Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,851–1,900
- Ends · in 277 days
Asphalt Preservation
Via East Midlands LTD · Other public body · East Midlands
Incumbent: Velocity UK Ltd
Preparational patching and asphalt preservation works. Asphalt preservation works (2026), all in accordance with the 'Via East Midlands Lot 6 Asphalt Preservation 2025/26 Project Brief' and 'Dynamic Purchasing Information Pack' (2023). Spec…
- Published value
- £340k
- Annual run-rate
- £340kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 31 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06d05b
- Ends · in 277 days
CALM PEACEPLUS River Restoration Works on Scotstown River – Phase 1
Armagh City Banbridge and Craigavon Borough Council · Local authority
Incumbent: CivCo Limited · Last contest: awarded 19% over the estimate
Armagh City, Banbridge, and Craigavon Borough Council is a partner on the CALM Project with Lead Partner- East Border Region (EBR), Agri-Food and Biosciences Institute, Inland Fisheries Ireland, the Loughs Agency and Ulster University. The …
- Published value
- £298k
- Annual run-rate
- £298kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 31 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06b6bb
- Ends · in 277 days
Secure Room Alterations
Financial Conduct Authority · Other public body · Greater London
Incumbent: OPEC Construction Ltd
Minor construction project to internal walls and doors.
- Published value
- £250k
- Annual run-rate
- £250kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 31 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06e3ec
- Ends · in 277 days
Burley Recreation Ground – Pump Track
City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber
Incumbent: Architrail Velosolutions UK Ltd
The City of Bradford Metropolitan District Council (The Council) required a suitably qualified and experienced Contractor to provide new pump track at Burley / Iron Row Recreation Ground, York Road, Burley In Wharfedale, LS29 7DH. This will…
- Published value
- £183k
- Annual run-rate
- £123kpublished value ÷ term, exc. VAT
- Term
- 2 Feb 2026 → 31 Jul 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-060a6f
- Ends · in 277 daysExtension option · up to 31 Jul 2028
Diseworth Property Flood Resilience
Leicestershire County Council · Local authority · East Midlands
Incumbent: Whitehouse Construction Co. Limited · Last contest: awarded 18% under the estimate
Property Flood Resilience (PFR) measures to be designed and installed to up to nineteen residential properties in Diseworth, Leicestershire.
- Published value
- £123k
- Annual run-rate
- £119kpublished value ÷ term, exc. VAT
- Term
- 20 Jul 2026 → 31 Jul 2027 · 1 yr · up to 31 Jul 2028 with extensions
- Reference
ocds-h6vhtk-069fe0
- Ends · in 277 days
Barton Footbridge Strengthening
The North Yorkshire Council · Local authority
Incumbent: PBS Construction (North East) Limited
Barton Footbridge Strengthening Works
- Published value
- £118k
- Annual run-rate
- £128kpublished value ÷ term, exc. VAT
- Term
- 31 Aug 2026 → 31 Jul 2027 · 11 months
- Reference
ocds-h6vhtk-078287
- Ends · in 277 days
Cadent Gas Diversionary Works
City of Doncaster Council · Local authority · Yorkshire and the Humber
Incumbent: Cadent Gas Limited
Diversion of Cadent Gas Infrastructure required resulting from the highway alterations on the Greens Way Project
- Published value
- £109k
- Annual run-rate
- £80kpublished value ÷ term, exc. VAT
- Term
- 23 Mar 2026 → 31 Jul 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-067132
- Estimated end · in 278 days
DIHD24007 - Meiklefield Ph2 - New Build Development.
The Highland Council · Local authority · Scotland
Incumbent: Morrison Construction · Last contest: 5 bids (0 SME)
34no New build development & associated civils works.
- Published value
- £6.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 1 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0606b6
- Ends · in 278 days
Section 10 inspections Epping Forest Reservoirs
The Mayor and Commonalty and Citizens of the City of London · Local authority
Incumbent: Stillwater Associates Ltd
Section 10 inspections Epping Forest Reservoirs - increase PO 1125109 to an additional £11,600.00 (total order - £21,600)
- Published value
- £176kinc. VAT as published
- Annual run-rate
- £92kpublished value ÷ term, inc. VAT
- Term
- 1 Sept 2025 → 1 Aug 2027 · 1.9 yrs
- Reference
ocds-h6vhtk-0782de
- Ends · in 278 days
Sewage Treatment System Replacement and Relocation
Devon County Council · Local authority · South West England
Incumbent: PREMIER WATER SOLUTIONS 10 LTD
Sewage treatment system replacement and relocation. Supply and install a compact NH4P0 package wastewater treatment plant, connected to highway drainage conveying treated effluent discharge to an appropriate watercourse.
- Published value
- £41k
- Annual run-rate
- £35kpublished value ÷ term, exc. VAT
- Term
- 4 Jun 2026 → 1 Aug 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-06883b
- Estimated end · in 279 daysFramework recordPanel · 3 suppliers
Landscape Planting & Establishment Works including Highways Environments Framework for Hampshire
Hampshire County Council · Local authority · South East England
Panel: Ainsty Timber Marketing Limited trading as ATM, Blakedown Landscapes (SE) Limited, Scandor Landscape Contractors Ltd
- Published value
- £4.5mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 2 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03a116
- Ends · in 279 days
Priory Surgery Holywood
Department Health · Central government
Incumbent: Bavan Contracts
Single storey extension at front and side to accommodate new treatment room and extended plantroom. Upgrade of M&E and ICT Infrastructure. Internal reconfiguration and partial refurbishment.
- Published value
- £1.1m
- Annual run-rate
- £1.1mpublished value ÷ term, exc. VAT
- Term
- 3 Aug 2026 → 2 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-06af02
- Ends · in 279 days
Brighton Lift Replacement
The Police & Crime Commissioner for Sussex · Police & fire · South East England
Incumbent: Unite Lift Services Ltd
Replacement and associated works to replace lift at Brighton John Street Police Station
- Published value
- £158k
- Annual run-rate
- £168kpublished value ÷ term, exc. VAT
- Term
- 24 Aug 2026 → 2 Aug 2027 · 11 months
- Reference
ocds-h6vhtk-06ac32
- Ends · in 279 days
Cleveland Health Centre - Right-hand Lift Replacement
NHS Property Services Limited · NHS & health
Incumbent: UK LIFT AND ESCALATOR COMPANY LTD
Contract for Cleveland Health Centre - Right-hand Lift Replacement
- Published value
- £150k
- Annual run-rate
- —term under 6 months
- Term
- 17 May 2027 → 2 Aug 2027 · 3 months
- Reference
ocds-h6vhtk-0782d7
- Ends · in 282 days
Shirley Skatepark Works
Southampton City Council · Local authority · South East England
Incumbent: SCHOFIELD GROUNDWORKS LIMITED
The proposed works comprise the refurbishment and enhancement of the existing Shirley Ponds Skatepark through extensive groundworks, site regrading and reinforced concrete construction. A key feature of the scheme is the retention of the ex…
- Published value
- £255k
- Annual run-rate
- £255kpublished value ÷ term, exc. VAT
- Term
- 6 Aug 2026 → 5 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-06de18
- Estimated end · in 283 days
The Supply, Delivery, Erection, Maintenance and Repair of Fencing and Gating
London Borough of Hillingdon · Local authority · Greater London
Incumbent: CYRIL SMITH FENCING LIMITED · Last contest: 2 bids · awarded 8% over the estimate
The London Borough of Hillingdon owns a housing stock of approximately 10,000 properties located on a number of estates within the geographical area of the Borough. The Council also provides services to residents from a number of corporate …
Re-procurement plannedThe Supply, Delivery, Erection, Maintenance and Repair of Fencing and Gating · tender expected
- Published value
- £1.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 6 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03268e
- Estimated end · in 284 daysFramework recordPanel · 31 suppliers
DEMOLITION WORKS & ASBESTOS SURVEYING
The Association of North East Councils Limited · Local authority · Nationwide (UK), North East England
Panel: A.BUCKLER HAULAGE LIMITED, APEC Environmental Limited, Acorn Analytical Services +28 more
- Published value
- £100mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 7 Aug 2027 · start not published
- Reference
ocds-h6vhtk-04838c
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 1 - England & Wales - Lower £0 - £10m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03eb9d
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 2 - England & Wales - Lower £0 - £10m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Kier Construction Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03eb9e
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 3 - England & Wales - Upper £7.5m - £100m
Scape Group Limited (trading as SCAPE) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Willmott Dixon Construction Limited
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03eb9f
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 4 - England & Wales - Upper £7.5m - £100m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03eba0
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 1 - England & Wales - Lower £0 - £10m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0444f7
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 2 - England & Wales - Lower £0 - £10m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Kier Construction Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0444f8
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 3 - England & Wales - Upper £7.5m - £100m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Willmott Dixon Construction Limited
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0444f9
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 4 - England & Wales - Upper £7.5m - £100m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0444fa
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 7 - England, Wales & Northern Ireland - Principal £75m plus
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: JOHN SISK & SON (HOLDINGS) LTD
- Published value
- £1.5bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0444fd
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 8 - England & Wales - Upper £7.5m - £100m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: MACE LTD
- Published value
- £1.5bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-04451b
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 5 - Northern Ireland - Lower £0 - £10m
Scape Group Limited (trading as SCAPE) · Northern Ireland
Incumbent: John Graham Construction Ltd
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03eba1
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 6 - Northern Ireland - Upper £7.5m - £100m
Scape Group Limited (trading as SCAPE) · Northern Ireland
Incumbent: McLaughlin and Harvey Limited
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03eba2
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 5 - Northern Ireland - Lower £0 - £10m
Scape Group Limited (trading as SCAPE) · Northern Ireland
Incumbent: John Graham Construction Ltd
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0444fb
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 6 - Northern Ireland - Upper £7.5m - £100m
Scape Group Limited (trading as SCAPE) · Northern Ireland
Incumbent: McLaughlin and Harvey Limited
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0444fc
- Estimated end · in 286 daysFramework recordPanel · 2 suppliers
Quality Trusted Solutions (QTS) Find a Tender Service Minor Works Framework - Lot 1 Minor Works
Quality Trusted Solutions LLP · Greater London, South East England
Panel: GD Construction Ltd, Thomas Sinden Limited
- Published value
- £100mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 9 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0373e8
- Ends · in 286 days
Mine Shaft and Shallow Workings Treatment on Stowheath andLoxdale
Wolverhampton City Council · Local authority · West Midlands
Incumbent: Soil Engineering Geoservices Limited
City of Wolverhampton Council (CWC) sought to appoint a contractor to undertake mineshaft treatment and remediation works at the Council-owned sites at Loxdale and Stowheath, in order to enable the sites to be brought forward for residentia…
- Published value
- £2.6minc. VAT as published
- Annual run-rate
- £1.9mpublished value ÷ term, inc. VAT
- Term
- 24 Mar 2026 → 9 Aug 2027 · 1.4 yrs
- Reference
ocds-h6vhtk-055bb8
- Ends · in 286 days
Hire arrangement
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: ANDREWS SYKES GROUP PLC
1608 -This is an extension of the existing hire arrangement and not a new goods/service requirement. A Single Tender Waiver is being raised to cover the additional five-week extension period
- Published value
- £22k
- Annual run-rate
- £22kpublished value ÷ term, exc. VAT
- Term
- 10 Aug 2026 → 9 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-06e01c
- Ends · in 287 daysExtension option · up to 10 Nov 2027
Temple Marsh Landscape Works
Medway Council · Local authority · South East England
Incumbent: PVR Contracting Limited
Provision of landscaping works at Temple Marsh. The contract will involve, landscaping and pathway works The Contract will be for an initial period of 1 years with an option to extend for a further period of 3 months. The maximum contract t…
- Published value
- £291k
- Annual run-rate
- £291kpublished value ÷ term, exc. VAT
- Term
- 11 Aug 2026 → 10 Aug 2027 · 1 yr · up to 10 Nov 2027 with extensions
- Reference
ocds-h6vhtk-069bef
- Ends · in 287 daysExtension option · up to 10 Nov 2027
Temple Marsh River Wall Works
Medway Council · Local authority · South East England
Incumbent: Suttle Projects Limited
Provision of River Wall works at Temple Marsh. The contract will involve, landscaping and pathway works The Contract will be for an initial period of 1 years with an option to extend for a further period of 3 months. The maximum contract te…
- Published value
- £239k
- Annual run-rate
- £239kpublished value ÷ term, exc. VAT
- Term
- 11 Aug 2026 → 10 Aug 2027 · 1 yr · up to 10 Nov 2027 with extensions
- Reference
ocds-h6vhtk-069bf5
- Ends · in 287 days
Leodis Commercial Limited
Great Places Housing Group · Housing · North West England
Incumbent: LEODIS COMMERCIAL LTD
Leodis Commercial Limited - works to Render in Sheffield Richmond Park
- Published value
- £83k
- Annual run-rate
- £42kpublished value ÷ term, exc. VAT
- Term
- 11 Aug 2025 → 10 Aug 2027 · 2 yrs
- Reference
ocds-h6vhtk-06bde8
- Estimated end · in 288 daysFramework record
Spray Injection Patching - Pothole Repairs
CORSERV LIMITED · Nationwide (UK)
Incumbent: Velocity UK Ltd
CORMAC Solutions Ltd is inviting tenders for spray injection patching repairs of potholes and carriageway defects across Cornwall’s highway network to the value of approximately £1.5 million per year. The programme is due to run for 36 mont…
- Published value
- £6.0mlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 11 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03e0f3
- Ends · in 290 days
Construction Works at Farnborough and Bessborough Sites, SW15 (Passivhaus)
London Borough of Wandsworth · Local authority · Greater London
Incumbent: Kind & Co (Builders) Ltd · Last contest: 7 bids · awarded 6% over the estimate
Bessborough:<br/><br/>Design and Construction of 8 independent supported housing units and associated landscaping and car parking on Bessborough Road, Roehampton
- Published value
- £24m
- Annual run-rate
- —start date not published
- Term
- Ends 13 Aug 2027 · start not published
- Reference
ocds-h6vhtk-04c90e
- Ends · in 290 daysExtension option
Graig Ddu, Dinas, Tip Stabilisation
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: Alun Griffiths (Contractors) Limited (a6 a8 a9 b3 b4 b5 c3 c4 c5 d2 d3)
Graig Ddu Tip (RH077), Dinas, is a historical coal and quarry site within Rhondda Cynon Taff County Borough Council (RCTCBC). The site is located on the northern slopes of Mynydd Dinas above Graig Ddu Road. The purpose of the proposed works…
- Published value
- £3.6m
- Annual run-rate
- £2.3mpublished value ÷ term, exc. VAT
- Term
- 19 Jan 2026 → 13 Aug 2027 · 1.6 yrs
- Reference
ocds-h6vhtk-06e107
- Ends · in 290 daysExtension option · up to 15 Aug 2030
Refurbishment of utility blocks 1 and 2 Middle Ground
Oxfordshire County Council · Local authority · Nationwide (UK)
Incumbent: CURTIS BUILDING SERVICES LIMITED
Refurbishment of utility blocks 7 and 8, to include new bathrooms and kitchens, new heating, rewiring, redecoration, new flooring and associated works.
- Published value
- £107k
- Annual run-rate
- £99kpublished value ÷ term, exc. VAT
- Term
- 15 Jul 2026 → 13 Aug 2027 · 1.1 yrs · up to 15 Aug 2030 with extensions
- Reference
ocds-h6vhtk-077557
- Ends · in 290 days
Works
NOTTING HILL GENESIS · Other public body · Greater London
Incumbent: POSH MAINTENANCE (SOUTH-EAST) LIMITED
Building Works
- Published value
- £35k
- Annual run-rate
- £19kpublished value ÷ term, exc. VAT
- Term
- 24 Sept 2025 → 13 Aug 2027 · 1.9 yrs
- Reference
ocds-h6vhtk-078b40
- Estimated end · in 292 days
Damp & Mould Remedials Contract
Babergh District Council · Local authority · East of England
Incumbent: Principle Construction And Maintenance Ltd · Last contest: 4 bids (4 SME)
Babergh District Council and Mid Suffolk District Council are looking to jointly procure one Contractor for the delivery of their Damp andMould Remedial Works Contract.The estimated annual combined contract values are circa GBP250000.00 to …
- Published value
- £1.8m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0495f2
- Estimated end · in 292 days
Damp & Mould Remedial Consultancy Contract
Babergh District Council · Local authority · East of England
Incumbent: Compliance 100 Ltd · Last contest: 4 bids (4 SME)
- Published value
- £1.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0495f2
- Estimated end · in 292 days
DMNV 028 - Biochar Pyrolysis Production Plant - Ludlow
Shropshire Council · Local authority · West Midlands
Incumbent: Biodynamic Carbon Limited · Last contest: 2 bids (2 SME) · awarded 43% over the estimate
This is an award notice for the design, procurement, construction, commissioning and operation and maintenance of a biomass Pyrolysis Plant. This includes the provision of instrumentation, control and automation of the equipment, civils and…
- Published value
- £1.6m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Aug 2027 · start not published
- Reference
ocds-h6vhtk-046fb4
- Ends · in 293 daysExtension option · up to 16 Aug 2028
Solar PV supply and installations works
East Midlands Housing Group · Housing · East Midlands
Incumbent: Phoenix Gas Services Ltd
To supply and install Solar PV to social housing.
- Published value
- £2.0m
- Annual run-rate
- £2.0mpublished value ÷ term, exc. VAT
- Term
- 17 Aug 2026 → 16 Aug 2027 · 1 yr · up to 16 Aug 2028 with extensions
- Reference
ocds-h6vhtk-06e57f
- Ends · in 293 days
Office Works
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: James Roofing & Construction Ltd
Capital Expenditure Goodmayes Relocate Estates 1. Strip Out & Enabling Works Provide all labour, plant, supervision, access equipment and waste disposal required to complete the initial strip out and preparation works. 2. Acoustic, Fire-Rat…
- Published value
- £156k
- Annual run-rate
- £156kpublished value ÷ term, exc. VAT
- Term
- 17 Aug 2026 → 16 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-06e929
- Ends · in 294 days
Replacement air conditioning unit Cavendish Road.
Stevenage Borough Council · Local authority · East of England
Incumbent: Pitkin and Ruddock
Cavendish Road. Replacement air conditioning units to serve the Server Room.
- Published value
- £29k
- Annual run-rate
- £29kpublished value ÷ term, exc. VAT
- Term
- 17 Aug 2026 → 17 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-0773c1
- Estimated end · in 296 days
Hawkwood Road Redevelopment - Main Build
Bournemouth, Christchurch and Poole Council · Local authority · South West England
Incumbent: AJC Developments (South) Ltd · Last contest: 4 bids (4 SME)
The construction of 68 residential flats and a medical centre over three buildings, creation of a new park, bike stores, refuse bin stores, associated parking, any highway works required and all associated hard and soft landscaping at the m…
- Published value
- £18m
- Annual run-rate
- —start date not published
- Term
- Estimated end 19 Aug 2027 · start not published
- Reference
ocds-h6vhtk-04b0da
- Ends · in 296 days
Harrington Hill Primary School - Appointment of a multi disciplinary consultant to design, manage and provide contract administration
London Borough of Hackney · Local authority · Greater London
Incumbent: Daniel Connal LLP
Appointment of a multi disciplinary consultant to design, manage and provide contract administration for the project to provide a safe and suitable play area to support the Council’s school reorganisation strategy.
- Published value
- £33k
- Annual run-rate
- £22kpublished value ÷ term, exc. VAT
- Term
- 9 Feb 2026 → 19 Aug 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-064a1b
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.