Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 41–50

  1. Ends · in 216 daysCall-offPanel · 3 suppliers

    Lot 5 - Other Wheeled Sports Areas - Asphalt

    ESPO · Nationwide (UK)

    Panel: BACK-ON-TRACK MOUNTAIN BIKE SOLUTIONS LIMITED, Safeplay Playground Services Ltd, eibe Play LTD (Eibeplay Limited) · Last contest: 50 bids (48 SME)

    An ESPO national framework for the design, supply, delivery, installation, maintenance and inspection of Outdoor Playground Equipment, Outdoor Fitness Equipment, Skate/BMX Parks, Parkour, Multi Use Games Areas, Water Play Areas and Sports A…

    • Playground equipment
    Published value
    £140mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  2. Ends · in 216 daysCall-offPanel · 10 suppliers

    Lot 6 - Outdoor Fitness Equipment

    ESPO · Nationwide (UK)

    Panel: CREATIVE PLAY (UK) LIMITED, Dragon Play and Sports, HAGS SMP Ltd +7 more · Last contest: 50 bids (48 SME)

    An ESPO national framework for the design, supply, delivery, installation, maintenance and inspection of Outdoor Playground Equipment, Outdoor Fitness Equipment, Skate/BMX Parks, Parkour, Multi Use Games Areas, Water Play Areas and Sports A…

    • Playground equipment
    Published value
    £140mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  3. Ends · in 217 daysFramework record

    YPO - 001188 Early Years Furniture (Contractual)

    YPO · Nationwide (UK)

    Incumbent: Spaceright Europe Limited

    • Toys
    Published value
    £4.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 1 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-03b4b6
  4. Estimated end · in 240 days

    Supply, Installation and Maintenance of Cardiovascular, Resistance and Plate Loaded Equipment

    North Ayrshire Leisure Limited · Scotland

    Incumbent: PULSE FITNESS LIMITED · Last contest: 2 bids (1 SME)

    Supply, installation, ongoing maintenance and servicing of fitness equipment

    • Fitness equipments
    Published value
    £172k
    Annual run-rate
    —start date not published
    Term
    Estimated end 24 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-03106c
  5. Estimated end · in 240 days

    Supply, Installation and Maintenance of Strength Equipment (Free Weights)

    North Ayrshire Leisure Limited · Scotland

    Incumbent: PULSE FITNESS LIMITED · Last contest: 4 bids (3 SME)

    Supply, installation, ongoing maintenance and servicing of fitness equipment

    • Fitness equipments
    Published value
    £37k
    Annual run-rate
    —start date not published
    Term
    Estimated end 24 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-03106c
  6. Estimated end · in 240 days

    Supply and Installation of Functional Equipment

    North Ayrshire Leisure Limited · Scotland

    Incumbent: PULSE FITNESS LIMITED · Last contest: 3 bids (2 SME)

    Supply, installation, ongoing maintenance and servicing of fitness equipment

    • Fitness equipments
    Published value
    £12k
    Annual run-rate
    —start date not published
    Term
    Estimated end 24 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-03106c
  7. Ends · in 246 days

    Provision of Tottenham Parks Play Improvements

    London Borough of Haringey · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Proludic

    Some of the play equipment in the existing playgrounds at Bruce Castle Park, Downhills Park, Lordship Recreation Ground and Markfield Park is at the end of life and needs to be replaced soon. This is to ensure the safety of children using t…

    Published value
    £243k
    Annual run-rate
    £203kpublished value ÷ term, exc. VAT
    Term
    20 Apr 2026 → 30 Jun 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-05e1ca
  8. Ends · in 246 days

    Provision of Tottenham Parks Play Improvements

    London Borough of Haringey · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Wicksteed Leisure Ltd

    Some of the play equipment in the existing playgrounds at Bruce Castle Park, Downhills Park, Lordship Recreation Ground and Markfield Park is at the end of life and needs to be replaced soon. This is to ensure the safety of children using t…

    Published value
    £209k
    Annual run-rate
    £177kpublished value ÷ term, exc. VAT
    Term
    27 Apr 2026 → 30 Jun 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-05e1ca
  9. Ends · in 246 days

    Provision of Tottenham Parks Play Improvements

    London Borough of Haringey · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Wicksteed Leisure Ltd

    Some of the play equipment in the existing playgrounds at Bruce Castle Park, Downhills Park, Lordship Recreation Ground and Markfield Park is at the end of life and needs to be replaced soon. This is to ensure the safety of children using t…

    Published value
    £208k
    Annual run-rate
    £175kpublished value ÷ term, exc. VAT
    Term
    24 Apr 2026 → 30 Jun 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-05e1ca
  10. Ends · in 246 days

    Provision of Tottenham Parks Play Improvements

    London Borough of Haringey · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Proludic

    Some of the play equipment in the existing playgrounds at Bruce Castle Park, Downhills Park, Lordship Recreation Ground and Markfield Park is at the end of life and needs to be replaced soon. This is to ensure the safety of children using t…

    Published value
    £179k
    Annual run-rate
    £152kpublished value ÷ term, exc. VAT
    Term
    27 Apr 2026 → 30 Jun 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-05e1ca

When contracts end · Musical instruments, sport, games
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

84 contracts and agreements end within 24 months, 130 in total · £4.3m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months7
  2. 3–6 months15
  3. 6–12 months41
  4. 12–24 months21

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.