Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 51–60

  1. Ends · in 96 days

    UKRI-6406 STFC ISIS HT Power Supplies

    UK Research and Innovation · Central government · South East England

    Incumbent: KC Scientific Ltd

    Procurement of HT power supplies for HRPD-X

    Published value
    £29k
    Annual run-rate
    —term under 6 months
    Term
    25 Sept 2026 → 31 Jan 2027 · 4 months
    Reference
    ocds-h6vhtk-077ac7
  2. Ends · in 97 daysFramework record

    Witney Town Council Christmas Lights 2024-27

    Witney Town Council · Local authority · South East England

    Incumbent: LIGHTING & ILLUMINATION TECHNOLOGY EXPERIENCE LIMITED

    • Electrical machinery, apparatus, equipment and consumables; lighting
    Published value
    £134kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 1 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-0451a0
  3. Ends · in 97 days

    Cliff Lane Carpark Civils Work

    Wakefield Council · Local authority · Yorkshire and the Humber

    Incumbent: Applebridge Construction Limited

    Redevelopment of Cliff Lane Carpark including EV chargers. Details within original contract were incorrect this is for initially feasibility of the project site. Value has been amended to reflect change.

    Published value
    £3kinc. VAT as published
    Annual run-rate
    £5kpublished value ÷ term, inc. VAT
    Term
    17 Jul 2026 → 1 Feb 2027 · 7 months
    Reference
    ocds-h6vhtk-06ba9c
  4. Ends · in 100 days

    Transformer supply

    Cambridge University Hospitals NHS Foundation Trust · Central government · East of England

    Incumbent: RJ POWER NETWORKS LTD

    705 - High voltage transformed supply.

    Published value
    £83k
    Annual run-rate
    £83kpublished value ÷ term, exc. VAT
    Term
    5 Feb 2026 → 4 Feb 2027 · 1 yr
    Reference
    ocds-h6vhtk-0648f4
  5. Ends · in 100 days

    DDaT26079 - Rothera Switches

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: CDW Limited

    ****THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION*** UKRI had a requirement for the provision of Network Switches and Support Services. This procurement is being concluded following a limited competition procurement exercise…

    Published value
    £79k
    Annual run-rate
    £79kpublished value ÷ term, exc. VAT
    Term
    4 Feb 2026 → 4 Feb 2027 · 1 yr
    Reference
    ocds-h6vhtk-065846
  6. Estimated end · in 103 daysPanel · 3 suppliers

    Electromagnetic Flowmeters

    NORTHERN IRELAND WATER LIMITED · Northern Ireland

    Panel: Ashdale Engineering Ltd, Badger Meter UK, Parkelect Ltd · Last contest: 4 bids

    This Contract is for the supply and delivery of Instrumentation, Control and Automation (ICA) equipment and spare parts The Contract is split into 8 lots, these being: • Lot 1 - Supply and delivery of Magnetic Flowmeter Equipment and Spare …

    • Instrumentation and control equipment

    Re-procurement plannedInstrumentation, Control & Automation (ICA)

    Published value
    £698k
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 7 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-040c46
  7. Estimated end · in 103 daysPanel · 3 suppliers

    Flow Measuring Equipment

    NORTHERN IRELAND WATER LIMITED · Northern Ireland

    Panel: Ashdale Engineering Ltd, Parkelect Ltd, Pulsar Process Measurements Ltd · Last contest: 3 bids

    This Contract is for the supply and delivery of Instrumentation, Control and Automation (ICA) equipment and spare parts The Contract is split into 8 lots, these being: • Lot 1 - Supply and delivery of Magnetic Flowmeter Equipment and Spare …

    • Instrumentation and control equipment

    Re-procurement plannedInstrumentation, Control & Automation (ICA)

    Published value
    £698k
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 7 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-040c46
  8. Estimated end · in 103 daysPanel · 3 suppliers

    Ultrasonic Level Measuring Equipment

    NORTHERN IRELAND WATER LIMITED · Northern Ireland

    Panel: Ashdale Engineering Ltd, Parkelect Ltd, Pulsar Process Measurements Ltd · Last contest: 3 bids

    This Contract is for the supply and delivery of Instrumentation, Control and Automation (ICA) equipment and spare parts The Contract is split into 8 lots, these being: • Lot 1 - Supply and delivery of Magnetic Flowmeter Equipment and Spare …

    • Instrumentation and control equipment

    Re-procurement plannedInstrumentation, Control & Automation (ICA)

    Published value
    £698k
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 7 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-040c46
  9. Estimated end · in 103 daysPanel · 3 suppliers

    Chlorine Measuring Analytical Equipment

    NORTHERN IRELAND WATER LIMITED · Northern Ireland

    Panel: Innovative Products Ltd, Parkelect Ltd, Process Instruments (UK) Ltd · Last contest: 7 bids

    This Contract is for the supply and delivery of Instrumentation, Control and Automation (ICA) equipment and spare parts The Contract is split into 8 lots, these being: • Lot 1 - Supply and delivery of Magnetic Flowmeter Equipment and Spare …

    • Instrumentation and control equipment

    Re-procurement plannedInstrumentation, Control & Automation (ICA)

    Published value
    £698k
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 7 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-040c46
  10. Estimated end · in 103 daysPanel · 3 suppliers

    Turbidity Measuring Analytical Equipment

    NORTHERN IRELAND WATER LIMITED · Northern Ireland

    Panel: Parkelect Ltd, Process Instruments (UK) Ltd, Xylem Water Solutions UK LTD · Last contest: 6 bids

    This Contract is for the supply and delivery of Instrumentation, Control and Automation (ICA) equipment and spare parts The Contract is split into 8 lots, these being: • Lot 1 - Supply and delivery of Magnetic Flowmeter Equipment and Spare …

    • Instrumentation and control equipment

    Re-procurement plannedInstrumentation, Control & Automation (ICA)

    Published value
    £698k
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 7 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-040c46

When contracts end · Electrical machinery
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

215 contracts and agreements end within 24 months, 325 in total · £65m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months47
  2. 3–6 months67
  3. 6–12 months40
  4. 12–24 months61

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.