construction of new car park. • Construction of new junction / footway. • Construction and installation of landscaping and fencing. • Remedial works to existing stone boundar…
- Published value
- £369k
- Annual run-rate
- —panel, not one supplier
- Term
- 23 Feb 2026 → 31 Jul 2027 · 1.4 yrs
- Reference
ocds-h6vhtk-05a9b8
- Ends · in 277 daysCall-off
survey, design, supply, install, remove, recondition re-siting and/ or store of External Platform Lifts and associated works in the Community
Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Sirius Demolition · Last contest: 2 bids
This Framework is for the survey, design, supply, install, remove, recondition re-siting and/ or store of External Platform Lifts and associated works in the Community. The scope of lifts currently delivered encompasses External Platform Li…
- Published value
- £350kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04d47b
- Ends · in 277 daysCall-off
survey, design, supply, install, remove, recondition re-siting and/ or store of External Platform Lifts and associated works in the Community
Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: GLC PROJECTS LTD · Last contest: 2 bids
This Framework is for the survey, design, supply, install, remove, recondition re-siting and/ or store of External Platform Lifts and associated works in the Community. The scope of lifts currently delivered encompasses External Platform Li…
- Published value
- £350kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04d47b
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.