Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 76–100
- Ends · in 3 days
Hot water cylinder (domestic) Unvented and Individual Domestic gas boilers
Housing 21 · Central government · North West England
Incumbent: GOS Heating
Hot water cylinder (domestic) Unvented and Individual Domestic gas boilers at Carlton Crescent.
- Published value
- £62k
- Annual run-rate
- —term under 6 months
- Term
- 7 Sept 2026 → 30 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06dedb
- Ends · in 3 days
Garage Demolition & Hoarding at Lane B, Garages at Pyrles Lane, Loughton
Epping Forest District Council · Local authority · East of England
Incumbent: MASTERMAC CIVILS LIMITED
Contract for Garage Demolition & Hoarding at Lane B, Garages at Pyrles Lane, Loughton
- Published value
- £60k
- Annual run-rate
- —term under 6 months
- Term
- 1 Jun 2026 → 30 Oct 2026 · 5 months
- Reference
ocds-h6vhtk-06d562
- Ends · in 3 days
Skippers Lane - Virgin Media Additional Diversion Works
Redcar and Cleveland Borough Council · Local authority · North East England
Incumbent: Virgin Media Business Ltd
Additional Virgin Media diversion works required for Skippers Lane civils works.
- Published value
- £58k
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 30 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06f947
- Ends · in 3 days
YGG Abercynon - Concrete Repairs
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: GKR MAINTENANCE & BUILDING CO. LTD
YGG Abercynon - Concrete Repairs 2026
- Published value
- £57k
- Annual run-rate
- —term under 6 months
- Term
- 16 Jul 2026 → 30 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06d30c
- Ends · in 3 days
Lightning Protection Schools
London Borough of Harrow · Local authority · Greater London
Incumbent: EUROSAFE COMPLIANCE LIMITED
Following the completion of re-roofing works at Stanburn Primary School, the existing lightning protection system requires reinstatement. A survey undertaken by Eurosafe has confirmed that there is currently no suitable lightning protection…
- Published value
- £52k
- Annual run-rate
- —term under 6 months
- Term
- 19 Oct 2026 → 30 Oct 2026 · 12 days
- Reference
ocds-h6vhtk-06fada
- Ends · in 3 days
YNE Form C Pont and Blyth
ENVIRONMENT AGENCY · Other public body · North East England
Incumbent: Northumberland Wildlife Trust
A highly specialized peat restoration project, for which NWT/NPP has proven expertise, having closely collaborated with the EA Peatland team in its development. Their depth of knowledge in this area is unparalleled by any other consultants …
- Published value
- £50k
- Annual run-rate
- £29kpublished value ÷ term, exc. VAT
- Term
- 31 Jan 2025 → 30 Oct 2026 · 1.8 yrs
- Reference
ocds-h6vhtk-06dda0
- Ends · in 3 days
Willesborough Infant School: Roof Repair
Kent County Council · Local authority
Incumbent: GJM Southern Group Ltd
Willesborough Infant School: Roof Repair - Structural repair works to failing lintels in the main building. The cost would be £49,837.44
- Published value
- £50k
- Annual run-rate
- —term under 6 months
- Term
- 21 Aug 2026 → 30 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06ea7f
- Ends · in 3 days
1-2 Edgar Buildings Refurbishment Works
Bath & North East Somerset Council · Local authority · South West England
Incumbent: NKS Contracts Limited
1-2 Edgar Buildings Refurbishment Works The total value of this contract's 1 month term is £49,681.65 (excl. VAT) The total value of this contract's 1 month term is £59,617.98 (incl. VAT)
- Published value
- £50k
- Annual run-rate
- —term under 6 months
- Term
- 18 Oct 2026 → 30 Oct 2026 · 13 days
- Reference
ocds-h6vhtk-07837d
- Ends · in 3 days
Williamstown Primary New ALN Room
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: 2D Building Contractors
Williamstown Primary New ALN Room 2026
- Published value
- £49k
- Annual run-rate
- —term under 6 months
- Term
- 16 Jul 2026 → 30 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06d311
- Ends · in 3 days
Block TA roof renewal and external wall cladding repairs
Somerset Council · Local authority · South West England
Incumbent: CIG SW LTD
Urgent D1 priority condition maintenance works involving the replacement of Block TA life-expired flat roof coverings, repairs to external Steni wall-cladding panels and renewal of timber entrance door
- Published value
- £48k
- Annual run-rate
- —term under 6 months
- Term
- 12 Aug 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-0774d6
- Ends · in 3 days
St Pauls Boundary wall repair
Somerset Council · Local authority · South West England
Incumbent: Abacus Construction Ltd
to rebuild the boundary wall-repair
- Published value
- £47k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06cc3f
- Ends · in 3 days
Little Dewchurch Primary Boiler Upgrade
Herefordshire Council · Local authority · West Midlands
Incumbent: CF Roberts (Electrical Contractors) Limited
Boiler upgrade works at Little Dewchurch Primary School
- Published value
- £47k
- Annual run-rate
- —term under 6 months
- Term
- 25 Sept 2026 → 30 Oct 2026 · 36 days
- Reference
ocds-h6vhtk-07887a
- Ends · in 3 days
Scooter Store
Housing 21 · Central government · West Midlands
Incumbent: CLC Contractors Ltd
Scooter Store - Howard Court (Flitwick)
- Published value
- £46k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 30 Oct 2026 · 26 days
- Reference
ocds-h6vhtk-06d842
- Ends · in 3 daysExtension option · up to 30 Dec 2026
Installation Works for the Reintroduce of Grazing Cattle
South Gloucestershire Council · Local authority · South West England
Incumbent: CABOT LANDSCAPES LTD
Infrastructure works for the re-introduction of grazing cattle on Siston Common, including drainage works, cycle cattle grids, fencing and gate installation. The required installation works were identified through a funded survey.
- Published value
- £45k
- Annual run-rate
- —term under 6 months
- Term
- 6 Aug 2026 → 30 Oct 2026 · 3 months · up to 30 Dec 2026 with extensions
- Reference
ocds-h6vhtk-077480
- Ends · in 3 days
Unisex Toilets
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Wright Construction Ltd
Construct, supply and install 2 No. Unisex in Block E Gr. Floor.
- Published value
- £45k
- Annual run-rate
- £44kpublished value ÷ term, exc. VAT
- Term
- 29 Oct 2025 → 30 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-05d978
- Ends · in 3 days
STA1540 Engineering work on THV Galatea
Corporation of Trinity House · Central government · Nationwide (UK)
Incumbent: PALFINGER MARINE EUROPE BV
2 x engineers to attend and complete work on the PFH 80 Davit system •Install new hyd. motors and load pins •Function test system This includes parts/software supply for new PLC, engineers working & travel hours
- Published value
- €44,035
- Annual run-rate
- —not a GBP value
- Term
- 4 Oct 2026 → 30 Oct 2026 · 27 days
- Reference
ocds-h6vhtk-06cf68
- Ends · in 3 days
– Avonmore Ward External Windows and Doors Replacement
West London NHS Trust · Central government
Incumbent: Commercial Services UK Ltd
Principal contractor services for the replacement of external windows and doors at Avonmore Ward, including removal of existing installations, installation of new secure Britplas windows and doors, associated ironmongery, repairs to externa…
- Published value
- £44k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 30 Oct 2026 · 26 days
- Reference
ocds-h6vhtk-06ebed
- Ends · in 3 days
King Charles III England Coast Path - Surfacing Scheme: Afton Down
Isle of Wight NHS Trust · Local authority · South East England
Incumbent: M.C.M. CONSTRUCTION LIMITED
Chalk path surfacing of a section of the King Charles III England Coast Path (ECP) at Afton Down (following the route of the Tennyson Trail) for a distance of approximately 850 metres. This scheme is 100% funded by an ECP establishment gran…
- Published value
- £41k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 30 Oct 2026 · 30 days
- Reference
ocds-h6vhtk-0788fd
- Ends · in 3 days
Shobdon Primary Boiler Upgrade Works
Herefordshire Council · Local authority · West Midlands
Incumbent: CF Roberts (Electrical Contractors) Limited
Boiler upgrade works at Shobdon Primary School, Herefordshire. £40,580 with JCT Minor Works with Contractor's Design Contract.
- Published value
- £41k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 30 Oct 2026 · 33 days
- Reference
ocds-h6vhtk-07886b
- Ends · in 3 days
Fire Stopping Rood and Communal Areas
Housing 21 · Central government · East of England
Incumbent: CLC Contractors Ltd
To complete all fire stopping in both the roof void and the communal areas.
- Published value
- £39k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 30 Oct 2026 · 26 days
- Reference
ocds-h6vhtk-07892c
- Ends · in 3 days
Hard & Soft landscaping works
Blaenau Gwent County Borough Council · Local authority · Wales (Cymru)
Incumbent: Tillery Action For You Ltd
Nature of the work: Soft landscaping works • Supply and installation of fencing • Installation of concrete bee posts • Graphic design of information panel • Supply and installation of information panel • Use of herbicides • Grubbing out of …
- Published value
- £39k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 30 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-07791f
- Ends · in 3 days
Gwaunmeisgyn Primary School - New ALN Room and External Work
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: GKR MAINTENANCE & BUILDING CO. LTD
Gwaunmeisgyn Primary School - New ALN Room and External Work 2026
- Published value
- £39k
- Annual run-rate
- —term under 6 months
- Term
- 17 Jul 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06d894
- Ends · in 3 days
Fort Nelson Remedial Works to the West Gate
Hampshire County Council · Local authority · South East England
Incumbent: B & M Clark (Builders) Limited
The following rectification measure to the Upper West Gate are proposed by Hampshire County Council's Property Services Department. Primary Measures The left-hand side gate leaf (when viewed from within the Fort), will be dismantled and tra…
- Published value
- £38k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 30 Oct 2026 · 33 days
- Reference
ocds-h6vhtk-0789c2
- Ends · in 3 days
Guildhall Banqueting Hall Floor
Bath & North East Somerset Council · Local authority · South West England
Incumbent: NKS Contracts Limited
Guildhall Banqueting Hall Floor - Structural Beam Repairs The total value of this contract's 9 month term is £35,665.45 (excl. VAT) The total value of this contract's 9 month term is £42,798.54 (incl. VAT)
- Published value
- £36k
- Annual run-rate
- £46kpublished value ÷ term, exc. VAT
- Term
- 20 Jan 2026 → 30 Oct 2026 · 9 months
- Reference
ocds-h6vhtk-06f080
- Ends · in 3 days
SBC0926 (41 Coventry Close - Refurbishment Works - Void Property)
Stevenage Borough Council · Local authority · East of England
Incumbent: Foster & Shackell Ltd
Refurbishment works to 1bed bungalow after internal asbestos wall removed (Works include new internal walls, new ceilings, new kitchen, bathroom, and full rewire, full re-decoration and other works to achieve SBC Lettable standard
- Published value
- £36kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 30 Oct 2026 · 33 days
- Reference
ocds-h6vhtk-07784e
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.